BMAD-METHOD/expansion-packs/bmad-java/checklists/java-web-project-checklist.md

5.1 KiB

Java Web Project Checklist

Project Planning Phase

Requirements Analysis

  • Business requirements documented
  • User stories defined
  • Functional requirements specified
  • Non-functional requirements identified
  • UI/UX requirements gathered
  • Database requirements defined
  • Security requirements specified
  • Performance requirements defined

Architecture Design

  • System architecture designed
  • Technology stack selected (Java 21, Spring Boot, Maven, AWS)
  • Database schema designed
  • Security architecture planned
  • Deployment architecture defined
  • Monitoring strategy planned
  • Backup and recovery strategy defined

Project Setup Phase

Maven Configuration

  • Maven project structure created
  • pom.xml configured with Java 21
  • Spring Boot parent POM included
  • Required dependencies added
  • Maven compiler plugin configured
  • Spring Boot Maven plugin configured
  • Build profiles configured

Development Environment

  • Java 21 JDK installed and configured
  • IDE configured for Java 21 and Spring Boot
  • Maven wrapper configured
  • Git repository initialized
  • Development database configured
  • Local development environment tested

Web Development Phase

Spring Boot MVC Setup

  • Spring Boot Web starter added
  • MVC configuration completed
  • Controller classes created
  • Request mapping configured
  • Exception handling implemented
  • Validation configured
  • Static resources configured

Frontend Implementation

  • Thymeleaf templates created
  • CSS/JavaScript resources added
  • Form handling implemented
  • Client-side validation added
  • Responsive design implemented
  • Cross-browser compatibility tested

Data Layer

  • Spring Data JPA configured
  • Entity classes created
  • Repository interfaces defined
  • Database migrations created
  • Data validation implemented
  • Transaction management configured

Security Implementation

Spring Security Setup

  • Spring Security dependency added
  • Security configuration created
  • Authentication mechanism implemented
  • Authorization rules defined
  • Password encoding configured
  • Session management configured
  • CSRF protection enabled

Security Best Practices

  • Input validation implemented
  • SQL injection prevention
  • XSS protection configured
  • Security headers configured
  • HTTPS configuration planned
  • Security testing performed

Testing Implementation

Unit Testing

  • JUnit 5 configured
  • Test classes created for controllers
  • Test classes created for services
  • Test classes created for repositories
  • Mock objects used appropriately
  • Test coverage adequate (>80%)

Integration Testing

  • Spring Boot test annotations used
  • Test profiles configured
  • Database tests implemented
  • Web layer tests implemented
  • Security tests implemented
  • End-to-end tests created

AWS Deployment Phase

Infrastructure Setup

  • AWS account configured
  • VPC and networking configured
  • Security groups configured
  • IAM roles and policies created
  • RDS database instance created
  • Application Load Balancer configured

Containerization

  • Dockerfile created
  • Multi-stage build implemented
  • Docker image optimized
  • Container security hardened
  • Health checks implemented
  • Docker Compose configured for local testing

Deployment Configuration

  • ECS/EKS cluster configured
  • Service definition created
  • Task definition configured
  • Auto-scaling configured
  • Load balancing configured
  • Deployment pipeline configured

Monitoring and Logging

  • CloudWatch logging configured
  • Application metrics configured
  • Health check endpoints implemented
  • Error tracking configured
  • Performance monitoring setup
  • Alerting configured

Documentation and Handover

Technical Documentation

  • README.md created with setup instructions
  • API documentation generated
  • Database schema documented
  • Deployment guide written
  • Configuration guide created
  • Troubleshooting guide written

Operational Documentation

  • Monitoring guide created
  • Backup procedures documented
  • Disaster recovery procedures documented
  • Security procedures documented
  • Maintenance procedures documented
  • Team handover completed

Go-Live Validation

Pre-Deployment Checks

  • All tests passing
  • Code review completed
  • Security scan passed
  • Performance testing completed
  • Documentation reviewed
  • Team training completed

Deployment Validation

  • Application deployed successfully
  • Database migrations completed
  • Health checks passing
  • Monitoring active
  • Load balancing working
  • SSL certificates configured

Post-Deployment Validation

  • Application accessible
  • All features working
  • Performance metrics acceptable
  • Error logging working
  • Backup procedures tested
  • Team notified of deployment