# Approve Story for Development
|
|
|
|
## Purpose
|
|
Product Owner validation and approval of story for development readiness. Validates business value, epic alignment, and acceptance criteria accuracy before development begins.
|
|
|
|
## Inputs
|
|
- `story_file`: Path to the story file requiring approval (e.g., "docs/stories/epic1.story2.story.md")
|
|
- `epic_number`: Epic number for alignment validation
|
|
|
|
## Task Execution
|
|
|
|
### 1. Load Story and Epic Context
|
|
- Read the complete story file
|
|
- Read the parent epic file (`docs/epic{epic_number}.md`) for context
|
|
- Extract story status, user story, acceptance criteria, and business context
|
|
- Understand the story's role within the epic objectives
|
|
|
|
### 2. Execute Story Approval Checklist
|
|
- Use `story-approval-checklist.md` as validation framework
|
|
- Systematically evaluate each checklist category:
|
|
- Business Value Alignment
|
|
- Acceptance Criteria Validation
|
|
- Scope and Priority Assessment
|
|
- User Experience Consideration
|
|
- Development Readiness
|
|
|
|
### 3. Business Value Assessment
|
|
- Validate user story articulates clear WHO, WHAT, WHY
|
|
- Confirm story contributes meaningfully to epic business objectives
|
|
- Assess if story addresses real user need vs technical convenience
|
|
- Evaluate business risk of implementing vs not implementing
|
|
|
|
### 4. Acceptance Criteria Validation
|
|
- Review each AC for business accuracy and completeness
|
|
- Ensure ACs reflect actual business rules and user expectations
|
|
- Verify ACs are testable from user/business perspective
|
|
- Check for clarity and measurability of success criteria
|
|
|
|
### 5. Scope and Priority Review
|
|
- Validate story scope aligns with MVP boundaries
|
|
- Confirm story can be completed in single iteration
|
|
- Assess priority appropriateness for current epic phase
|
|
- Review dependencies and prerequisites
|
|
|
|
### 6. User Experience Evaluation
|
|
- Consider story impact on overall user journey
|
|
- Evaluate usability implications of proposed functionality
|
|
- Review edge cases and error scenarios from user perspective
|
|
- Assess integration with existing user workflows
|
|
|
|
### 7. Development Readiness Check
|
|
- Confirm development team will have clear requirements
|
|
- Validate success criteria are well-defined
|
|
- Ensure PO availability for clarification during development
|
|
- Review acceptance process for completed story
|
|
|
|
### 8. Make Approval Decision
|
|
Based on checklist validation, determine:
|
|
|
|
**APPROVED**:
|
|
- All critical criteria met
|
|
- Story ready for development
|
|
- Update story status to "Approved"
|
|
- Log approval decision and timestamp
|
|
|
|
**CONDITIONAL**:
|
|
- Minor issues requiring specific changes
|
|
- Document required changes clearly
|
|
- Keep story status as "Draft"
|
|
- Provide actionable feedback for revision
|
|
|
|
**REJECTED**:
|
|
- Significant issues requiring major revision
|
|
- Keep story status as "Draft"
|
|
- Document revision requirements
|
|
- Return to epic planning if needed
|
|
|
|
### 9. Document Decision and Next Steps
|
|
- Record approval decision in story file
|
|
- Add PO approval section with:
|
|
- Decision (APPROVED/CONDITIONAL/REJECTED)
|
|
- Business confidence level (High/Medium/Low)
|
|
- Key findings or concerns
|
|
- Required changes (if conditional)
|
|
- Risk assessment
|
|
- Update story status appropriately
|
|
|
|
## Success Criteria
|
|
- Story has been thoroughly evaluated from business perspective
|
|
- Clear approval decision made with supporting rationale
|
|
- Story status updated according to decision
|
|
- Required changes documented if story needs revision
|
|
- Development team has clear guidance for proceeding
|
|
|
|
## Outputs
|
|
- `approval_decision`: "APPROVED", "CONDITIONAL", or "REJECTED"
|
|
- `story_status`: Updated story status ("Approved" or remains "Draft")
|
|
- `business_confidence`: Risk assessment of story value delivery
|
|
- `required_changes`: List of changes needed (if conditional/rejected)
|
|
|
|
## Failure Actions
|
|
- If story has critical business value issues: REJECTED with specific feedback
|
|
- If epic alignment is unclear: Request epic clarification before proceeding
|
|
- If ACs don't reflect business needs: CONDITIONAL with AC revision requirements
|
|
- If scope too large: CONDITIONAL with scope reduction guidance
|
|
|
|
## Quality Gates
|
|
- All checklist categories evaluated with evidence
|
|
- Business value clearly articulated and validated
|
|
- Epic alignment confirmed with specific examples
|
|
- ACs tested against real user scenarios mentally
|
|
- Development readiness confirmed from PO perspective |