Test Design and Risk Assessment - Validation Checklist

Prerequisites (Mode-Dependent)

System-Level Mode (Phase 3):

  • PRD exists with functional and non-functional requirements
  • ADR (Architecture Decision Record) exists
  • Architecture document available (architecture.md or tech-spec)
  • Requirements are testable and unambiguous

Epic-Level Mode (Phase 4):

  • Story markdown with clear acceptance criteria exists
  • PRD or epic documentation available
  • Architecture documents available (test-design-architecture.md + test-design-qa.md from Phase 3, if exists)
  • Requirements are testable and unambiguous

Process Steps

Step 1: Context Loading

  • PRD.md read and requirements extracted
  • Epics.md or specific epic documentation loaded
  • Story markdown with acceptance criteria analyzed
  • Architecture documents reviewed (if available)
  • Existing test coverage analyzed
  • Knowledge base fragments loaded (risk-governance, probability-impact, test-levels, test-priorities)

Step 2: Risk Assessment

  • Genuine risks identified (not just features)
  • Risks classified by category (TECH/SEC/PERF/DATA/BUS/OPS)
  • Probability scored (1-3 for each risk)
  • Impact scored (1-3 for each risk)
  • Risk scores calculated (probability × impact)
  • High-priority risks (score ≥6) flagged
  • Mitigation plans defined for high-priority risks
  • Owners assigned for each mitigation
  • Timelines set for mitigations
  • Residual risk documented

Step 3: Coverage Design

  • Acceptance criteria broken into atomic scenarios
  • Test levels selected (E2E/API/Component/Unit)
  • No duplicate coverage across levels
  • Priority levels assigned (P0/P1/P2/P3)
  • P0 scenarios meet strict criteria (blocks core + high risk + no workaround)
  • Data prerequisites identified
  • Tooling requirements documented
  • Execution order defined (smoke → P0 → P1 → P2/P3)

Step 4: Deliverables Generation

  • Risk assessment matrix created
  • Coverage matrix created
  • Execution order documented
  • Resource estimates calculated
  • Quality gate criteria defined
  • Output file written to correct location
  • Output file uses template structure

Output Validation

Risk Assessment Matrix

  • All risks have unique IDs (R-001, R-002, etc.)
  • Each risk has category assigned
  • Probability values are 1, 2, or 3
  • Impact values are 1, 2, or 3
  • Scores calculated correctly (P × I)
  • High-priority risks (≥6) clearly marked
  • Mitigation strategies specific and actionable

Coverage Matrix

  • All requirements mapped to test levels
  • Priorities assigned to all scenarios
  • Risk linkage documented
  • Test counts realistic
  • Owners assigned where applicable
  • No duplicate coverage (same behavior at multiple levels)

Execution Order

  • Smoke tests defined (<5 min target)
  • P0 tests listed (<10 min target)
  • P1 tests listed (<30 min target)
  • P2/P3 tests listed (<60 min target)
  • Order optimizes for fast feedback

Resource Estimates

  • P0 hours calculated (count × 2 hours)
  • P1 hours calculated (count × 1 hour)
  • P2 hours calculated (count × 0.5 hours)
  • P3 hours calculated (count × 0.25 hours)
  • Total hours summed
  • Days estimate provided (hours / 8)
  • Estimates include setup time

Quality Gate Criteria

  • P0 pass rate threshold defined (should be 100%)
  • P1 pass rate threshold defined (typically ≥95%)
  • High-risk mitigation completion required
  • Coverage targets specified (≥80% recommended)

Quality Checks

Evidence-Based Assessment

  • Risk assessment based on documented evidence
  • No speculation on business impact
  • Assumptions clearly documented
  • Clarifications requested where needed
  • Historical data referenced where available

Risk Classification Accuracy

  • TECH risks are architecture/integration issues
  • SEC risks are security vulnerabilities
  • PERF risks are performance/scalability concerns
  • DATA risks are data integrity issues
  • BUS risks are business/revenue impacts
  • OPS risks are deployment/operational issues

Priority Assignment Accuracy

  • P0: Truly blocks core functionality
  • P0: High-risk (score ≥6)
  • P0: No workaround exists
  • P1: Important but not blocking
  • P2/P3: Nice-to-have or edge cases

Test Level Selection

  • E2E used only for critical paths
  • API tests cover complex business logic
  • Component tests for UI interactions
  • Unit tests for edge cases and algorithms
  • No redundant coverage

Integration Points

Knowledge Base Integration

  • risk-governance.md consulted
  • probability-impact.md applied
  • test-levels-framework.md referenced
  • test-priorities-matrix.md used
  • Additional fragments loaded as needed

Status File Integration

  • Test design logged in Quality & Testing Progress
  • Epic number and scope documented
  • Completion timestamp recorded

Workflow Dependencies

  • Can proceed to *atdd workflow with P0 scenarios
  • *atdd is a separate workflow and must be run explicitly (not auto-run)
  • Can proceed to automate workflow with full coverage plan
  • Risk assessment informs gate workflow criteria
  • Integrates with ci workflow execution order

System-Level Mode: Two-Document Validation

When in system-level mode (PRD + ADR input), validate BOTH documents:

test-design-architecture.md

  • Purpose statement at top (serves as contract with Architecture team)
  • Executive Summary with scope, business context, architecture decisions, risk summary
  • Quick Guide section with three tiers:
    • 🚨 BLOCKERS - Team Must Decide (Sprint 0 critical path items)
    • ⚠️ HIGH PRIORITY - Team Should Validate (recommendations for approval)
    • 📋 INFO ONLY - Solutions Provided (no decisions needed)
  • Risk Assessment section
    • Total risks identified count
    • High-priority risks table (score ≥6) with all columns: Risk ID, Category, Description, Probability, Impact, Score, Mitigation, Owner, Timeline
    • Medium and low-priority risks tables
    • Risk category legend included
  • Testability Concerns section (if system has architectural constraints)
    • Blockers to fast feedback table
    • Explanation of why standard CI/CD may not apply (if applicable)
    • Tiered testing strategy table (if forced by architecture)
    • Architectural improvements needed (or acknowledgment system supports testing well)
  • Risk Mitigation Plans for all high-priority risks (≥6)
    • Each plan has: Strategy (numbered steps), Owner, Timeline, Status, Verification
  • Assumptions and Dependencies section
    • Assumptions list (numbered)
    • Dependencies list with required dates
    • Risks to plan with impact and contingency
  • NO test implementation code (long examples belong in QA doc)
  • NO test scenario checklists (belong in QA doc)
  • Cross-references to QA doc where appropriate

test-design-qa.md

  • Purpose statement at top (execution recipe for QA team)
  • Quick Reference for QA section
    • Before You Start checklist
    • Test Execution Order
    • Need Help? guidance
  • System Architecture Summary (brief overview of services and data flow)
  • Test Environment Requirements in early section (section 1-3, NOT buried at end)
    • Table with Local/Dev/Staging environments
    • Key principles listed (shared DB, randomization, parallel-safe, self-cleaning, shift-left)
    • Code example provided
  • Testability Assessment with prerequisites checklist
    • References Architecture doc blockers (not duplication)
  • Test Levels Strategy with unit/integration/E2E split
    • System type identified
    • Recommended split percentages with rationale
    • Test count summary (P0/P1/P2/P3 totals)
  • Test Coverage Plan with P0/P1/P2/P3 sections
    • Each priority has: Execution details, Purpose, Criteria, Test Count
    • Detailed test scenarios WITH CHECKBOXES
    • Coverage table with columns: Requirement | Test Level | Risk Link | Test Count | Owner | Notes
  • Sprint 0 Setup Requirements
    • Architecture/Backend blockers listed with cross-references to Architecture doc
    • QA Test Infrastructure section (factories, fixtures)
    • Test Environments section (Local, CI/CD, Staging, Production)
    • Sprint 0 NFR Gates checklist
    • Sprint 1 Items clearly separated
  • NFR Readiness Summary (reference to Architecture doc, not duplication)
    • Table with NFR categories, status, evidence, blocker, next action
  • Cross-references to Architecture doc (not duplication)
  • NO architectural theory (just reference Architecture doc)

Cross-Document Consistency

  • Both documents reference same risks by ID (R-001, R-002, etc.)
  • Both documents use consistent priority levels (P0, P1, P2, P3)
  • Both documents reference same Sprint 0 blockers
  • No duplicate content (cross-reference instead)
  • Dates and authors match across documents
  • ADR and PRD references consistent

Completion Criteria

All must be true:

  • All prerequisites met
  • All process steps completed
  • All output validations passed
  • All quality checks passed
  • All integration points verified
  • Output file(s) complete and well-formatted
  • System-level mode: Both documents validated (if applicable)
  • Epic-level mode: Single document validated (if applicable)
  • Team review scheduled (if required)

Post-Workflow Actions

User must complete:

  1. Review risk assessment with team
  2. Prioritize mitigation for high-priority risks (score ≥6)
  3. Allocate resources per estimates
  4. Run *atdd workflow to generate P0 tests (separate workflow; not auto-run)
  5. Set up test data factories and fixtures
  6. Schedule team review of test design document

Recommended next workflows:

  1. Run atdd workflow for P0 test generation
  2. Run framework workflow if not already done
  3. Run ci workflow to configure pipeline stages

Rollback Procedure

If workflow fails:

  1. Delete output file
  2. Review error logs
  3. Fix missing context (PRD, architecture docs)
  4. Clarify ambiguous requirements
  5. Retry workflow

Notes

Common Issues

Issue: Too many P0 tests

  • Solution: Apply strict P0 criteria - must block core AND high risk AND no workaround

Issue: Risk scores all high

  • Solution: Differentiate between high-impact (3) and degraded (2) impacts

Issue: Duplicate coverage across levels

  • Solution: Use test pyramid - E2E for critical paths only

Issue: Resource estimates too high

  • Solution: Invest in fixtures/factories to reduce per-test setup time

Best Practices

  • Base risk assessment on evidence, not assumptions
  • High-priority risks (≥6) require immediate mitigation
  • P0 tests should cover <10% of total scenarios
  • Avoid testing same behavior at multiple levels
  • Include smoke tests (P0 subset) for fast feedback

Checklist Complete: Sign off when all items validated.

Completed by: {name} Date: {date} Epic: {epic title} Notes: {additional notes}