2.8 KiB
2.8 KiB
| title | description |
|---|---|
| How to Run Test Design | How to create comprehensive test plans using TEA's test-design workflow |
Use TEA's *test-design workflow to create comprehensive test plans with risk assessment and coverage strategies.
When to Use This
System-level (Phase 3):
- After architecture is complete
- Before implementation-readiness gate
- To validate architecture testability
Epic-level (Phase 4):
- At the start of each epic
- Before implementing stories in the epic
- To identify epic-specific testing needs
Prerequisites
- BMad Method installed
- TEA agent available
- For system-level: Architecture document complete
- For epic-level: Epic defined with stories
Steps
1. Load the TEA Agent
Start a fresh chat and load the TEA (Test Architect) agent.
2. Run the Test Design Workflow
*test-design
3. Specify the Mode
TEA will ask if you want:
- System-level - For architecture testability review (Phase 3)
- Epic-level - For epic-specific test planning (Phase 4)
4. Provide Context
For system-level:
- Point to your architecture document
- Reference any ADRs (Architecture Decision Records)
For epic-level:
- Specify which epic you're planning
- Reference the epic file with stories
5. Review the Output
TEA generates a comprehensive test design document.
What You Get
System-Level Output (test-design-system.md)
- Testability review of architecture
- ADR → test mapping
- Architecturally Significant Requirements (ASRs)
- Environment needs
- Test infrastructure recommendations
Epic-Level Output (test-design-epic-N.md)
- Risk assessment for the epic
- Test priorities
- Coverage plan
- Regression hotspots (for brownfield)
- Integration risks
- Mitigation strategies
Test Design for Different Tracks
Greenfield - BMad Method
| Stage | Test Design Focus |
|---|---|
| Phase 3 | System-level testability review |
| Phase 4 | Per-epic risk assessment and test plan |
Brownfield - BMad Method/Enterprise
| Stage | Test Design Focus |
|---|---|
| Phase 3 | System-level + existing test baseline |
| Phase 4 | Regression hotspots, integration risks |
Enterprise
| Stage | Test Design Focus |
|---|---|
| Phase 3 | Compliance-aware testability |
| Phase 4 | Security/performance/compliance focus |
Tips
- Run system-level test-design right after architecture
- Run epic-level test-design at the start of each epic
- Update test design if ADRs change
- Use the output to guide
*atddand*automateworkflows
Related
- TEA Overview - Understanding the Test Architect
- Setup Test Framework - Setting up testing infrastructure
- Create Architecture - Architecture workflow