# Quality Gate Validation Task
|
|
|
|
## Purpose
|
|
Validate that all quality standards and patterns are met before proceeding to next phase. Store validation results at `.ai/quality/validations/gate-results-{date}.md`.
|
|
|
|
## Pre-Implementation Gate
|
|
- [ ] **Planning Complete**: Comprehensive plan documented
|
|
- [ ] **Context Gathered**: All necessary information collected
|
|
- [ ] **UDTM Executed**: Ultra-deep thinking mode completed
|
|
- [ ] **Assumptions Challenged**: All assumptions explicitly verified
|
|
- [ ] **Root Cause Identified**: For any existing issues
|
|
|
|
## Implementation Gate
|
|
- [ ] **Real Implementation**: No mocks, stubs, or placeholders
|
|
- [ ] **Code Quality**: 0 Ruff violations, 0 MyPy errors
|
|
- [ ] **Integration Testing**: Works with existing components
|
|
- [ ] **Error Handling**: Specific exceptions with proper context
|
|
- [ ] **Documentation**: All functions/classes properly documented
|
|
|
|
## Completion Gate
|
|
- [ ] **Functionality Verified**: Actually works as specified
|
|
- [ ] **Tests Pass**: All tests verify real functionality
|
|
- [ ] **Performance Acceptable**: Meets performance requirements
|
|
- [ ] **Security Reviewed**: No obvious vulnerabilities
|
|
- [ ] **Brotherhood Review**: Peer validation completed
|
|
|
|
## Anti-Pattern Check
|
|
Fail immediately if any of these are detected:
|
|
- Mock services in production paths
|
|
- Placeholder implementations (TODO, FIXME, pass)
|
|
- Dummy data instead of real processing
|
|
- Generic exception handling
|
|
- Assumption-based solutions without verification
|
|
|
|
## Gate Enforcement Protocol
|
|
|
|
### Gate Failure Response
|
|
1. **IMMEDIATE STOP**: Halt all work on current task
|
|
2. **ROOT CAUSE ANALYSIS**: Identify why gate failed
|
|
3. **CORRECTIVE ACTION**: Address underlying issues
|
|
4. **RE-VALIDATION**: Repeat gate check after fixes
|
|
5. **DOCUMENTATION**: Record lessons learned
|
|
|
|
### Gate Override (Emergency Only)
|
|
- Requires explicit approval from project lead
|
|
- Must document business justification
|
|
- Technical debt ticket must be created
|
|
- Timeline for proper resolution required
|
|
|
|
## Output
|
|
- **PASS**: All gates satisfied, proceed to next phase
|
|
- **CONDITIONAL**: Minor issues requiring fixes, timeline < 1 day
|
|
- **FAIL**: Major issues, return to planning phase
|
|
|
|
## Success Criteria
|
|
All quality gates pass with documented evidence and peer validation. Results documented and stored for tracking.
|
|
|
|
## Gate Metrics
|
|
Track and report:
|
|
- Gate pass/fail rates by phase
|
|
- Average time to resolve gate failures
|
|
- Most common gate failure reasons
|
|
- Quality trend over time
|
|
|
|
## Integration Points
|
|
- **Story Completion**: All gates must pass before story marked done
|
|
- **Sprint Planning**: Gate history influences complexity estimates
|
|
- **Release Planning**: Gate metrics inform release readiness
|
|
- **Retrospectives**: Gate failures analyzed for process improvement
|
|
- **Documentation**: All validation results stored at `.ai/quality/validations/gate-results-{date}.md`
|
|
- **Tracking**: Gate metrics and trends maintained at `.ai/quality/diagnostics/gate-metrics.md`
|
|
|
|
## Output Deliverables
|
|
- **Primary Report**: Gate validation results at `.ai/quality/validations/gate-results-{date}.md`
|
|
- **Metrics Update**: Gate performance metrics at `.ai/quality/diagnostics/gate-metrics.md`
|
|
- **Action Items**: Any required fixes tracked in current work items |