BMAD-METHOD/_experiment/planning/roadmap/task-03-tighten-step-01-rou...

749 B

Task 03: Tighten Step 1 — Routing

Prerequisite

Task 01/02 findings indicate step 1 needs tightening.

Intent

Add specificity to step-01-clarify-and-route.md only where skeleton testing revealed gaps. Reference the detailed plan in _experiment/planning/redesign-plan.md for the full spec of what step 1 should do — pull only what's needed.

Likely areas (from the plan)

  • Routing criteria precision (one-shot vs plan-code-review vs full-BMM boundaries)
  • Intent exit criteria enforcement
  • WIP/ready-for-dev artifact detection
  • Project context backfill behavior

Constraint

Keep prompts thin. Add the minimum words needed to close the gap. If the LLM was already doing it right from training, don't add instructions for it.