36 KiB
Business Analyst (Analyst) - Workflow Mapping
Overview
This document provides comprehensive workflow mapping for the Business Analyst persona in the BMAD Method. It details the operational workflows for all three working modes, integration points with other personas, and decision-making processes.
Core Workflow Architecture
Workflow Entry Points
graph TD
A["Stakeholder Request"] --> B["Initial Assessment"]
C["Project Initiation"] --> B
D["Research Need"] --> B
E["Problem Identification"] --> B
B --> F["Mode Selection"]
F --> G["Brainstorming Mode"]
F --> H["Research Mode"]
F --> I["Briefing Mode"]
G --> J["Ideation Workflow"]
H --> K["Research Workflow"]
I --> L["Documentation Workflow"]
Mode Selection Decision Tree
graph TD
A["Analysis Request Received"] --> B{"Clear Problem Definition?"}
B -->|No| C["Brainstorming Mode"]
B -->|Yes| D{"Research Required?"}
D -->|Yes| E["Research Mode"]
D -->|No| F{"Documentation Needed?"}
F -->|Yes| G["Briefing Mode"]
F -->|No| H["Clarify Requirements"]
H --> A
C --> I["Ideation & Problem Framing"]
E --> J["Research Planning & Execution"]
G --> K["Project Documentation"]
I --> L{"Transition to Research?"}
L -->|Yes| E
L -->|No| M{"Transition to Briefing?"}
M -->|Yes| G
M -->|No| N["Complete Brainstorming"]
J --> O{"Transition to Briefing?"}
O -->|Yes| G
O -->|No| P["Complete Research"]
K --> Q["Complete Documentation"]
1. Brainstorming Mode Workflow
1.1 Ideation Workflow Process
graph TD
A["Brainstorming Request"] --> B["Context Gathering"]
B --> C["Problem Framing"]
C --> D["Stakeholder Alignment"]
D --> E["Session Planning"]
E --> F["Ideation Execution"]
F --> G["Idea Synthesis"]
G --> H["Insight Development"]
H --> I["Next Steps Planning"]
I --> J{"Transition Decision"}
J -->|Research Needed| K["Research Mode"]
J -->|Documentation Needed| L["Briefing Mode"]
J -->|Complete| M["Deliverable Handoff"]
1.2 Detailed Brainstorming Workflow
Phase 1: Context Gathering (Duration: 30-60 minutes)
Objective: Understand the challenge and establish session parameters
Activities:
-
Stakeholder Interview
- Identify primary challenge or opportunity
- Understand business context and constraints
- Clarify desired outcomes and success criteria
- Determine session participants and timeline
-
Background Research
- Review existing documentation and previous analysis
- Identify relevant industry examples or case studies
- Gather baseline data and current state information
- Understand competitive landscape if relevant
-
Constraint Identification
- Document technical limitations
- Identify resource constraints
- Understand regulatory or compliance requirements
- Clarify scope boundaries
Deliverables:
- Context summary document
- Stakeholder requirements matrix
- Constraint documentation
- Session planning brief
Quality Gates:
- Challenge is clearly articulated and understood
- Success criteria are specific and measurable
- Constraints are documented and validated
- Stakeholder expectations are aligned
Phase 2: Problem Framing (Duration: 45-90 minutes)
Objective: Structure the challenge for effective ideation
Activities:
-
Problem Statement Development
- Create clear, specific problem statements
- Use "How Might We" question formulation
- Validate problem framing with stakeholders
- Identify multiple problem perspectives
-
Assumption Mapping
- Document underlying assumptions
- Identify assumptions that need testing
- Prioritize assumptions by impact and uncertainty
- Plan assumption validation approach
-
Opportunity Identification
- Map current state and desired future state
- Identify gaps and improvement opportunities
- Assess opportunity size and feasibility
- Prioritize opportunities for ideation focus
Deliverables:
- Refined problem statements
- Assumption documentation
- Opportunity assessment
- Ideation focus areas
Quality Gates:
- Problem statements are specific and actionable
- Key assumptions are identified and documented
- Opportunities are prioritized and validated
- Ideation scope is clearly defined
Phase 3: Session Planning (Duration: 30-45 minutes)
Objective: Design effective ideation session structure
Activities:
-
Technique Selection
- Choose appropriate brainstorming techniques
- Plan session structure and timing
- Prepare materials and tools
- Design evaluation criteria
-
Participant Preparation
- Brief participants on session objectives
- Provide background materials
- Set expectations for participation
- Confirm logistics and technology needs
-
Facilitation Planning
- Prepare facilitation guide and prompts
- Plan warm-up activities
- Design idea capture methods
- Prepare evaluation frameworks
Deliverables:
- Session facilitation guide
- Participant briefing materials
- Evaluation criteria matrix
- Logistics confirmation
Quality Gates:
- Session design is appropriate for objectives
- Participants are properly prepared
- Facilitation approach is planned and tested
- Success metrics are defined
Phase 4: Ideation Execution (Duration: 60-120 minutes)
Objective: Generate and capture creative solutions
Activities:
-
Session Facilitation
- Execute planned session structure
- Facilitate idea generation using chosen techniques
- Encourage diverse perspectives and wild ideas
- Maintain energy and focus throughout session
-
Idea Capture
- Document all ideas without judgment
- Use visual and digital capture methods
- Ensure ideas are clearly articulated
- Capture context and rationale for ideas
-
Real-time Synthesis
- Group related ideas during session
- Identify emerging themes and patterns
- Build on promising concepts
- Note breakthrough moments and insights
Deliverables:
- Complete idea inventory
- Session notes and observations
- Preliminary idea groupings
- Participant feedback
Quality Gates:
- Sufficient quantity of ideas generated
- Ideas are clearly documented and understood
- Diverse perspectives are represented
- Session objectives are achieved
Phase 5: Idea Synthesis (Duration: 60-90 minutes)
Objective: Organize and evaluate generated ideas
Activities:
-
Idea Organization
- Group related ideas into themes
- Identify patterns and connections
- Create idea hierarchy and relationships
- Eliminate duplicates and combine similar concepts
-
Initial Evaluation
- Apply evaluation criteria to ideas
- Assess feasibility, impact, and alignment
- Identify top-tier ideas for further development
- Document evaluation rationale
-
Concept Development
- Develop promising ideas into concepts
- Add detail and implementation considerations
- Identify resource requirements and dependencies
- Assess risks and mitigation strategies
Deliverables:
- Organized idea inventory
- Evaluation matrix with scores
- Developed concept descriptions
- Implementation considerations
Quality Gates:
- Ideas are logically organized and categorized
- Evaluation is systematic and documented
- Top concepts are well-developed
- Implementation feasibility is assessed
Phase 6: Insight Development (Duration: 45-60 minutes)
Objective: Extract key insights and learnings
Activities:
-
Pattern Analysis
- Identify recurring themes across ideas
- Analyze what makes certain ideas compelling
- Understand underlying principles and approaches
- Extract generalizable insights
-
Breakthrough Identification
- Identify truly innovative or disruptive ideas
- Understand what enabled breakthrough thinking
- Assess potential for competitive advantage
- Plan further exploration of breakthrough concepts
-
Learning Synthesis
- Document key learnings about the problem space
- Identify validated and challenged assumptions
- Understand stakeholder perspectives and priorities
- Extract insights about solution approaches
Deliverables:
- Key insights summary
- Breakthrough concept documentation
- Learning and assumption updates
- Pattern analysis report
Quality Gates:
- Key insights are clearly articulated
- Breakthrough concepts are identified and documented
- Learnings are actionable and valuable
- Assumptions are updated based on insights
Phase 7: Next Steps Planning (Duration: 30-45 minutes)
Objective: Plan follow-up actions and transitions
Activities:
-
Action Planning
- Identify immediate next steps for top concepts
- Plan research or validation activities
- Assign ownership and timelines
- Define success criteria for next phase
-
Transition Planning
- Determine if research mode is needed
- Plan briefing mode if documentation required
- Identify additional stakeholders to engage
- Plan communication of results
-
Resource Planning
- Estimate resource requirements for next steps
- Identify skill gaps or external expertise needed
- Plan budget and timeline for follow-up work
- Secure necessary approvals and commitments
Deliverables:
- Action plan with owners and timelines
- Transition plan to next mode
- Resource requirements assessment
- Stakeholder communication plan
Quality Gates:
- Next steps are specific and actionable
- Resource requirements are realistic
- Transition plan is clear and agreed upon
- Success criteria are defined
1.3 Brainstorming Mode Integration Points
Upstream Integrations
From Stakeholders:
- Business challenges and opportunities
- Strategic objectives and constraints
- Resource availability and limitations
- Timeline requirements and expectations
From Product Managers:
- Market context and competitive intelligence
- User needs and pain points
- Product strategy and roadmap considerations
- Business case requirements
Downstream Handoffs
To Research Mode:
- Prioritized research questions
- Hypothesis to validate
- Research scope and methodology recommendations
- Success criteria for research activities
To Briefing Mode:
- Developed concepts and recommendations
- Implementation considerations
- Stakeholder alignment requirements
- Documentation scope and format needs
To Other Personas:
- System Architect: Technical feasibility questions and concept requirements
- Product Owner: Feature concepts and user story development needs
- UX/UI Architect: Design requirements and user experience considerations
2. Research Mode Workflow
2.1 Research Planning and Execution Workflow
graph TD
A["Research Request"] --> B["Objective Definition"]
B --> C["Research Design"]
C --> D["Resource Planning"]
D --> E["Data Collection"]
E --> F["Analysis Execution"]
F --> G["Validation & Verification"]
G --> H["Insight Synthesis"]
H --> I["Findings Documentation"]
I --> J{"Transition Decision"}
J -->|Briefing Needed| K["Briefing Mode"]
J -->|Additional Research| L["Research Iteration"]
J -->|Complete| M["Research Handoff"]
2.2 Detailed Research Workflow
Phase 1: Objective Definition (Duration: 60-90 minutes)
Objective: Establish clear research objectives and success criteria
Activities:
-
Research Question Formulation
- Transform business questions into research questions
- Ensure questions are specific and answerable
- Prioritize questions by business impact
- Define success criteria for each question
-
Scope Definition
- Determine research boundaries and limitations
- Identify what will and won't be covered
- Set timeline and resource constraints
- Align scope with stakeholder expectations
-
Hypothesis Development
- Formulate testable hypotheses where appropriate
- Identify assumptions to validate or challenge
- Plan hypothesis testing approach
- Define evidence requirements for validation
Deliverables:
- Research objectives document
- Prioritized research questions
- Scope definition and boundaries
- Hypothesis framework
Quality Gates:
- Research questions are specific and answerable
- Scope is realistic and well-defined
- Success criteria are measurable
- Stakeholder alignment is confirmed
Phase 2: Research Design (Duration: 90-120 minutes)
Objective: Design comprehensive research methodology
Activities:
-
Methodology Selection
- Choose appropriate research methods
- Design mixed-methods approach if needed
- Plan quantitative and qualitative components
- Validate methodology with research objectives
-
Data Source Identification
- Identify primary and secondary data sources
- Assess data availability and accessibility
- Plan data collection methods and tools
- Establish data quality criteria
-
Analysis Framework Development
- Design analysis approach and techniques
- Plan statistical or thematic analysis methods
- Create evaluation criteria and frameworks
- Plan validation and verification approaches
Deliverables:
- Research methodology document
- Data source inventory
- Analysis framework
- Quality assurance plan
Quality Gates:
- Methodology is appropriate for objectives
- Data sources are credible and accessible
- Analysis approach is systematic and rigorous
- Quality standards are defined
Phase 3: Resource Planning (Duration: 45-60 minutes)
Objective: Plan and secure necessary resources
Activities:
-
Team and Skill Planning
- Identify required expertise and skills
- Plan team composition and roles
- Assess training or external support needs
- Establish collaboration protocols
-
Tool and Technology Planning
- Select research tools and platforms
- Plan data collection and analysis technology
- Ensure access to required systems
- Plan backup and contingency tools
-
Timeline and Budget Planning
- Create detailed project timeline
- Estimate resource costs and requirements
- Plan milestone and checkpoint schedule
- Establish contingency plans
Deliverables:
- Resource requirements plan
- Project timeline with milestones
- Budget estimate and approval
- Risk mitigation plan
Quality Gates:
- Resource requirements are realistic
- Timeline allows for quality execution
- Budget is approved and adequate
- Risk mitigation is planned
Phase 4: Data Collection (Duration: Variable, 1-4 weeks)
Objective: Gather high-quality data according to research design
Activities:
-
Primary Data Collection
- Execute surveys, interviews, or observations
- Collect experimental or behavioral data
- Conduct focus groups or workshops
- Gather expert opinions and insights
-
Secondary Data Collection
- Research industry reports and studies
- Collect competitive intelligence
- Gather regulatory and compliance information
- Access internal company data and metrics
-
Data Quality Assurance
- Validate data accuracy and completeness
- Check for bias and representativeness
- Ensure data consistency across sources
- Document data limitations and caveats
Deliverables:
- Primary data collection results
- Secondary data compilation
- Data quality assessment
- Collection methodology documentation
Quality Gates:
- Data collection follows planned methodology
- Data quality meets established criteria
- Sample sizes are adequate for analysis
- Data limitations are documented
Phase 5: Analysis Execution (Duration: 1-2 weeks)
Objective: Analyze collected data to generate insights
Activities:
-
Quantitative Analysis
- Perform statistical analysis and modeling
- Conduct trend and pattern analysis
- Execute comparative and benchmarking analysis
- Validate statistical significance and confidence
-
Qualitative Analysis
- Conduct thematic analysis of qualitative data
- Perform content analysis and coding
- Identify patterns and insights in narrative data
- Synthesize qualitative findings
-
Integrated Analysis
- Combine quantitative and qualitative findings
- Triangulate findings across data sources
- Identify convergent and divergent insights
- Develop comprehensive understanding
Deliverables:
- Quantitative analysis results
- Qualitative analysis findings
- Integrated analysis synthesis
- Statistical and analytical documentation
Quality Gates:
- Analysis follows established methodology
- Statistical analysis is mathematically correct
- Qualitative analysis is systematic and rigorous
- Findings are supported by evidence
Phase 6: Validation & Verification (Duration: 3-5 days)
Objective: Validate findings and ensure accuracy
Activities:
-
Internal Validation
- Cross-check analysis calculations and methods
- Validate findings against original data
- Conduct peer review of analysis approach
- Test alternative analytical approaches
-
External Validation
- Seek expert validation of findings
- Compare findings with industry benchmarks
- Validate with additional data sources
- Test findings with stakeholder feedback
-
Bias and Error Checking
- Check for analytical bias and errors
- Validate sampling and selection methods
- Assess potential confounding factors
- Document limitations and confidence levels
Deliverables:
- Validation results and documentation
- Peer review feedback and responses
- Bias assessment and mitigation
- Confidence level documentation
Quality Gates:
- Findings are validated through multiple methods
- Peer review confirms analytical rigor
- Bias and limitations are documented
- Confidence levels are appropriate
Phase 7: Insight Synthesis (Duration: 3-5 days)
Objective: Transform findings into actionable insights
Activities:
-
Pattern Recognition
- Identify key patterns and trends
- Understand relationships and correlations
- Recognize unexpected or surprising findings
- Extract underlying principles and drivers
-
Insight Development
- Transform findings into business insights
- Connect insights to business objectives
- Assess implications and consequences
- Develop actionable recommendations
-
Prioritization and Impact Assessment
- Prioritize insights by business impact
- Assess implementation feasibility
- Estimate potential value and ROI
- Identify quick wins and strategic initiatives
Deliverables:
- Key insights summary
- Business implications assessment
- Prioritized recommendations
- Impact and feasibility analysis
Quality Gates:
- Insights are clearly articulated and actionable
- Business implications are well-understood
- Recommendations are prioritized and feasible
- Value proposition is compelling
Phase 8: Findings Documentation (Duration: 3-5 days)
Objective: Document research findings for stakeholder communication
Activities:
-
Report Development
- Create comprehensive research report
- Develop executive summary and key findings
- Document methodology and limitations
- Include supporting data and appendices
-
Presentation Preparation
- Create stakeholder presentation materials
- Develop visual aids and data visualizations
- Prepare talking points and Q&A responses
- Plan presentation delivery approach
-
Handoff Documentation
- Prepare transition materials for next phase
- Document follow-up research needs
- Create implementation planning materials
- Develop stakeholder communication plan
Deliverables:
- Comprehensive research report
- Executive summary and presentation
- Handoff documentation package
- Communication and implementation plan
Quality Gates:
- Documentation is comprehensive and clear
- Findings are accurately represented
- Recommendations are actionable
- Handoff materials are complete
2.3 Research Mode Integration Points
Upstream Integrations
From Brainstorming Mode:
- Research questions and hypotheses
- Prioritized investigation areas
- Stakeholder requirements and constraints
- Success criteria and timeline expectations
From Stakeholders:
- Business intelligence requirements
- Decision-making timelines and criteria
- Resource availability and constraints
- Competitive intelligence needs
Downstream Handoffs
To Briefing Mode:
- Research findings and insights
- Validated recommendations
- Implementation considerations
- Stakeholder communication requirements
To Other Personas:
- Product Manager: Market research and competitive analysis
- System Architect: Technical feasibility research and requirements
- Product Owner: User research and requirement validation
- UX/UI Architect: User experience research and design insights
3. Briefing Mode Workflow
3.1 Project Documentation Workflow
graph TD
A["Documentation Request"] --> B["Requirements Gathering"]
B --> C["Content Planning"]
C --> D["Stakeholder Alignment"]
D --> E["Document Development"]
E --> F["Review & Validation"]
F --> G["Stakeholder Approval"]
G --> H["Final Documentation"]
H --> I["Handoff Execution"]
I --> J["Follow-up Planning"]
3.2 Detailed Briefing Workflow
Phase 1: Requirements Gathering (Duration: 60-90 minutes)
Objective: Understand documentation requirements and stakeholder needs
Activities:
-
Stakeholder Needs Assessment
- Identify primary and secondary stakeholders
- Understand decision-making requirements
- Assess information needs and preferences
- Determine success criteria for documentation
-
Content Requirements Definition
- Define required document sections and content
- Identify supporting materials and appendices
- Determine level of detail and technical depth
- Plan visual aids and data presentations
-
Format and Delivery Planning
- Select appropriate document templates
- Plan presentation and communication formats
- Determine review and approval processes
- Schedule delivery timeline and milestones
Deliverables:
- Stakeholder requirements matrix
- Content outline and specifications
- Format and delivery plan
- Review and approval timeline
Quality Gates:
- Stakeholder needs are clearly understood
- Content requirements are specific and complete
- Format and delivery approach is agreed upon
- Timeline is realistic and achievable
Phase 2: Content Planning (Duration: 45-60 minutes)
Objective: Plan document structure and content organization
Activities:
-
Information Architecture
- Organize content into logical sections
- Plan information hierarchy and flow
- Design navigation and cross-references
- Plan executive summary and key messages
-
Content Sourcing
- Identify sources for each content section
- Plan data collection and validation
- Organize existing research and analysis
- Plan new content development needs
-
Quality Planning
- Define quality standards and criteria
- Plan review and validation processes
- Identify subject matter experts for review
- Plan fact-checking and accuracy validation
Deliverables:
- Document structure and outline
- Content sourcing plan
- Quality assurance plan
- Review process design
Quality Gates:
- Document structure is logical and comprehensive
- Content sources are identified and accessible
- Quality standards are defined and achievable
- Review process is planned and agreed upon
Phase 3: Stakeholder Alignment (Duration: 30-45 minutes)
Objective: Ensure stakeholder alignment on approach and expectations
Activities:
-
Expectation Alignment
- Review document outline with stakeholders
- Confirm content scope and depth
- Align on timeline and delivery milestones
- Address concerns and questions
-
Review Process Confirmation
- Confirm review participants and roles
- Establish review criteria and standards
- Plan feedback collection and incorporation
- Set approval authority and process
-
Communication Planning
- Plan stakeholder communication during development
- Establish progress reporting approach
- Plan issue escalation and resolution
- Confirm final presentation and handoff approach
Deliverables:
- Stakeholder alignment confirmation
- Review process agreement
- Communication plan
- Issue escalation procedures
Quality Gates:
- Stakeholder expectations are aligned
- Review process is agreed upon by all parties
- Communication plan is clear and accepted
- Success criteria are confirmed
Phase 4: Document Development (Duration: 1-2 weeks)
Objective: Create comprehensive project documentation
Activities:
-
Content Creation
- Develop each document section systematically
- Integrate research findings and analysis
- Create supporting visual aids and charts
- Ensure consistency in style and messaging
-
Quality Assurance
- Conduct ongoing quality checks during development
- Validate facts and figures against sources
- Ensure compliance with standards and templates
- Check for completeness and accuracy
-
Integration and Synthesis
- Integrate content across all sections
- Ensure logical flow and coherence
- Develop executive summary and key messages
- Create comprehensive appendices and references
Deliverables:
- Complete document draft
- Supporting materials and appendices
- Quality assurance documentation
- Integration and synthesis notes
Quality Gates:
- All required content sections are complete
- Quality standards are met throughout
- Document is coherent and well-integrated
- Supporting materials are comprehensive
Phase 5: Review & Validation (Duration: 3-5 days)
Objective: Validate document quality and accuracy through systematic review
Activities:
-
Internal Review
- Conduct comprehensive self-review
- Perform peer review with team members
- Validate against quality standards
- Check for completeness and accuracy
-
Expert Review
- Engage subject matter experts for validation
- Validate technical accuracy and feasibility
- Confirm industry best practices alignment
- Assess recommendation viability
-
Stakeholder Review
- Distribute document for stakeholder review
- Collect and consolidate feedback
- Facilitate review meetings and discussions
- Plan revision approach based on feedback
Deliverables:
- Internal review results and feedback
- Expert validation and recommendations
- Stakeholder feedback compilation
- Revision plan and priorities
Quality Gates:
- Internal review confirms quality standards
- Expert validation confirms accuracy
- Stakeholder feedback is comprehensive
- Revision plan addresses all concerns
Phase 6: Stakeholder Approval (Duration: 2-3 days)
Objective: Secure formal stakeholder approval for final documentation
Activities:
-
Revision Implementation
- Implement approved revisions and changes
- Validate revision quality and accuracy
- Update supporting materials as needed
- Confirm all feedback has been addressed
-
Final Review
- Conduct final quality check
- Validate all revisions are complete
- Confirm document meets all requirements
- Prepare for approval presentation
-
Approval Process
- Present final document to approval authorities
- Address any final questions or concerns
- Secure formal approval and sign-off
- Document approval decisions and rationale
Deliverables:
- Revised final document
- Final quality validation
- Approval presentation materials
- Formal approval documentation
Quality Gates:
- All revisions are implemented and validated
- Final document meets all requirements
- Approval authorities are satisfied
- Formal approval is documented
Phase 7: Final Documentation (Duration: 1-2 days)
Objective: Finalize documentation for distribution and implementation
Activities:
-
Document Finalization
- Apply final formatting and branding
- Create distribution-ready versions
- Prepare executive summary and abstracts
- Finalize appendices and supporting materials
-
Distribution Preparation
- Prepare documents for various distribution channels
- Create presentation materials for different audiences
- Plan communication and rollout approach
- Prepare handoff materials for implementation teams
-
Archive and Documentation
- Archive working documents and source materials
- Document lessons learned and process improvements
- Create reference materials for future projects
- Update templates and standards based on experience
Deliverables:
- Final approved documentation
- Distribution-ready materials
- Presentation and communication materials
- Archive and reference documentation
Quality Gates:
- Final documents are professionally formatted
- Distribution materials are complete and accurate
- Archive documentation is comprehensive
- Lessons learned are captured
Phase 8: Handoff Execution (Duration: 1-2 days)
Objective: Execute formal handoff to implementation teams
Activities:
-
Handoff Meetings
- Conduct handoff meetings with receiving teams
- Present key findings and recommendations
- Transfer knowledge and context
- Address questions and clarifications
-
Implementation Support
- Provide implementation guidance and support
- Clarify requirements and specifications
- Support initial implementation planning
- Establish ongoing support protocols
-
Transition Documentation
- Document handoff decisions and agreements
- Create implementation tracking mechanisms
- Establish success metrics and monitoring
- Plan follow-up and support activities
Deliverables:
- Handoff meeting documentation
- Implementation support materials
- Transition agreements and protocols
- Success metrics and monitoring plan
Quality Gates:
- Handoff meetings are successful and complete
- Receiving teams understand requirements
- Implementation support is established
- Success metrics are agreed upon
Phase 9: Follow-up Planning (Duration: 30-45 minutes)
Objective: Plan ongoing support and success monitoring
Activities:
-
Success Monitoring Planning
- Define success metrics and measurement approach
- Plan monitoring schedule and reporting
- Establish review and adjustment processes
- Plan stakeholder communication of progress
-
Ongoing Support Planning
- Define ongoing support requirements
- Plan resource allocation for support activities
- Establish escalation and issue resolution processes
- Plan knowledge transfer and training needs
-
Continuous Improvement Planning
- Plan lessons learned capture and application
- Identify process improvement opportunities
- Plan template and standard updates
- Schedule retrospective and improvement activities
Deliverables:
- Success monitoring plan
- Ongoing support plan
- Continuous improvement plan
- Retrospective schedule
Quality Gates:
- Success monitoring approach is comprehensive
- Ongoing support is planned and resourced
- Improvement opportunities are identified
- Follow-up activities are scheduled
3.3 Briefing Mode Integration Points
Upstream Integrations
From Research Mode:
- Research findings and insights
- Validated data and analysis
- Recommendations and implications
- Supporting evidence and documentation
From Brainstorming Mode:
- Developed concepts and ideas
- Stakeholder requirements and preferences
- Implementation considerations
- Success criteria and metrics
Downstream Handoffs
To Implementation Teams:
- Product Manager: Strategic direction and market requirements
- System Architect: Technical requirements and architecture specifications
- Product Owner: Detailed user stories and acceptance criteria
- Development Teams: Implementation specifications and success criteria
To Stakeholders:
- Executive summaries and strategic recommendations
- Implementation roadmaps and resource requirements
- Success metrics and monitoring plans
- Communication and change management plans
Cross-Mode Integration Workflows
Mode Transition Decision Framework
graph TD
A["Current Mode Complete"] --> B{"Stakeholder Needs Assessment"}
B --> C{"Additional Analysis Needed?"}
C -->|Yes| D{"Type of Analysis Required?"}
C -->|No| E["Project Complete"]
D -->|Creative/Ideation| F["Transition to Brainstorming"]
D -->|Research/Validation| G["Transition to Research"]
D -->|Documentation| H["Transition to Briefing"]
F --> I["Execute Brainstorming Mode"]
G --> J["Execute Research Mode"]
H --> K["Execute Briefing Mode"]
I --> A
J --> A
K --> A
Integration Quality Gates
Brainstorming to Research Transition
Prerequisites:
- Clear research questions identified
- Research scope and objectives defined
- Stakeholder approval for research phase
- Resource availability confirmed
Handoff Package:
- Prioritized research questions
- Hypothesis and assumptions to test
- Success criteria and timeline
- Stakeholder requirements and constraints
Research to Briefing Transition
Prerequisites:
- Research findings validated and confirmed
- Insights and recommendations developed
- Stakeholder review and feedback incorporated
- Documentation requirements defined
Handoff Package:
- Comprehensive research findings
- Validated insights and recommendations
- Supporting data and evidence
- Implementation considerations
Brainstorming to Briefing Transition
Prerequisites:
- Concepts sufficiently developed
- Stakeholder alignment achieved
- Implementation approach defined
- Documentation scope agreed upon
Handoff Package:
- Developed concepts and recommendations
- Stakeholder requirements and feedback
- Implementation considerations
- Success criteria and metrics
Workflow Optimization and Continuous Improvement
Performance Metrics
Efficiency Metrics
- Time to Insight: Average time from request to actionable insights
- Mode Transition Efficiency: Time and effort required for mode transitions
- Resource Utilization: Efficiency of resource allocation across modes
- Stakeholder Satisfaction: Satisfaction with workflow execution and outcomes
Quality Metrics
- Deliverable Quality Scores: Quality assessment across all deliverables
- Stakeholder Alignment: Degree of alignment with stakeholder needs
- Implementation Success: Success rate of implemented recommendations
- Knowledge Transfer Effectiveness: Success of handoffs to other personas
Continuous Improvement Process
graph TD
A["Workflow Execution"] --> B["Performance Measurement"]
B --> C["Gap Analysis"]
C --> D["Improvement Planning"]
D --> E["Process Updates"]
E --> F["Training and Communication"]
F --> G["Implementation"]
G --> A
Improvement Activities
-
Regular Workflow Reviews
- Monthly workflow performance assessment
- Quarterly stakeholder feedback collection
- Annual comprehensive workflow audit
- Continuous monitoring of key metrics
-
Process Optimization
- Streamline handoff procedures
- Improve template and tool effectiveness
- Enhance quality assurance processes
- Optimize resource allocation and utilization
-
Capability Development
- Skill development for workflow execution
- Training on new tools and techniques
- Cross-training for mode flexibility
- Leadership development for complex projects
-
Technology Enhancement
- Workflow automation opportunities
- Tool integration and optimization
- Data and analytics platform improvements
- Collaboration technology enhancements
Workflow Mapping Version: 1.0 Last Updated: [