Implement Consolidated Fixes
Task Overview
Agent: dev
Action Type: fix-implementation
Duration: 15-45 minutes (varies by fix count)
LLM-Optimized: Systematic fix implementation with evidence tracking
Purpose
Implement consolidated fixes focusing on REQUIRED-FOR-COMPLETION and QUALITY-STANDARD items with clear documentation for validation.
Context
Systematic implementation of prioritized review feedback:
- REQUIRED-FOR-COMPLETION and QUALITY-STANDARD priority focus
- Implementation plan sequencing for efficiency
- Clear documentation for validation evidence
- Quality gate maintenance throughout process
Inputs
Required
story_file(string): Path to the story file with consolidation summaryconsolidated_feedback(object): Prioritized feedback from consolidation task
Outputs
implementation_status(string): "Complete" | "Partial" | "Blocked"story_file(string): Updated story file with implementation detailsfixes_summary(string): Summary of changes implemented
Instructions
Step 1: Pre-Implementation Analysis (3-5 minutes)
Consolidation Review:
FIX_ANALYSIS:
- REQUIRED items: [count]
- QUALITY-STANDARD items: [count]
- Implementation phases: [count]
- Estimated effort: [time]
- Dependencies identified: [list]
Technical Scope Assessment:
- Backend changes: [YES/NO] - [component list]
- Frontend changes: [YES/NO] - [component list]
- Integration points: [list]
- Quality gates impact: [NONE/MINOR/MAJOR]
- Testing approach: [unit/integration/e2e]
Step 2: Systematic Fix Implementation (10-35 minutes)
Implementation Protocol:
- Phase 1: REQUIRED-FOR-COMPLETION fixes (sequential)
- Phase 2: QUALITY-STANDARD fixes (grouped by domain)
- Continuous quality gate validation
- Evidence documentation per fix
Per-Fix Process:
[FIX_ID]: [Description] - [Domain]
Implementation: [Code changes made]
Validation: [How verified]
Quality Gates: [PASS/FAIL status]
Evidence: [Test results/screenshots]
Follow implementation plan sequence:
- Work through fixes in the order specified by consolidation
- Complete each phase before moving to next
- Test each significant change before proceeding
- Maintain project quality gates throughout
For each fix:
- Read the specific feedback requirement
- Implement the change following project coding standards
- Test the change in isolation where possible
- Document what was changed and how
-
Handle different types of fixes
Architecture fixes:
- Code structure improvements
- Security enhancements
- Performance optimizations
- Technical debt reduction
Business fixes:
- Acceptance criteria adjustments
- Business rule corrections
- User journey improvements
- Data validation enhancements
Quality fixes:
- Test coverage improvements
- Code quality enhancements
- Error handling additions
- Documentation updates
UX fixes:
- Interface adjustments
- Accessibility improvements
- User interaction enhancements
- Visual design corrections
Quality Validation
-
Ensure continuous quality
- Run project quality gates after significant changes
- Verify existing functionality still works
- Test new/modified functionality thoroughly
- Maintain test coverage standards
-
Document implementation thoroughly
Update story file with implementation details:
## Round 1 Fixes Implementation ### REQUIRED-FOR-COMPLETION Fixes Applied #### Architecture Fixes 1. **[Fix Description]** - **Issue**: [Original feedback] - **Solution**: [What was implemented] - **Files Changed**: [List of modified files] - **Testing**: [How it was validated] #### Business Fixes 1. **[Fix Description]** - **Issue**: [Original feedback] - **Solution**: [What was implemented] - **AC Impact**: [Which acceptance criteria affected] - **Testing**: [How it was validated] ### QUALITY-STANDARD Fixes Applied #### Process/Standards Fixes 1. **[Fix Description]** - **Issue**: [Original feedback] - **Standard**: [Which project standard was violated] - **Solution**: [What was implemented] - **Testing**: [How it was validated] #### Quality Fixes 1. **[Fix Description]** - **Issue**: [Original feedback] - **Standard**: [Test coverage/Code quality/Performance/etc.] - **Solution**: [What was implemented] - **Testing**: [How it was validated] #### UX Fixes 1. **[Fix Description]** - **Issue**: [Original feedback] - **Standard**: [Accessibility/Design consistency/etc.] - **Solution**: [What was implemented] - **Visual Changes**: [Description of UI changes] - **Testing**: [How it was validated - note if Playwright needed] ### Implementation Status - **REQUIRED-FOR-COMPLETION**: [X/Y completed] - **QUALITY-STANDARD**: [X/Y completed] - **Quality Gates**: [PASS/FAIL] - **Ready for Validation**: [YES/NO] ### IMPROVEMENT Items (Deferred) [List items marked as IMPROVEMENT that were not implemented]
Completion Verification
-
Final validation before handoff
- Verify all REQUIRED-FOR-COMPLETION items addressed
- Verify all QUALITY-STANDARD items addressed per project requirements
- Confirm project quality gates pass
- Test critical user journeys still work
- Ensure story acceptance criteria still met
- Document any remaining concerns or blockers
-
Prepare for architect validation
- Ensure story documentation is complete and clear
- Note any UX changes that require Playwright validation
- Document any technical decisions made during implementation
- Flag any items that couldn't be completed and why
Success Criteria
- All REQUIRED-FOR-COMPLETION and QUALITY-STANDARD fixes implemented according to plan
- Project quality gates continue to pass
- Story file updated with comprehensive implementation details
- No regressions in existing functionality
- Ready for architect validation with clear documentation
Failure Conditions
- REQUIRED-FOR-COMPLETION or QUALITY-STANDARD fixes incomplete or incorrect
- Project quality gates failing after implementation
- Insufficient documentation of changes
- Existing functionality broken by fixes
- Critical technical blockers preventing completion
Error Handling
If implementation encounters blockers:
- Document the specific blocker and attempted solutions
- Identify if blocker affects REQUIRED-FOR-COMPLETION or QUALITY-STANDARD classification
- Update story with blocker details and impact
- Recommend next steps (escalation, scope change, etc.)
- Complete remaining non-blocked fixes
If quality gates fail:
- Identify specific failures and root causes
- Fix issues systematically
- Re-run quality gates after each fix
- Document any ongoing quality issues
- Do not proceed to validation until gates pass
Notes
- Focus exclusively on REQUIRED-FOR-COMPLETION and QUALITY-STANDARD items
- IMPROVEMENT items should be documented but not implemented
- Story documentation is critical for subsequent architect validation
- UX changes requiring server interaction should be clearly marked
- Maintain project coding standards and conventions throughout
Integration Points
- Input from: consolidate-review-feedback task (architect agent)
- Output to: validate-consolidated-fixes task (architect agent)
- Dependencies: Story file with consolidation summary
- Quality Gates: Project-specific validation commands must pass