1.7 KiB
1.7 KiB
Confirmed Decisions (PM Acceptance)
Date: 2025-10-07
The PM has accepted the analyst recommendations. Below are the recorded defaults, owners, and tentative meeting scheduling for handoff and sprint start.
Product decisions (confirmed)
- Retention default: 90 days (recommended)
- LinkedIn publish default: Opt‑in (user must connect and confirm each publish)
- Monetization at launch: Free with capped usage (introduce paid tiers after validation)
- Aggregated telemetry for cost monitoring: Yes (anonymous, aggregated only)
- Tone presets in MVP: 3 presets (professional, thought‑leadership, casual)
Operational owners (assumed / assigned)
(If you want different owners, edit this file or tell me and I'll update.)
- A) LinkedIn app registration & OAuth setup — Owner: Babz
- B) Provision OpenAI/Whisper accounts & billing alerts — Owner: Babz
- C) Import sprint tickets into tracker (create GH issues from JSON) — Owner: Babz
- D) Deploy serverless stubs to staging (signed-upload, transcribe, generate, publish) — Owner: Babz
Demo scheduling (tentative)
- Suggested demo slot (tentative): Option 2 — Tomorrow at 3:00 PM (30m)
- If this slot doesn't work, please propose two alternatives and I'll update the invite.
Next immediate actions (after acceptance)
- Create GitHub issues from
SPRINT-TICKETS-ISSUES.jsonand assign tickets to owners. - Deploy serverless starter to staging and verify endpoints are reachable for demo.
- Prepare Test LinkedIn account or provide dev tokens for the publish demo.
- Send calendar invite to PM and attendees with
PM-SLIDE.mdandDEMO-INSTRUCTIONS.mdattached.
If any owner assignment is incorrect, reply with changes and I'll update this file and the sprint tickets accordingly.