# Business Analyst (Analyst) - Template Guide
## Overview
This guide provides comprehensive templates for the Business Analyst persona in the BMAD Method. These templates support the three core working modes: Brainstorming, Research, and Project Briefing, ensuring consistent, high-quality deliverables across all analysis activities.
## Template Categories
### 1. Research Templates
Templates for planning, executing, and documenting research activities.
### 2. Analysis Templates
Templates for structuring analysis work and presenting findings.
### 3. Brainstorming Templates
Templates for facilitating ideation sessions and capturing insights.
### 4. Documentation Templates
Templates for creating project briefs and formal documentation.
### 5. Communication Templates
Templates for stakeholder engagement and presentation materials.
### 6. Quality Assurance Templates
Templates for ensuring analysis quality and validation.
---
## 1. Research Templates
### 1.1 Research Brief Template
**Purpose**: Structure comprehensive research planning
**Usage**: Research Mode - Initial planning phase
```markdown
# Research Brief: [Project Name]
## Executive Summary
[2-3 sentence overview of research objectives and expected outcomes]
## Research Objectives
### Primary Objective
[Main research goal - what decision will this research inform?]
### Secondary Objectives
- [Supporting research goal 1]
- [Supporting research goal 2]
- [Supporting research goal 3]
## Key Research Questions
### Critical Questions (Must Answer)
1. [Question that directly impacts primary objective]
2. [Question that directly impacts primary objective]
3. [Question that directly impacts primary objective]
### Important Questions (Should Answer)
1. [Supporting question for deeper understanding]
2. [Supporting question for validation]
3. [Supporting question for context]
### Exploratory Questions (Nice to Answer)
1. [Question for future consideration]
2. [Question for broader context]
## Research Scope
### Included
- [Specific area/topic included]
- [Specific area/topic included]
- [Specific area/topic included]
### Excluded
- [Specific area/topic excluded and why]
- [Specific area/topic excluded and why]
## Research Methodology
### Approach
[Primary research methodology - quantitative, qualitative, mixed methods]
### Methods
- **Primary Research**: [Surveys, interviews, observations, etc.]
- **Secondary Research**: [Industry reports, academic studies, competitor analysis]
- **Data Analysis**: [Statistical analysis, thematic analysis, comparative analysis]
### Information Sources
- **Internal Sources**: [Company data, stakeholder interviews, existing research]
- **External Sources**: [Industry databases, competitor websites, expert interviews]
- **Validation Sources**: [How findings will be cross-validated]
## Success Criteria
### Research Quality Indicators
- [How we'll know the research is comprehensive]
- [How we'll know the research is reliable]
- [How we'll know the research is actionable]
### Decision Support Criteria
- [How research will support the primary decision]
- [What level of confidence is required]
- [What format findings need to be in]
## Timeline & Resources
### Research Schedule
- **Week 1**: [Research planning and setup]
- **Week 2**: [Primary data collection]
- **Week 3**: [Secondary research and analysis]
- **Week 4**: [Synthesis and reporting]
### Resource Requirements
- **Personnel**: [Research team composition]
- **Tools**: [Research tools and platforms needed]
- **Budget**: [Estimated costs for external resources]
- **Access**: [Data, systems, or people access needed]
## Deliverables
### Primary Deliverables
- [Main research report with findings and recommendations]
- [Executive summary for stakeholders]
- [Data appendix with supporting evidence]
### Supporting Deliverables
- [Presentation materials for stakeholder review]
- [Raw data files and analysis workbooks]
- [Methodology documentation for future reference]
## Risk Assessment
### Research Risks
- **Risk**: [Potential research limitation]
- **Impact**: [How this could affect findings]
- **Mitigation**: [How to address or minimize]
### Timeline Risks
- **Risk**: [Potential delay factor]
- **Impact**: [Effect on project timeline]
- **Mitigation**: [Contingency plan]
## Stakeholder Engagement
### Key Stakeholders
- **Primary**: [Decision makers who will use research]
- **Secondary**: [Teams affected by research outcomes]
- **Subject Matter Experts**: [Internal/external experts to consult]
### Communication Plan
- **Kickoff**: [Initial stakeholder alignment meeting]
- **Check-ins**: [Regular progress updates]
- **Review**: [Findings validation sessions]
- **Final Presentation**: [Results communication]
---
**Template Version**: 1.0
**Last Updated**: [Date]
**Created By**: Business Analyst
```
### 1.2 Competitive Analysis Template
**Purpose**: Structure competitive intelligence gathering
**Usage**: Research Mode - Market analysis
```markdown
# Competitive Analysis: [Market/Product Category]
## Analysis Overview
### Objective
[What competitive intelligence is needed and why]
### Scope
- **Geographic**: [Markets included in analysis]
- **Time Period**: [Analysis timeframe]
- **Competitor Types**: [Direct, indirect, emerging competitors]
## Competitor Identification
### Direct Competitors
| Competitor | Market Share | Key Strengths | Key Weaknesses |
|------------|--------------|---------------|----------------|
| [Name] | [%] | [Strength 1, 2, 3] | [Weakness 1, 2, 3] |
| [Name] | [%] | [Strength 1, 2, 3] | [Weakness 1, 2, 3] |
### Indirect Competitors
| Competitor | Alternative Solution | Threat Level | Notes |
|------------|---------------------|--------------|-------|
| [Name] | [How they solve same problem] | [High/Med/Low] | [Key insights] |
### Emerging Competitors
| Competitor | Innovation/Disruption | Timeline | Potential Impact |
|------------|----------------------|----------|------------------|
| [Name] | [What makes them different] | [When threat emerges] | [Potential market impact] |
## Feature Comparison Matrix
| Feature/Capability | Our Product | Competitor A | Competitor B | Competitor C |
|-------------------|-------------|--------------|--------------|--------------|
| [Core Feature 1] | [Rating/Description] | [Rating/Description] | [Rating/Description] | [Rating/Description] |
| [Core Feature 2] | [Rating/Description] | [Rating/Description] | [Rating/Description] | [Rating/Description] |
| [Pricing] | [Our pricing] | [Their pricing] | [Their pricing] | [Their pricing] |
| [User Experience] | [Rating/Notes] | [Rating/Notes] | [Rating/Notes] | [Rating/Notes] |
## Market Positioning Analysis
### Positioning Map
[Description of how competitors position themselves - price vs. features, simplicity vs. power, etc.]
### Value Propositions
- **Our Value Prop**: [How we position ourselves]
- **Competitor A**: [Their key value proposition]
- **Competitor B**: [Their key value proposition]
- **Competitor C**: [Their key value proposition]
## Strategic Insights
### Market Gaps
- [Unmet customer need 1]
- [Unmet customer need 2]
- [Unmet customer need 3]
### Competitive Advantages
- [Our unique advantage 1]
- [Our unique advantage 2]
- [Our unique advantage 3]
### Competitive Threats
- [Threat 1 and mitigation strategy]
- [Threat 2 and mitigation strategy]
- [Threat 3 and mitigation strategy]
## Recommendations
### Strategic Recommendations
1. [Strategic recommendation based on analysis]
2. [Strategic recommendation based on analysis]
3. [Strategic recommendation based on analysis]
### Tactical Recommendations
1. [Immediate action based on competitive intelligence]
2. [Immediate action based on competitive intelligence]
3. [Immediate action based on competitive intelligence]
---
**Analysis Date**: [Date]
**Next Review**: [Date]
**Analyst**: [Name]
```
### 1.3 User Research Plan Template
**Purpose**: Structure user research studies
**Usage**: Research Mode - User insight gathering
```markdown
# User Research Plan: [Study Name]
## Research Overview
### Research Objectives
**Primary Question**: [Main question this research will answer]
**Secondary Questions**:
- [Supporting question 1]
- [Supporting question 2]
- [Supporting question 3]
### Success Criteria
- [How we'll know the research was successful]
- [What decisions this research will inform]
- [What confidence level we need in findings]
## Research Design
### Methodology
**Research Type**: [Exploratory, Descriptive, Causal]
**Approach**: [Qualitative, Quantitative, Mixed Methods]
**Methods**: [Interviews, Surveys, Observations, Usability Testing, etc.]
### Participant Criteria
**Target Participants**: [Who we need to research]
**Sample Size**: [Number of participants needed]
**Recruitment Criteria**:
- **Include**: [Characteristics participants must have]
- **Exclude**: [Characteristics that disqualify participants]
### Research Protocol
**Session Structure**:
1. **Introduction** (5 min): [Welcome and context setting]
2. **Background Questions** (10 min): [Understanding participant context]
3. **Main Research Activities** (30 min): [Core research tasks/questions]
4. **Wrap-up** (5 min): [Final questions and next steps]
**Key Questions/Tasks**:
- [Research question/task 1]
- [Research question/task 2]
- [Research question/task 3]
## Data Collection Plan
### Data Types
- **Behavioral Data**: [What actions/behaviors we'll observe]
- **Attitudinal Data**: [What opinions/feelings we'll capture]
- **Contextual Data**: [What environmental factors we'll note]
### Collection Methods
- **Recording**: [Audio, video, screen recording permissions and setup]
- **Note-taking**: [Who takes notes, what format]
- **Artifacts**: [Any materials participants will create]
## Analysis Plan
### Analysis Approach
**Method**: [Thematic analysis, statistical analysis, comparative analysis]
**Framework**: [Any specific analysis frameworks to use]
### Key Metrics/Indicators
- [Quantitative metric 1]
- [Quantitative metric 2]
- [Qualitative theme 1]
- [Qualitative theme 2]
## Timeline & Logistics
### Research Schedule
- **Planning**: [Dates for research design and setup]
- **Recruitment**: [Dates for participant recruitment]
- **Data Collection**: [Dates for research sessions]
- **Analysis**: [Dates for data analysis]
- **Reporting**: [Dates for findings documentation]
### Logistics
- **Location**: [Where research will be conducted]
- **Technology**: [Tools and platforms needed]
- **Materials**: [Any physical or digital materials needed]
- **Team Roles**: [Who does what during research]
## Ethical Considerations
### Participant Rights
- [Informed consent process]
- [Privacy and confidentiality protections]
- [Right to withdraw participation]
- [Data handling and storage procedures]
### Bias Mitigation
- [How we'll minimize researcher bias]
- [How we'll ensure representative sample]
- [How we'll validate findings]
## Deliverables
### Research Outputs
- **Research Report**: [Comprehensive findings and recommendations]
- **Executive Summary**: [Key insights for stakeholders]
- **Presentation**: [Findings presentation for team review]
- **Raw Data**: [Organized data files for future reference]
### Success Metrics
- [How we'll measure research quality]
- [How we'll measure research impact]
- [How we'll measure stakeholder satisfaction]
---
**Research Plan Version**: 1.0
**Created By**: [Analyst Name]
**Review Date**: [Date]
```
---
## 2. Analysis Templates
### 2.1 Root Cause Analysis Template
**Purpose**: Structure systematic problem analysis
**Usage**: Brainstorming Mode - Problem diagnosis
```markdown
# Root Cause Analysis: [Problem Statement]
## Problem Definition
### Problem Statement
[Clear, specific description of the problem]
### Problem Impact
- **Business Impact**: [How this affects business outcomes]
- **User Impact**: [How this affects users/customers]
- **Operational Impact**: [How this affects day-to-day operations]
### Problem Scope
- **When**: [When does this problem occur?]
- **Where**: [Where does this problem occur?]
- **Who**: [Who is affected by this problem?]
- **What**: [What specifically is happening?]
## Initial Hypothesis
### Suspected Causes
1. [Initial hypothesis about cause 1]
2. [Initial hypothesis about cause 2]
3. [Initial hypothesis about cause 3]
### Assumptions to Test
- [Assumption 1 that needs validation]
- [Assumption 2 that needs validation]
- [Assumption 3 that needs validation]
## 5 Whys Analysis
### Problem: [Restate the problem]
**Why 1**: [First why - immediate cause]
**Why 2**: [Second why - cause of the immediate cause]
**Why 3**: [Third why - deeper cause]
**Why 4**: [Fourth why - even deeper cause]
**Why 5**: [Fifth why - root cause]
### Root Cause Identified
[The fundamental cause identified through 5 Whys]
## Fishbone Analysis
### Categories of Potential Causes
**People**:
- [Potential people-related cause 1]
- [Potential people-related cause 2]
**Process**:
- [Potential process-related cause 1]
- [Potential process-related cause 2]
**Technology**:
- [Potential technology-related cause 1]
- [Potential technology-related cause 2]
**Environment**:
- [Potential environment-related cause 1]
- [Potential environment-related cause 2]
**Materials/Information**:
- [Potential materials/information-related cause 1]
- [Potential materials/information-related cause 2]
**Methods**:
- [Potential methods-related cause 1]
- [Potential methods-related cause 2]
## Evidence Collection
### Data Sources
| Potential Cause | Evidence Type | Data Source | Findings |
|----------------|---------------|-------------|----------|
| [Cause 1] | [Quantitative/Qualitative] | [Where to find evidence] | [What evidence shows] |
| [Cause 2] | [Quantitative/Qualitative] | [Where to find evidence] | [What evidence shows] |
### Validation Methods
- [How we'll test hypothesis 1]
- [How we'll test hypothesis 2]
- [How we'll test hypothesis 3]
## Root Cause Validation
### Primary Root Cause
**Cause**: [The validated root cause]
**Evidence**: [Evidence that supports this as the root cause]
**Confidence Level**: [High/Medium/Low and why]
### Contributing Factors
1. [Contributing factor 1 and its role]
2. [Contributing factor 2 and its role]
3. [Contributing factor 3 and its role]
## Solution Development
### Solution Options
| Solution | Addresses Root Cause | Implementation Effort | Expected Impact |
|----------|---------------------|----------------------|-----------------|
| [Solution 1] | [Yes/Partially/No] | [High/Medium/Low] | [Expected outcome] |
| [Solution 2] | [Yes/Partially/No] | [High/Medium/Low] | [Expected outcome] |
### Recommended Solution
**Solution**: [Recommended approach]
**Rationale**: [Why this solution is recommended]
**Implementation Plan**: [High-level implementation approach]
## Prevention Strategy
### Process Improvements
- [Process change to prevent recurrence]
- [Process change to prevent recurrence]
### Monitoring & Detection
- [How to detect this problem early in future]
- [What metrics to monitor]
- [What alerts to set up]
---
**Analysis Date**: [Date]
**Analyst**: [Name]
**Validation Status**: [Pending/In Progress/Complete]
```
### 2.2 SWOT Analysis Template
**Purpose**: Structure strategic situation analysis
**Usage**: Brainstorming Mode - Strategic assessment
```markdown
# SWOT Analysis: [Organization/Product/Initiative]
## Analysis Overview
### Objective
[What strategic decision this SWOT analysis will inform]
### Scope
[What specifically is being analyzed - company, product, market entry, etc.]
### Analysis Date
[When this analysis was conducted]
## Internal Factors
### Strengths
**What advantages do we have?**
**What do we do well?**
**What unique resources can we draw on?**
**What do others see as our strengths?**
1. **[Strength Category 1]**
- [Specific strength 1]
- [Specific strength 2]
- [Specific strength 3]
2. **[Strength Category 2]**
- [Specific strength 1]
- [Specific strength 2]
- [Specific strength 3]
3. **[Strength Category 3]**
- [Specific strength 1]
- [Specific strength 2]
- [Specific strength 3]
### Weaknesses
**What could we improve?**
**Where do we have fewer resources than others?**
**What are others likely to see as weaknesses?**
1. **[Weakness Category 1]**
- [Specific weakness 1]
- [Specific weakness 2]
- [Specific weakness 3]
2. **[Weakness Category 2]**
- [Specific weakness 1]
- [Specific weakness 2]
- [Specific weakness 3]
3. **[Weakness Category 3]**
- [Specific weakness 1]
- [Specific weakness 2]
- [Specific weakness 3]
## External Factors
### Opportunities
**What opportunities are open to us?**
**What trends could we take advantage of?**
**How can we turn our strengths into opportunities?**
1. **[Opportunity Category 1]**
- [Specific opportunity 1]
- [Specific opportunity 2]
- [Specific opportunity 3]
2. **[Opportunity Category 2]**
- [Specific opportunity 1]
- [Specific opportunity 2]
- [Specific opportunity 3]
3. **[Opportunity Category 3]**
- [Specific opportunity 1]
- [Specific opportunity 2]
- [Specific opportunity 3]
### Threats
**What threats could harm us?**
**What is our competition doing?**
**What threats do our weaknesses expose us to?**
1. **[Threat Category 1]**
- [Specific threat 1]
- [Specific threat 2]
- [Specific threat 3]
2. **[Threat Category 2]**
- [Specific threat 1]
- [Specific threat 2]
- [Specific threat 3]
3. **[Threat Category 3]**
- [Specific threat 1]
- [Specific threat 2]
- [Specific threat 3]
## Strategic Implications
### SO Strategies (Strength-Opportunity)
**How can we use our strengths to take advantage of opportunities?**
1. [Strategy leveraging strength to capture opportunity]
2. [Strategy leveraging strength to capture opportunity]
3. [Strategy leveraging strength to capture opportunity]
### WO Strategies (Weakness-Opportunity)
**How can we overcome weaknesses to take advantage of opportunities?**
1. [Strategy to address weakness while pursuing opportunity]
2. [Strategy to address weakness while pursuing opportunity]
3. [Strategy to address weakness while pursuing opportunity]
### ST Strategies (Strength-Threat)
**How can we use our strengths to avoid threats?**
1. [Strategy using strength to mitigate threat]
2. [Strategy using strength to mitigate threat]
3. [Strategy using strength to mitigate threat]
### WT Strategies (Weakness-Threat)
**How can we minimize weaknesses and avoid threats?**
1. [Defensive strategy to address weakness and threat]
2. [Defensive strategy to address weakness and threat]
3. [Defensive strategy to address weakness and threat]
## Priority Matrix
### High Impact, High Urgency
- [Critical item requiring immediate attention]
- [Critical item requiring immediate attention]
### High Impact, Low Urgency
- [Important item for strategic planning]
- [Important item for strategic planning]
### Low Impact, High Urgency
- [Quick win or tactical item]
- [Quick win or tactical item]
### Low Impact, Low Urgency
- [Item to monitor or consider later]
- [Item to monitor or consider later]
## Action Plan
### Immediate Actions (Next 30 days)
1. [Action to address highest priority item]
2. [Action to address highest priority item]
3. [Action to address highest priority item]
### Short-term Actions (Next 90 days)
1. [Action for short-term strategic positioning]
2. [Action for short-term strategic positioning]
3. [Action for short-term strategic positioning]
### Long-term Actions (Next 12 months)
1. [Action for long-term strategic advantage]
2. [Action for long-term strategic advantage]
3. [Action for long-term strategic advantage]
## Success Metrics
### Key Performance Indicators
- [Metric to track strength enhancement]
- [Metric to track weakness improvement]
- [Metric to track opportunity capture]
- [Metric to track threat mitigation]
### Review Schedule
- **Next Review**: [Date for next SWOT analysis]
- **Review Frequency**: [How often to update this analysis]
- **Review Triggers**: [Events that would trigger an earlier review]
---
**Analysis Team**: [Who participated in this analysis]
**Validation Date**: [When findings were validated]
**Next Update**: [When this analysis should be refreshed]
```
---
## 3. Brainstorming Templates
### 3.1 Ideation Session Template
**Purpose**: Structure creative brainstorming sessions
**Usage**: Brainstorming Mode - Idea generation
```markdown
# Ideation Session: [Session Topic]
## Session Overview
### Objective
[What we're trying to achieve through this brainstorming session]
### Challenge Statement
[Clear articulation of the problem or opportunity we're addressing]
### Success Criteria
[How we'll know the session was successful]
## Session Details
### Participants
- **Facilitator**: [Name and role]
- **Participants**:
- [Name, role, perspective they bring]
- [Name, role, perspective they bring]
- [Name, role, perspective they bring]
### Session Logistics
- **Date**: [Session date]
- **Duration**: [Session length]
- **Location**: [Physical or virtual location]
- **Materials**: [What materials/tools are needed]
## Pre-Session Preparation
### Background Information
[Key context participants should know before the session]
### Constraints & Parameters
- **Must Have**: [Non-negotiable requirements]
- **Should Have**: [Important but flexible requirements]
- **Could Have**: [Nice-to-have features]
- **Won't Have**: [Explicitly out of scope]
### Inspiration Sources
- [Relevant examples or case studies]
- [Industry best practices to consider]
- [Analogous solutions from other domains]
## Session Structure
### 1. Warm-up (10 minutes)
**Activity**: [Warm-up exercise to get creative thinking flowing]
**Purpose**: [Why this warm-up was chosen]
### 2. Problem Framing (15 minutes)
**Activity**: [How we'll ensure everyone understands the challenge]
**Key Questions**:
- [Question to clarify the problem]
- [Question to explore assumptions]
- [Question to identify constraints]
### 3. Divergent Thinking (30 minutes)
**Technique**: [Brainstorming method - classic brainstorming, brainwriting, SCAMPER, etc.]
**Rules**:
- Defer judgment
- Strive for quantity
- Build on ideas of others
- Stay focused on topic
- Encourage wild ideas
**Prompts**:
- "What if we..."
- "How might we..."
- "What would happen if..."
### 4. Idea Clustering (15 minutes)
**Activity**: [How we'll organize and group related ideas]
**Categories**: [Themes or categories for organizing ideas]
### 5. Convergent Thinking (20 minutes)
**Activity**: [How we'll evaluate and prioritize ideas]
**Criteria**:
- Feasibility (Can we do it?)
- Viability (Should we do it?)
- Desirability (Do users want it?)
### 6. Next Steps (10 minutes)
**Activity**: [How we'll plan follow-up actions]
## Ideation Techniques
### Primary Technique: [Chosen Method]
**Description**: [How this technique works]
**Why Chosen**: [Why this technique is appropriate for this challenge]
**Instructions**: [Step-by-step guide for participants]
### Backup Techniques
1. **[Alternative Technique 1]**: [When to use this instead]
2. **[Alternative Technique 2]**: [When to use this instead]
## Idea Capture Template
### Idea: [Idea Name/Title]
**Description**: [Brief description of the idea]
**How it Works**: [Explanation of how this idea would function]
**Benefits**: [What advantages this idea provides]
**Challenges**: [What obstacles might exist]
**Next Steps**: [What would need to happen to explore this further]
## Evaluation Criteria
### Feasibility Assessment
- **Technical Feasibility**: [Can we build/implement this?]
- **Resource Feasibility**: [Do we have the resources?]
- **Timeline Feasibility**: [Can we do this in the required timeframe?]
### Impact Assessment
- **User Impact**: [How much would this help users?]
- **Business Impact**: [How much would this help the business?]
- **Strategic Alignment**: [How well does this fit our strategy?]
### Risk Assessment
- **Implementation Risk**: [What could go wrong during implementation?]
- **Market Risk**: [What market factors could affect success?]
- **Competitive Risk**: [How might competitors respond?]
## Session Outcomes
### Ideas Generated
[Total number of ideas generated]
### Top Ideas (Post-Evaluation)
1. **[Idea Name]**
- **Score**: [Evaluation score]
- **Rationale**: [Why this idea scored highly]
- **Next Steps**: [Immediate actions for this idea]
2. **[Idea Name]**
- **Score**: [Evaluation score]
- **Rationale**: [Why this idea scored highly]
- **Next Steps**: [Immediate actions for this idea]
3. **[Idea Name]**
- **Score**: [Evaluation score]
- **Rationale**: [Why this idea scored highly]
- **Next Steps**: [Immediate actions for this idea]
### Insights & Themes
- [Key insight or pattern that emerged]
- [Key insight or pattern that emerged]
- [Key insight or pattern that emerged]
## Follow-up Actions
### Immediate Actions (Next 7 days)
1. [Action item with owner and deadline]
2. [Action item with owner and deadline]
3. [Action item with owner and deadline]
### Short-term Actions (Next 30 days)
1. [Action item with owner and deadline]
2. [Action item with owner and deadline]
3. [Action item with owner and deadline]
### Research & Validation Needed
- [What needs to be researched or validated]
- [What needs to be researched or validated]
- [What needs to be researched or validated]
---
**Session Facilitator**: [Name]
**Session Date**: [Date]
**Follow-up Review**: [Date for reviewing progress]
```
### 3.2 SCAMPER Analysis Template
**Purpose**: Structure systematic creative thinking
**Usage**: Brainstorming Mode - Idea development
```markdown
# SCAMPER Analysis: [Product/Service/Process]
## Analysis Overview
### Subject
[What we're applying SCAMPER analysis to]
### Objective
[What we hope to achieve through this creative analysis]
### Current State
[Brief description of the current product/service/process]
## SCAMPER Framework
### S - Substitute
**Question**: What can be substituted or swapped?
**Elements to Consider**:
- Materials or components
- People or roles
- Processes or methods
- Places or locations
- Time or sequence
**Ideas Generated**:
1. [Substitution idea 1]
- **What to substitute**: [Current element]
- **Substitute with**: [New element]
- **Potential benefit**: [Expected improvement]
2. [Substitution idea 2]
- **What to substitute**: [Current element]
- **Substitute with**: [New element]
- **Potential benefit**: [Expected improvement]
### C - Combine
**Question**: What can be combined or merged?
**Elements to Consider**:
- Features or functions
- Products or services
- Processes or steps
- Teams or departments
- Technologies or tools
**Ideas Generated**:
1. [Combination idea 1]
- **What to combine**: [Elements to merge]
- **How to combine**: [Method of combination]
- **Potential benefit**: [Expected improvement]
2. [Combination idea 2]
- **What to combine**: [Elements to merge]
- **How to combine**: [Method of combination]
- **Potential benefit**: [Expected improvement]
### A - Adapt
**Question**: What can be adapted from elsewhere?
**Elements to Consider**:
- Solutions from other industries
- Processes from other departments
- Technologies from other applications
- Strategies from competitors
- Methods from other contexts
**Ideas Generated**:
1. [Adaptation idea 1]
- **Source of adaptation**: [Where this idea comes from]
- **How to adapt**: [How to modify for our context]
- **Potential benefit**: [Expected improvement]
2. [Adaptation idea 2]
- **Source of adaptation**: [Where this idea comes from]
- **How to adapt**: [How to modify for our context]
- **Potential benefit**: [Expected improvement]
### M - Modify/Magnify
**Question**: What can be modified, magnified, or emphasized?
**Elements to Consider**:
- Size or scale
- Frequency or speed
- Strength or intensity
- Height or length
- Quantity or volume
**Ideas Generated**:
1. [Modification idea 1]
- **What to modify**: [Element to change]
- **How to modify**: [Type of modification]
- **Potential benefit**: [Expected improvement]
2. [Modification idea 2]
- **What to modify**: [Element to change]
- **How to modify**: [Type of modification]
- **Potential benefit**: [Expected improvement]
### P - Put to Other Uses
**Question**: What else can this be used for?
**Elements to Consider**:
- New markets or audiences
- Different applications
- Alternative purposes
- Secondary uses
- Unexpected contexts
**Ideas Generated**:
1. [Alternative use idea 1]
- **New use**: [Different application]
- **Target audience**: [Who would benefit]
- **Potential benefit**: [Expected value]
2. [Alternative use idea 2]
- **New use**: [Different application]
- **Target audience**: [Who would benefit]
- **Potential benefit**: [Expected value]
### E - Eliminate
**Question**: What can be eliminated or reduced?
**Elements to Consider**:
- Unnecessary features
- Redundant processes
- Excessive complexity
- Wasteful steps
- Outdated components
**Ideas Generated**:
1. [Elimination idea 1]
- **What to eliminate**: [Element to remove]
- **Why eliminate**: [Reason for removal]
- **Potential benefit**: [Expected improvement]
2. [Elimination idea 2]
- **What to eliminate**: [Element to remove]
- **Why eliminate**: [Reason for removal]
- **Potential benefit**: [Expected improvement]
### R - Reverse/Rearrange
**Question**: What can be reversed or rearranged?
**Elements to Consider**:
- Order or sequence
- Roles or responsibilities
- Cause and effect
- Positive and negative
- Inside and outside
**Ideas Generated**:
1. [Reversal/rearrangement idea 1]
- **What to reverse/rearrange**: [Element to change]
- **How to reverse/rearrange**: [Method of change]
- **Potential benefit**: [Expected improvement]
2. [Reversal/rearrangement idea 2]
- **What to reverse/rearrange**: [Element to change]
- **How to reverse/rearrange**: [Method of change]
- **Potential benefit**: [Expected improvement]
## Idea Evaluation
### Top Ideas Summary
| Idea | SCAMPER Category | Feasibility | Impact | Priority |
|------|------------------|-------------|--------|----------|
| [Idea 1] | [S/C/A/M/P/E/R] | [High/Med/Low] | [High/Med/Low] | [High/Med/Low] |
| [Idea 2] | [S/C/A/M/P/E/R] | [High/Med/Low] | [High/Med/Low] | [High/Med/Low] |
| [Idea 3] | [S/C/A/M/P/E/R] | [High/Med/Low] | [High/Med/Low] | [High/Med/Low] |
### Detailed Evaluation
#### Idea 1: [Idea Name]
**Description**: [Detailed description of the idea]
**SCAMPER Origin**: [Which SCAMPER prompt generated this]
**Feasibility Analysis**:
- **Technical**: [Can we implement this technically?]
- **Resource**: [Do we have the resources?]
- **Timeline**: [How long would this take?]
**Impact Analysis**:
- **User Benefit**: [How does this help users?]
- **Business Value**: [How does this help the business?]
- **Competitive Advantage**: [Does this differentiate us?]
**Implementation Considerations**:
- **Requirements**: [What would we need to implement this?]
- **Risks**: [What could go wrong?]
- **Dependencies**: [What else needs to happen first?]
## Next Steps
### Immediate Actions
1. [Action to further develop top idea]
2. [Action to validate assumptions]
3. [Action to assess feasibility]
### Research Needed
- [What needs to be researched before proceeding]
- [What validation is required]
- [What expert input is needed]
### Decision Points
- [Key decisions that need to be made]
- [Who needs to be involved in decisions]
- [Timeline for decision making]
---
**Analysis Date**: [Date]
**Analyst**: [Name]
**Review Date**: [When to review progress]
```
---
## 4. Documentation Templates
### 4.1 Project Brief Template
**Purpose**: Create comprehensive project documentation
**Usage**: Briefing Mode - Project initiation
```markdown
# Project Brief: [Project Name]
## Executive Summary
[2-3 paragraph overview covering the problem, solution approach, expected outcomes, and resource requirements]
## Project Overview
### Problem Statement
**Current Situation**: [What is happening now that needs to change?]
**Pain Points**: [What specific problems are we solving?]
**Impact of Inaction**: [What happens if we don't address this?]
### Project Objectives
**Primary Objective**: [Main goal this project will achieve]
**Secondary Objectives**:
- [Supporting objective 1]
- [Supporting objective 2]
- [Supporting objective 3]
**Success Criteria**: [How we'll know the project was successful]
### Solution Approach
**Proposed Solution**: [High-level description of what we plan to build/implement]
**Key Features**: [Main capabilities or components]
**Approach Rationale**: [Why this approach was chosen]
## Business Case
### Business Value
**Quantifiable Benefits**:
- [Measurable benefit 1 with estimated value]
- [Measurable benefit 2 with estimated value]
- [Measurable benefit 3 with estimated value]
**Qualitative Benefits**:
- [Intangible benefit 1]
- [Intangible benefit 2]
- [Intangible benefit 3]
### Cost-Benefit Analysis
**Investment Required**: [Total project cost estimate]
**Expected ROI**: [Return on investment calculation]
**Payback Period**: [How long to recoup investment]
### Risk Assessment
**High-Risk Items**:
- **Risk**: [Description of risk]
- **Probability**: [High/Medium/Low]
- **Impact**: [High/Medium/Low]
- **Mitigation**: [How to address this risk]
**Medium-Risk Items**:
- **Risk**: [Description of risk]
- **Probability**: [High/Medium/Low]
- **Impact**: [High/Medium/Low]
- **Mitigation**: [How to address this risk]
## Project Scope
### In Scope
**Functional Requirements**:
- [What the system/solution will do]
- [What the system/solution will do]
- [What the system/solution will do]
**Non-Functional Requirements**:
- [Performance requirements]
- [Security requirements]
- [Usability requirements]
**Deliverables**:
- [Deliverable 1 with description]
- [Deliverable 2 with description]
- [Deliverable 3 with description]
### Out of Scope
**Explicitly Excluded**:
- [What we will NOT include and why]
- [What we will NOT include and why]
- [What we will NOT include and why]
**Future Considerations**:
- [Items for potential future phases]
- [Items for potential future phases]
## Stakeholder Analysis
### Primary Stakeholders
| Stakeholder | Role | Interest | Influence | Engagement Strategy |
|-------------|------|----------|-----------|-------------------|
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
### Secondary Stakeholders
| Stakeholder | Role | Interest | Influence | Engagement Strategy |
|-------------|------|----------|-----------|-------------------|
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
## User Analysis
### Primary Users
**User Group 1**: [User type]
- **Characteristics**: [Who they are]
- **Needs**: [What they need from this solution]
- **Pain Points**: [Current frustrations]
- **Success Criteria**: [How they'll measure success]
**User Group 2**: [User type]
- **Characteristics**: [Who they are]
- **Needs**: [What they need from this solution]
- **Pain Points**: [Current frustrations]
- **Success Criteria**: [How they'll measure success]
### User Journey Considerations
**Current State**: [How users currently accomplish their goals]
**Future State**: [How users will accomplish goals with new solution]
**Key Improvements**: [What will be better in the future state]
## Technical Considerations
### Technical Requirements
**Platform Requirements**: [What platforms/systems this needs to work with]
**Integration Requirements**: [What systems this needs to integrate with]
**Performance Requirements**: [Speed, capacity, availability requirements]
**Security Requirements**: [Security and compliance needs]
### Technical Constraints
**Technology Constraints**: [Limitations on technology choices]
**Resource Constraints**: [Limitations on technical resources]
**Timeline Constraints**: [Technical limitations due to timeline]
### Architecture Considerations
**High-Level Architecture**: [Basic architectural approach]
**Key Technical Decisions**: [Important technical choices to be made]
**Technical Risks**: [Technology-related risks and mitigation strategies]
## Project Timeline
### High-Level Phases
**Phase 1: [Phase Name]** ([Duration])
- [Key activities and deliverables]
- [Key milestones]
**Phase 2: [Phase Name]** ([Duration])
- [Key activities and deliverables]
- [Key milestones]
**Phase 3: [Phase Name]** ([Duration])
- [Key activities and deliverables]
- [Key milestones]
### Critical Milestones
| Milestone | Date | Description | Dependencies |
|-----------|------|-------------|--------------|
| [Milestone 1] | [Date] | [What will be completed] | [What needs to happen first] |
| [Milestone 2] | [Date] | [What will be completed] | [What needs to happen first] |
### Dependencies
**Internal Dependencies**:
- [Dependency on other internal projects/teams]
- [Dependency on other internal projects/teams]
**External Dependencies**:
- [Dependency on external vendors/partners]
- [Dependency on external vendors/partners]
## Resource Requirements
### Team Structure
**Project Manager**: [Name or TBD]
**Technical Lead**: [Name or TBD]
**Development Team**: [Size and skills needed]
**Design Team**: [Size and skills needed]
**Other Roles**: [Any other specialized roles needed]
### Budget Requirements
**Personnel Costs**: [Estimated cost for team]
**Technology Costs**: [Software, hardware, cloud costs]
**External Costs**: [Vendors, consultants, other external costs]
**Total Budget**: [Total estimated project cost]
### Infrastructure Requirements
**Development Environment**: [What's needed for development]
**Testing Environment**: [What's needed for testing]
**Production Environment**: [What's needed for deployment]
## Success Metrics
### Key Performance Indicators
**Business Metrics**:
- [Business KPI 1]: [Current baseline] → [Target]
- [Business KPI 2]: [Current baseline] → [Target]
- [Business KPI 3]: [Current baseline] → [Target]
**User Metrics**:
- [User KPI 1]: [Current baseline] → [Target]
- [User KPI 2]: [Current baseline] → [Target]
- [User KPI 3]: [Current baseline] → [Target]
**Technical Metrics**:
- [Technical KPI 1]: [Current baseline] → [Target]
- [Technical KPI 2]: [Current baseline] → [Target]
### Measurement Plan
**Data Collection**: [How metrics will be collected]
**Reporting Schedule**: [How often metrics will be reported]
**Review Process**: [How metrics will be reviewed and acted upon]
## Communication Plan
### Stakeholder Communication
**Executive Updates**: [Frequency and format for executive communication]
**Team Updates**: [Frequency and format for team communication]
**User Communication**: [How users will be kept informed]
### Reporting Structure
**Status Reports**: [What will be reported and when]
**Escalation Process**: [How issues will be escalated]
**Decision-Making Process**: [How project decisions will be made]
## Next Steps
### Immediate Actions (Next 2 weeks)
1. [Action item with owner and deadline]
2. [Action item with owner and deadline]
3. [Action item with owner and deadline]
### Project Initiation (Next 30 days)
1. [Action item with owner and deadline]
2. [Action item with owner and deadline]
3. [Action item with owner and deadline]
### Approval Requirements
**Required Approvals**: [Who needs to approve this project brief]
**Approval Timeline**: [When approvals are needed]
**Approval Criteria**: [What criteria will be used for approval]
---
**Document Version**: 1.0
**Created By**: [Business Analyst Name]
**Creation Date**: [Date]
**Last Updated**: [Date]
**Next Review**: [Date]
```
### 4.2 Requirements Specification Template
**Purpose**: Document detailed functional and non-functional requirements
**Usage**: Briefing Mode - Detailed requirements documentation
```markdown
# Requirements Specification: [Project Name]
## Document Information
**Document Version**: [Version number]
**Created By**: [Business Analyst name]
**Creation Date**: [Date]
**Last Updated**: [Date]
**Approved By**: [Approver name and date]
## Table of Contents
1. Introduction
2. Functional Requirements
3. Non-Functional Requirements
4. User Interface Requirements
5. Integration Requirements
6. Data Requirements
7. Security Requirements
8. Compliance Requirements
9. Assumptions and Dependencies
10. Acceptance Criteria
## 1. Introduction
### 1.1 Purpose
[Purpose of this requirements document]
### 1.2 Scope
[What is covered by these requirements]
### 1.3 Definitions and Acronyms
| Term | Definition |
|------|------------|
| [Term 1] | [Definition] |
| [Term 2] | [Definition] |
### 1.4 References
- [Reference document 1]
- [Reference document 2]
## 2. Functional Requirements
### 2.1 User Management
**REQ-001: User Registration**
- **Description**: [Detailed description of requirement]
- **Priority**: [High/Medium/Low]
- **Source**: [Who requested this requirement]
- **Acceptance Criteria**:
- [Specific criterion 1]
- [Specific criterion 2]
- [Specific criterion 3]
**REQ-002: User Authentication**
- **Description**: [Detailed description of requirement]
- **Priority**: [High/Medium/Low]
- **Source**: [Who requested this requirement]
- **Acceptance Criteria**:
- [Specific criterion 1]
- [Specific criterion 2]
- [Specific criterion 3]
### 2.2 Core Functionality
**REQ-003: [Core Function 1]**
- **Description**: [Detailed description of requirement]
- **Priority**: [High/Medium/Low]
- **Source**: [Who requested this requirement]
- **Business Rules**:
- [Business rule 1]
- [Business rule 2]
- **Acceptance Criteria**:
- [Specific criterion 1]
- [Specific criterion 2]
- [Specific criterion 3]
**REQ-004: [Core Function 2]**
- **Description**: [Detailed description of requirement]
- **Priority**: [High/Medium/Low]
- **Source**: [Who requested this requirement]
- **Business Rules**:
- [Business rule 1]
- [Business rule 2]
- **Acceptance Criteria**:
- [Specific criterion 1]
- [Specific criterion 2]
- [Specific criterion 3]
### 2.3 Reporting and Analytics
**REQ-005: [Reporting Requirement]**
- **Description**: [Detailed description of requirement]
- **Priority**: [High/Medium/Low]
- **Source**: [Who requested this requirement]
- **Data Sources**: [Where data comes from]
- **Acceptance Criteria**:
- [Specific criterion 1]
- [Specific criterion 2]
- [Specific criterion 3]
## 3. Non-Functional Requirements
### 3.1 Performance Requirements
**NFR-001: Response Time**
- **Requirement**: [Specific performance requirement]
- **Measurement**: [How this will be measured]
- **Acceptance Criteria**: [Specific performance targets]
**NFR-002: Throughput**
- **Requirement**: [Specific throughput requirement]
- **Measurement**: [How this will be measured]
- **Acceptance Criteria**: [Specific throughput targets]
### 3.2 Scalability Requirements
**NFR-003: User Capacity**
- **Requirement**: [Specific scalability requirement]
- **Measurement**: [How this will be measured]
- **Acceptance Criteria**: [Specific capacity targets]
### 3.3 Availability Requirements
**NFR-004: System Uptime**
- **Requirement**: [Specific availability requirement]
- **Measurement**: [How this will be measured]
- **Acceptance Criteria**: [Specific uptime targets]
### 3.4 Reliability Requirements
**NFR-005: Error Rate**
- **Requirement**: [Specific reliability requirement]
- **Measurement**: [How this will be measured]
- **Acceptance Criteria**: [Specific reliability targets]
## 4. User Interface Requirements
### 4.1 General UI Requirements
**UIR-001: Responsive Design**
- **Requirement**: [Specific UI requirement]
- **Platforms**: [Which platforms this applies to]
- **Acceptance Criteria**: [Specific UI criteria]
**UIR-002: Accessibility**
- **Requirement**: [Specific accessibility requirement]
- **Standards**: [Which accessibility standards to follow]
- **Acceptance Criteria**: [Specific accessibility criteria]
### 4.2 Specific Interface Requirements
**UIR-003: [Specific Interface]**
- **Requirement**: [Detailed interface requirement]
- **User Experience**: [Expected user experience]
- **Acceptance Criteria**: [Specific interface criteria]
## 5. Integration Requirements
### 5.1 System Integrations
**INT-001: [External System 1]**
- **Integration Type**: [API, File transfer, Database, etc.]
- **Data Exchange**: [What data is exchanged]
- **Frequency**: [How often integration occurs]
- **Error Handling**: [How errors are handled]
- **Acceptance Criteria**: [Integration success criteria]
**INT-002: [External System 2]**
- **Integration Type**: [API, File transfer, Database, etc.]
- **Data Exchange**: [What data is exchanged]
- **Frequency**: [How often integration occurs]
- **Error Handling**: [How errors are handled]
- **Acceptance Criteria**: [Integration success criteria]
### 5.2 Third-Party Services
**INT-003: [Third-Party Service]**
- **Service Provider**: [Name of service provider]
- **Service Type**: [Type of service]
- **Integration Method**: [How integration is implemented]
- **Acceptance Criteria**: [Service integration criteria]
## 6. Data Requirements
### 6.1 Data Storage Requirements
**DAT-001: Data Retention**
- **Requirement**: [Specific data retention requirement]
- **Data Types**: [What types of data this applies to]
- **Retention Period**: [How long data is retained]
- **Disposal Method**: [How data is disposed of]
**DAT-002: Data Backup**
- **Requirement**: [Specific backup requirement]
- **Backup Frequency**: [How often backups occur]
- **Recovery Time**: [How quickly data can be recovered]
- **Acceptance Criteria**: [Backup success criteria]
### 6.2 Data Quality Requirements
**DAT-003: Data Validation**
- **Requirement**: [Specific validation requirement]
- **Validation Rules**: [What validation rules apply]
- **Error Handling**: [How validation errors are handled]
- **Acceptance Criteria**: [Data quality criteria]
## 7. Security Requirements
### 7.1 Authentication and Authorization
**SEC-001: User Authentication**
- **Requirement**: [Specific authentication requirement]
- **Authentication Method**: [How users authenticate]
- **Password Policy**: [Password requirements]
- **Acceptance Criteria**: [Authentication criteria]
**SEC-002: Access Control**
- **Requirement**: [Specific authorization requirement]
- **Role-Based Access**: [How roles and permissions work]
- **Access Levels**: [Different levels of access]
- **Acceptance Criteria**: [Authorization criteria]
### 7.2 Data Protection
**SEC-003: Data Encryption**
- **Requirement**: [Specific encryption requirement]
- **Encryption Standards**: [Which encryption standards to use]
- **Key Management**: [How encryption keys are managed]
- **Acceptance Criteria**: [Encryption criteria]
**SEC-004: Data Privacy**
- **Requirement**: [Specific privacy requirement]
- **Personal Data Handling**: [How personal data is handled]
- **Consent Management**: [How user consent is managed]
- **Acceptance Criteria**: [Privacy criteria]
## 8. Compliance Requirements
### 8.1 Regulatory Compliance
**COM-001: [Regulation 1]**
- **Regulation**: [Name of regulation]
- **Requirements**: [Specific compliance requirements]
- **Implementation**: [How compliance is achieved]
- **Acceptance Criteria**: [Compliance criteria]
**COM-002: [Regulation 2]**
- **Regulation**: [Name of regulation]
- **Requirements**: [Specific compliance requirements]
- **Implementation**: [How compliance is achieved]
- **Acceptance Criteria**: [Compliance criteria]
### 8.2 Industry Standards
**COM-003: [Standard 1]**
- **Standard**: [Name of standard]
- **Requirements**: [Specific standard requirements]
- **Implementation**: [How standard is met]
- **Acceptance Criteria**: [Standard compliance criteria]
## 9. Assumptions and Dependencies
### 9.1 Assumptions
- [Assumption 1 about project context]
- [Assumption 2 about resources]
- [Assumption 3 about technology]
### 9.2 Dependencies
**Internal Dependencies**:
- [Dependency on other internal projects]
- [Dependency on internal resources]
**External Dependencies**:
- [Dependency on external vendors]
- [Dependency on external systems]
## 10. Acceptance Criteria
### 10.1 Functional Acceptance
**Criteria for functional requirements acceptance**:
- [All functional requirements are implemented as specified]
- [All business rules are correctly enforced]
- [All user workflows function as designed]
### 10.2 Non-Functional Acceptance
**Criteria for non-functional requirements acceptance**:
- [All performance targets are met]
- [All security requirements are implemented]
- [All compliance requirements are satisfied]
### 10.3 User Acceptance
**Criteria for user acceptance**:
- [Users can successfully complete all primary tasks]
- [User satisfaction meets target levels]
- [Training and documentation are adequate]
---
**Requirements Traceability**: [Reference to traceability matrix]
**Change Control**: [Process for managing requirement changes]
**Approval**: [Approval signatures and dates]
```
---
## 5. Communication Templates
### 5.1 Stakeholder Presentation Template
**Purpose**: Present analysis findings to stakeholders
**Usage**: All Modes - Results communication
```markdown
# Stakeholder Presentation: [Analysis Topic]
## Presentation Overview
### Objective
[What this presentation aims to achieve]
### Audience
[Who will be attending this presentation]
### Duration
[Expected presentation length]
### Desired Outcomes
[What decisions or actions should result from this presentation]
## Slide Structure
### Slide 1: Title Slide
**Title**: [Presentation title]
**Subtitle**: [Analysis focus or key question addressed]
**Presenter**: [Your name and role]
**Date**: [Presentation date]
**Audience**: [Stakeholder group]
### Slide 2: Agenda
**Presentation Flow**:
1. Executive Summary (5 minutes)
2. Analysis Overview (5 minutes)
3. Key Findings (15 minutes)
4. Recommendations (10 minutes)
5. Next Steps (5 minutes)
6. Q&A (10 minutes)
### Slide 3: Executive Summary
**Key Points**:
- [Most important finding or insight]
- [Primary recommendation]
- [Expected impact or outcome]
- [Required decision or action]
### Slide 4: Analysis Context
**Background**:
- [Why this analysis was conducted]
- [What questions we sought to answer]
- [What methods were used]
**Scope**:
- [What was included in the analysis]
- [What was excluded and why]
- [Time period covered]
### Slides 5-8: Key Findings
**Finding 1**: [Primary insight]
- **Evidence**: [Data or research supporting this finding]
- **Implication**: [What this means for the business/project]
- **Confidence Level**: [How certain we are about this finding]
**Finding 2**: [Secondary insight]
- **Evidence**: [Data or research supporting this finding]
- **Implication**: [What this means for the business/project]
- **Confidence Level**: [How certain we are about this finding]
**Finding 3**: [Additional insight]
- **Evidence**: [Data or research supporting this finding]
- **Implication**: [What this means for the business/project]
- **Confidence Level**: [How certain we are about this finding]
**Finding 4**: [Supporting insight]
- **Evidence**: [Data or research supporting this finding]
- **Implication**: [What this means for the business/project]
- **Confidence Level**: [How certain we are about this finding]
### Slides 9-11: Recommendations
**Recommendation 1**: [Primary recommendation]
- **Rationale**: [Why this recommendation is made]
- **Expected Impact**: [What outcomes this should produce]
- **Implementation Effort**: [High/Medium/Low effort required]
- **Timeline**: [When this should be implemented]
**Recommendation 2**: [Secondary recommendation]
- **Rationale**: [Why this recommendation is made]
- **Expected Impact**: [What outcomes this should produce]
- **Implementation Effort**: [High/Medium/Low effort required]
- **Timeline**: [When this should be implemented]
**Recommendation 3**: [Additional recommendation]
- **Rationale**: [Why this recommendation is made]
- **Expected Impact**: [What outcomes this should produce]
- **Implementation Effort**: [High/Medium/Low effort required]
- **Timeline**: [When this should be implemented]
### Slide 12: Implementation Roadmap
**Phase 1** (Immediate - Next 30 days):
- [Action item 1]
- [Action item 2]
**Phase 2** (Short-term - Next 90 days):
- [Action item 1]
- [Action item 2]
**Phase 3** (Long-term - Next 6-12 months):
- [Action item 1]
- [Action item 2]
### Slide 13: Resource Requirements
**Personnel**:
- [Team members or roles needed]
- [Estimated time commitment]
**Budget**:
- [Financial resources required]
- [Cost-benefit analysis summary]
**Technology/Tools**:
- [Systems or tools needed]
- [Infrastructure requirements]
### Slide 14: Success Metrics
**Key Performance Indicators**:
- [Metric 1]: [Current state] → [Target state]
- [Metric 2]: [Current state] → [Target state]
- [Metric 3]: [Current state] → [Target state]
**Measurement Plan**:
- [How success will be measured]
- [When measurements will be taken]
- [Who is responsible for tracking]
### Slide 15: Risks and Mitigation
**High-Priority Risks**:
- **Risk**: [Description of risk]
- **Probability**: [High/Medium/Low]
- **Impact**: [High/Medium/Low]
- **Mitigation**: [How to address this risk]
**Medium-Priority Risks**:
- **Risk**: [Description of risk]
- **Probability**: [High/Medium/Low]
- **Impact**: [High/Medium/Low]
- **Mitigation**: [How to address this risk]
### Slide 16: Next Steps
**Immediate Actions** (Next 2 weeks):
1. [Action item with owner]
2. [Action item with owner]
3. [Action item with owner]
**Decision Points**:
- [Decision needed and by when]
- [Who needs to make the decision]
- [Information needed for decision]
**Follow-up**:
- [Next meeting or checkpoint]
- [Additional analysis needed]
- [Progress reporting plan]
### Slide 17: Questions & Discussion
**Discussion Topics**:
- [Key topic for stakeholder input]
- [Area where feedback is needed]
- [Decision that requires stakeholder alignment]
**Contact Information**:
- [Your contact information for follow-up]
- [Team member contacts if relevant]
## Presentation Notes
### Key Messages to Emphasize
1. [Most important point to communicate]
2. [Second most important point]
3. [Third most important point]
### Potential Questions and Responses
**Q**: [Likely question from stakeholders]
**A**: [Prepared response]
**Q**: [Another likely question]
**A**: [Prepared response]
**Q**: [Potential challenging question]
**A**: [Thoughtful response addressing concerns]
### Backup Slides
**Additional Detail on Finding 1**:
[More detailed analysis for deeper questions]
**Methodology Details**:
[Detailed explanation of analysis methods]
**Data Sources**:
[Complete list of information sources used]
## Follow-up Actions
### Post-Presentation Tasks
1. [Send presentation materials to attendees]
2. [Document decisions made during presentation]
3. [Schedule follow-up meetings as needed]
4. [Begin implementation of approved recommendations]
### Communication Plan
- [How decisions will be communicated to broader team]
- [Timeline for implementation updates]
- [Process for ongoing stakeholder engagement]
---
**Presentation Date**: [Date]
**Presenter**: [Name]
**Review Status**: [Draft/Final/Approved]
```
### 5.2 Research Summary Template
**Purpose**: Communicate research findings concisely
**Usage**: Research Mode - Findings communication
```markdown
# Research Summary: [Research Topic]
## Research Overview
### Research Question
[Primary question this research addressed]
### Methodology
[Brief description of research approach and methods used]
### Timeline
[When research was conducted]
### Scope
[What was included/excluded in the research]
## Executive Summary
[2-3 paragraph summary of key findings, implications, and recommendations]
## Key Findings
### Finding 1: [Primary Finding]
**Summary**: [Brief description of the finding]
**Evidence**: [Key data points or research evidence]
**Confidence Level**: [High/Medium/Low and why]
**Implications**: [What this means for the business/project]
### Finding 2: [Secondary Finding]
**Summary**: [Brief description of the finding]
**Evidence**: [Key data points or research evidence]
**Confidence Level**: [High/Medium/Low and why]
**Implications**: [What this means for the business/project]
### Finding 3: [Additional Finding]
**Summary**: [Brief description of the finding]
**Evidence**: [Key data points or research evidence]
**Confidence Level**: [High/Medium/Low and why]
**Implications**: [What this means for the business/project]
## Research Insights
### Patterns and Themes
- [Key pattern or theme identified]
- [Key pattern or theme identified]
- [Key pattern or theme identified]
### Unexpected Discoveries
- [Surprising finding that wasn't anticipated]
- [Surprising finding that wasn't anticipated]
### Validation of Assumptions
**Confirmed Assumptions**:
- [Assumption that was validated by research]
- [Assumption that was validated by research]
**Challenged Assumptions**:
- [Assumption that was contradicted by research]
- [Assumption that was contradicted by research]
## Recommendations
### Immediate Actions (Next 30 days)
1. **[Recommendation 1]**
- **Rationale**: [Why this is recommended]
- **Expected Impact**: [What outcome is expected]
- **Owner**: [Who should take this action]
2. **[Recommendation 2]**
- **Rationale**: [Why this is recommended]
- **Expected Impact**: [What outcome is expected]
- **Owner**: [Who should take this action]
### Strategic Actions (Next 3-6 months)
1. **[Strategic Recommendation 1]**
- **Rationale**: [Why this is recommended]
- **Expected Impact**: [What outcome is expected]
- **Resources Needed**: [What resources are required]
2. **[Strategic Recommendation 2]**
- **Rationale**: [Why this is recommended]
- **Expected Impact**: [What outcome is expected]
- **Resources Needed**: [What resources are required]
## Research Limitations
### Scope Limitations
- [What was not covered in this research]
- [Why certain areas were excluded]
### Methodological Limitations
- [Limitations of the research methods used]
- [How these limitations might affect findings]
### Data Limitations
- [Limitations in available data]
- [How data quality might affect conclusions]
## Future Research Needs
### Priority Research Areas
1. **[Research Area 1]**
- **Why Important**: [Why this research is needed]
- **Suggested Approach**: [How this research should be conducted]
- **Timeline**: [When this research should be done]
2. **[Research Area 2]**
- **Why Important**: [Why this research is needed]
- **Suggested Approach**: [How this research should be conducted]
- **Timeline**: [When this research should be done]
### Ongoing Monitoring
- [What should be monitored on an ongoing basis]
- [How monitoring should be conducted]
- [Who should be responsible for monitoring]
## Supporting Information
### Data Sources
**Primary Sources**:
- [Source 1 with brief description]
- [Source 2 with brief description]
**Secondary Sources**:
- [Source 1 with brief description]
- [Source 2 with brief description]
### Research Team
- **Lead Researcher**: [Name and role]
- **Supporting Researchers**: [Names and roles]
- **Subject Matter Experts**: [Names and expertise areas]
### Validation Process
- [How findings were validated]
- [Who reviewed the research]
- [What validation methods were used]
## Appendices
### Appendix A: Detailed Methodology
[Detailed description of research methods, sample sizes, data collection procedures]
### Appendix B: Raw Data Summary
[Summary of key data points, statistical analyses, survey results]
### Appendix C: Interview Insights
[Key quotes and insights from interviews or focus groups]
### Appendix D: Competitive Analysis Data
[Detailed competitive analysis findings, feature comparisons, market positioning data]
---
**Research Completed**: [Date]
**Report Author**: [Business Analyst Name]
**Next Review**: [Date for follow-up or update]
```
---
## 6. Quality Assurance Templates
### 6.1 Analysis Quality Checklist
**Purpose**: Ensure analysis meets quality standards
**Usage**: All Modes - Quality validation
```markdown
# Analysis Quality Checklist: [Analysis Name]
## Pre-Analysis Quality Checks
### Objective Clarity
- [ ] Analysis objectives are clearly defined and measurable
- [ ] Success criteria are established and agreed upon
- [ ] Scope is well-defined with clear inclusions and exclusions
- [ ] Stakeholder expectations are documented and aligned
### Methodology Selection
- [ ] Analysis methodology is appropriate for the objectives
- [ ] Methods are scientifically sound and validated
- [ ] Potential biases have been identified and addressed
- [ ] Sample sizes and selection criteria are appropriate
### Resource Preparation
- [ ] Required data sources have been identified and accessed
- [ ] Analysis tools and technologies are available and functional
- [ ] Team members have appropriate skills and training
- [ ] Timeline is realistic and achievable
## During Analysis Quality Checks
### Data Quality
- [ ] Data sources are credible and current
- [ ] Data completeness meets minimum requirements
- [ ] Data accuracy has been validated
- [ ] Data consistency across sources has been verified
- [ ] Missing data has been identified and addressed
### Analysis Rigor
- [ ] Analysis follows established methodology consistently
- [ ] Multiple perspectives and sources are considered
- [ ] Assumptions are documented and tested where possible
- [ ] Alternative explanations are explored
- [ ] Findings are cross-validated using multiple methods
### Documentation Standards
- [ ] Analysis steps are clearly documented
- [ ] Data sources and methods are properly cited
- [ ] Interim findings are recorded with supporting evidence
- [ ] Decision points and rationale are documented
- [ ] Version control is maintained for all documents
## Post-Analysis Quality Checks
### Findings Validation
- [ ] Findings are supported by sufficient evidence
- [ ] Conclusions logically follow from the analysis
- [ ] Confidence levels are appropriately assigned
- [ ] Limitations and caveats are clearly stated
- [ ] Findings have been peer-reviewed
### Recommendation Quality
- [ ] Recommendations directly address the analysis objectives
- [ ] Recommendations are specific and actionable
- [ ] Implementation feasibility has been considered
- [ ] Expected impacts are realistic and measurable
- [ ] Risks and mitigation strategies are identified
### Communication Effectiveness
- [ ] Key messages are clear and compelling
- [ ] Technical content is appropriate for the audience
- [ ] Visual aids enhance understanding
- [ ] Executive summary captures essential points
- [ ] Next steps are clearly defined
## Stakeholder Validation
### Internal Review
- [ ] Analysis has been reviewed by subject matter experts
- [ ] Methodology has been validated by peers
- [ ] Findings have been discussed with analysis team
- [ ] Recommendations have been assessed for feasibility
- [ ] Documentation meets organizational standards
### Stakeholder Feedback
- [ ] Key stakeholders have reviewed findings
- [ ] Stakeholder concerns have been addressed
- [ ] Recommendations align with stakeholder needs
- [ ] Implementation approach is acceptable to stakeholders
- [ ] Success metrics are agreed upon
### Final Validation
- [ ] All quality criteria have been met
- [ ] Outstanding issues have been resolved
- [ ] Final approval has been obtained
- [ ] Handoff documentation is complete
- [ ] Follow-up plan is established
## Quality Metrics
### Analysis Quality Score
**Methodology Rigor**: [Score 1-10] - [Comments]
**Data Quality**: [Score 1-10] - [Comments]
**Finding Validity**: [Score 1-10] - [Comments]
**Recommendation Actionability**: [Score 1-10] - [Comments]
**Communication Clarity**: [Score 1-10] - [Comments]
**Overall Quality Score**: [Average score] - [Overall assessment]
### Improvement Areas
- [Area for improvement 1]
- [Area for improvement 2]
- [Area for improvement 3]
### Lessons Learned
- [Key lesson learned 1]
- [Key lesson learned 2]
- [Key lesson learned 3]
---
**Quality Review Date**: [Date]
**Reviewed By**: [Name and role]
**Quality Status**: [Pass/Conditional Pass/Fail]
**Next Review**: [Date if applicable]
```
### 6.2 Deliverable Review Template
**Purpose**: Systematic review of analysis deliverables
**Usage**: All Modes - Final quality assurance
```markdown
# Deliverable Review: [Deliverable Name]
## Review Overview
### Deliverable Information
**Deliverable Type**: [Research Report/Project Brief/Analysis Summary/etc.]
**Created By**: [Business Analyst name]
**Creation Date**: [Date]
**Review Date**: [Date]
**Reviewer**: [Reviewer name and role]
### Review Scope
**Review Objectives**: [What this review aims to achieve]
**Review Criteria**: [Standards against which deliverable is evaluated]
**Review Method**: [How the review was conducted]
## Content Review
### Structure and Organization
- [ ] Document follows appropriate template structure
- [ ] Information is logically organized and flows well
- [ ] Sections are complete and address all required elements
- [ ] Table of contents is accurate and helpful
- [ ] Executive summary effectively captures key points
**Comments**: [Specific feedback on structure and organization]
### Content Quality
- [ ] Information is accurate and up-to-date
- [ ] Analysis is thorough and comprehensive
- [ ] Findings are well-supported by evidence
- [ ] Recommendations are specific and actionable
- [ ] Conclusions logically follow from analysis
**Comments**: [Specific feedback on content quality]
### Clarity and Communication
- [ ] Writing is clear and easy to understand
- [ ] Technical terms are defined appropriately
- [ ] Audience needs are addressed effectively
- [ ] Key messages are prominent and compelling
- [ ] Visual aids enhance understanding
**Comments**: [Specific feedback on clarity and communication]
## Technical Review
### Methodology Assessment
- [ ] Analysis methodology is appropriate and sound
- [ ] Data sources are credible and sufficient
- [ ] Analysis techniques are correctly applied
- [ ] Limitations and assumptions are clearly stated
- [ ] Bias mitigation strategies are employed
**Comments**: [Specific feedback on methodology]
### Data and Evidence Review
- [ ] Data quality meets acceptable standards
- [ ] Evidence supports conclusions drawn
- [ ] Sources are properly cited and referenced
- [ ] Quantitative analysis is mathematically correct
- [ ] Qualitative analysis follows established frameworks
**Comments**: [Specific feedback on data and evidence]
### Validation and Verification
- [ ] Findings have been cross-validated where possible
- [ ] Alternative explanations have been considered
- [ ] Peer review has been conducted
- [ ] Stakeholder input has been incorporated
- [ ] Quality assurance processes have been followed
**Comments**: [Specific feedback on validation]
## Stakeholder Alignment Review
### Requirements Compliance
- [ ] Deliverable meets all stated requirements
- [ ] Scope is appropriate and complete
- [ ] Timeline commitments have been met
- [ ] Resource constraints have been respected
- [ ] Success criteria are addressed
**Comments**: [Specific feedback on requirements compliance]
### Stakeholder Needs Assessment
- [ ] Primary stakeholder needs are addressed
- [ ] Secondary stakeholder concerns are considered
- [ ] Decision-making requirements are met
- [ ] Implementation considerations are included
- [ ] Follow-up needs are identified
**Comments**: [Specific feedback on stakeholder alignment]
### Business Value Assessment
- [ ] Business objectives are clearly supported
- [ ] Value proposition is compelling
- [ ] ROI considerations are addressed
- [ ] Risk assessment is comprehensive
- [ ] Strategic alignment is demonstrated
**Comments**: [Specific feedback on business value]
## Detailed Feedback
### Strengths
1. **[Strength 1]**: [Detailed description of what was done well]
2. **[Strength 2]**: [Detailed description of what was done well]
3. **[Strength 3]**: [Detailed description of what was done well]
### Areas for Improvement
1. **[Improvement Area 1]**:
- **Issue**: [Description of the issue]
- **Impact**: [How this affects deliverable quality]
- **Recommendation**: [Specific suggestion for improvement]
- **Priority**: [High/Medium/Low]
2. **[Improvement Area 2]**:
- **Issue**: [Description of the issue]
- **Impact**: [How this affects deliverable quality]
- **Recommendation**: [Specific suggestion for improvement]
- **Priority**: [High/Medium/Low]
3. **[Improvement Area 3]**:
- **Issue**: [Description of the issue]
- **Impact**: [How this affects deliverable quality]
- **Recommendation**: [Specific suggestion for improvement]
- **Priority**: [High/Medium/Low]
### Critical Issues
**Issue 1**: [Description of critical issue requiring immediate attention]
- **Impact**: [Serious consequences if not addressed]
- **Required Action**: [What must be done to resolve]
- **Timeline**: [When this must be completed]
## Review Recommendations
### Approval Status
- [ ] **Approved**: Deliverable meets all quality standards and requirements
- [ ] **Approved with Minor Revisions**: Deliverable is acceptable with small changes
- [ ] **Conditional Approval**: Deliverable requires specific improvements before final approval
- [ ] **Requires Major Revision**: Deliverable needs significant improvements before resubmission
- [ ] **Not Approved**: Deliverable does not meet minimum standards
### Required Actions
**High Priority Actions** (Must complete before approval):
1. [Action item with specific requirements]
2. [Action item with specific requirements]
**Medium Priority Actions** (Should complete for quality improvement):
1. [Action item with specific requirements]
2. [Action item with specific requirements]
**Low Priority Actions** (Could complete for enhancement):
1. [Action item with specific requirements]
2. [Action item with specific requirements]
### Follow-up Requirements
- **Revision Timeline**: [When revisions should be completed]
- **Re-review Process**: [How revised deliverable will be reviewed]
- **Final Approval Authority**: [Who provides final approval]
- **Distribution Plan**: [How approved deliverable will be shared]
## Quality Metrics
### Quantitative Assessment
| Quality Dimension | Score (1-10) | Weight | Weighted Score |
|------------------|--------------|---------|----------------|
| Content Accuracy | [Score] | 25% | [Weighted Score] |
| Methodology Rigor | [Score] | 20% | [Weighted Score] |
| Communication Clarity | [Score] | 20% | [Weighted Score] |
| Stakeholder Alignment | [Score] | 15% | [Weighted Score] |
| Actionability | [Score] | 10% | [Weighted Score] |
| Completeness | [Score] | 10% | [Weighted Score] |
| **Total Quality Score** | | **100%** | **[Total Score]** |
### Qualitative Assessment
**Overall Quality Rating**: [Excellent/Good/Satisfactory/Needs Improvement/Poor]
**Key Quality Indicators**:
- [Most significant quality strength]
- [Most important quality concern]
- [Overall quality trajectory]
## Lessons Learned
### Process Improvements
- [Improvement to analysis process]
- [Improvement to review process]
- [Improvement to communication process]
### Template Enhancements
- [Suggested template improvement]
- [Suggested template improvement]
### Best Practices Identified
- [Best practice to replicate]
- [Best practice to replicate]
---
**Review Completed By**: [Reviewer name and signature]
**Review Date**: [Date]
**Next Review**: [Date if applicable]
**Distribution**: [Who receives this review]
```
---
## Template Selection Matrix
### Quick Reference Guide
| Analysis Type | Primary Template | Supporting Templates | Quality Templates |
|---------------|------------------|---------------------|-------------------|
| **Market Research** | Research Brief | Competitive Analysis, Research Summary | Analysis Quality Checklist |
| **User Research** | User Research Plan | Research Summary, Stakeholder Presentation | Deliverable Review |
| **Problem Analysis** | Root Cause Analysis | SWOT Analysis, Project Brief | Analysis Quality Checklist |
| **Strategic Planning** | SWOT Analysis | Research Brief, Stakeholder Presentation | Deliverable Review |
| **Project Initiation** | Project Brief | Requirements Specification, Stakeholder Presentation | Analysis Quality Checklist |
| **Ideation Sessions** | Ideation Session | SCAMPER Analysis, Research Summary | Deliverable Review |
### Template Customization Guidelines
#### When to Customize Templates
- **Industry-Specific Requirements**: Adapt templates for specific industry regulations or standards
- **Organizational Standards**: Modify templates to match company documentation standards
- **Project Complexity**: Scale templates up or down based on project size and complexity
- **Stakeholder Preferences**: Adjust format and detail level for specific stakeholder groups
#### Customization Best Practices
1. **Maintain Core Structure**: Keep essential sections while adapting details
2. **Preserve Quality Standards**: Ensure customizations don't compromise quality requirements
3. **Document Changes**: Track template modifications for consistency and improvement
4. **Validate Effectiveness**: Test customized templates and gather feedback for refinement
#### Template Maintenance
- **Regular Review**: Update templates quarterly based on usage feedback
- **Version Control**: Maintain clear versioning for all template modifications
- **Training Updates**: Ensure team training reflects current template versions
- **Quality Monitoring**: Track template effectiveness through deliverable quality metrics
---
**Template Guide Version**: 1.0
**Last Updated**: [Date]
**Next Review**: [Date]
**Maintained By**: Business Analyst Team
```