5.1 KiB
5.1 KiB
Java Web Project Checklist
Project Planning Phase
Requirements Analysis
- Business requirements documented
- User stories defined
- Functional requirements specified
- Non-functional requirements identified
- UI/UX requirements gathered
- Database requirements defined
- Security requirements specified
- Performance requirements defined
Architecture Design
- System architecture designed
- Technology stack selected (Java 21, Spring Boot, Maven, AWS)
- Database schema designed
- Security architecture planned
- Deployment architecture defined
- Monitoring strategy planned
- Backup and recovery strategy defined
Project Setup Phase
Maven Configuration
- Maven project structure created
- pom.xml configured with Java 21
- Spring Boot parent POM included
- Required dependencies added
- Maven compiler plugin configured
- Spring Boot Maven plugin configured
- Build profiles configured
Development Environment
- Java 21 JDK installed and configured
- IDE configured for Java 21 and Spring Boot
- Maven wrapper configured
- Git repository initialized
- Development database configured
- Local development environment tested
Web Development Phase
Spring Boot MVC Setup
- Spring Boot Web starter added
- MVC configuration completed
- Controller classes created
- Request mapping configured
- Exception handling implemented
- Validation configured
- Static resources configured
Frontend Implementation
- Thymeleaf templates created
- CSS/JavaScript resources added
- Form handling implemented
- Client-side validation added
- Responsive design implemented
- Cross-browser compatibility tested
Data Layer
- Spring Data JPA configured
- Entity classes created
- Repository interfaces defined
- Database migrations created
- Data validation implemented
- Transaction management configured
Security Implementation
Spring Security Setup
- Spring Security dependency added
- Security configuration created
- Authentication mechanism implemented
- Authorization rules defined
- Password encoding configured
- Session management configured
- CSRF protection enabled
Security Best Practices
- Input validation implemented
- SQL injection prevention
- XSS protection configured
- Security headers configured
- HTTPS configuration planned
- Security testing performed
Testing Implementation
Unit Testing
- JUnit 5 configured
- Test classes created for controllers
- Test classes created for services
- Test classes created for repositories
- Mock objects used appropriately
- Test coverage adequate (>80%)
Integration Testing
- Spring Boot test annotations used
- Test profiles configured
- Database tests implemented
- Web layer tests implemented
- Security tests implemented
- End-to-end tests created
AWS Deployment Phase
Infrastructure Setup
- AWS account configured
- VPC and networking configured
- Security groups configured
- IAM roles and policies created
- RDS database instance created
- Application Load Balancer configured
Containerization
- Dockerfile created
- Multi-stage build implemented
- Docker image optimized
- Container security hardened
- Health checks implemented
- Docker Compose configured for local testing
Deployment Configuration
- ECS/EKS cluster configured
- Service definition created
- Task definition configured
- Auto-scaling configured
- Load balancing configured
- Deployment pipeline configured
Monitoring and Logging
- CloudWatch logging configured
- Application metrics configured
- Health check endpoints implemented
- Error tracking configured
- Performance monitoring setup
- Alerting configured
Documentation and Handover
Technical Documentation
- README.md created with setup instructions
- API documentation generated
- Database schema documented
- Deployment guide written
- Configuration guide created
- Troubleshooting guide written
Operational Documentation
- Monitoring guide created
- Backup procedures documented
- Disaster recovery procedures documented
- Security procedures documented
- Maintenance procedures documented
- Team handover completed
Go-Live Validation
Pre-Deployment Checks
- All tests passing
- Code review completed
- Security scan passed
- Performance testing completed
- Documentation reviewed
- Team training completed
Deployment Validation
- Application deployed successfully
- Database migrations completed
- Health checks passing
- Monitoring active
- Load balancing working
- SSL certificates configured
Post-Deployment Validation
- Application accessible
- All features working
- Performance metrics acceptable
- Error logging working
- Backup procedures tested
- Team notified of deployment