# Business Analyst (Analyst) - Template Guide
|
|
|
|
## Overview
|
|
|
|
This guide provides comprehensive templates for the Business Analyst persona in the BMAD Method. These templates support the three core working modes: Brainstorming, Research, and Project Briefing, ensuring consistent, high-quality deliverables across all analysis activities.
|
|
|
|
## Template Categories
|
|
|
|
### 1. Research Templates
|
|
Templates for planning, executing, and documenting research activities.
|
|
|
|
### 2. Analysis Templates
|
|
Templates for structuring analysis work and presenting findings.
|
|
|
|
### 3. Brainstorming Templates
|
|
Templates for facilitating ideation sessions and capturing insights.
|
|
|
|
### 4. Documentation Templates
|
|
Templates for creating project briefs and formal documentation.
|
|
|
|
### 5. Communication Templates
|
|
Templates for stakeholder engagement and presentation materials.
|
|
|
|
### 6. Quality Assurance Templates
|
|
Templates for ensuring analysis quality and validation.
|
|
|
|
---
|
|
|
|
## 1. Research Templates
|
|
|
|
### 1.1 Research Brief Template
|
|
**Purpose**: Structure comprehensive research planning
|
|
**Usage**: Research Mode - Initial planning phase
|
|
|
|
```markdown
|
|
# Research Brief: [Project Name]
|
|
|
|
## Executive Summary
|
|
[2-3 sentence overview of research objectives and expected outcomes]
|
|
|
|
## Research Objectives
|
|
### Primary Objective
|
|
[Main research goal - what decision will this research inform?]
|
|
|
|
### Secondary Objectives
|
|
- [Supporting research goal 1]
|
|
- [Supporting research goal 2]
|
|
- [Supporting research goal 3]
|
|
|
|
## Key Research Questions
|
|
### Critical Questions (Must Answer)
|
|
1. [Question that directly impacts primary objective]
|
|
2. [Question that directly impacts primary objective]
|
|
3. [Question that directly impacts primary objective]
|
|
|
|
### Important Questions (Should Answer)
|
|
1. [Supporting question for deeper understanding]
|
|
2. [Supporting question for validation]
|
|
3. [Supporting question for context]
|
|
|
|
### Exploratory Questions (Nice to Answer)
|
|
1. [Question for future consideration]
|
|
2. [Question for broader context]
|
|
|
|
## Research Scope
|
|
### Included
|
|
- [Specific area/topic included]
|
|
- [Specific area/topic included]
|
|
- [Specific area/topic included]
|
|
|
|
### Excluded
|
|
- [Specific area/topic excluded and why]
|
|
- [Specific area/topic excluded and why]
|
|
|
|
## Research Methodology
|
|
### Approach
|
|
[Primary research methodology - quantitative, qualitative, mixed methods]
|
|
|
|
### Methods
|
|
- **Primary Research**: [Surveys, interviews, observations, etc.]
|
|
- **Secondary Research**: [Industry reports, academic studies, competitor analysis]
|
|
- **Data Analysis**: [Statistical analysis, thematic analysis, comparative analysis]
|
|
|
|
### Information Sources
|
|
- **Internal Sources**: [Company data, stakeholder interviews, existing research]
|
|
- **External Sources**: [Industry databases, competitor websites, expert interviews]
|
|
- **Validation Sources**: [How findings will be cross-validated]
|
|
|
|
## Success Criteria
|
|
### Research Quality Indicators
|
|
- [How we'll know the research is comprehensive]
|
|
- [How we'll know the research is reliable]
|
|
- [How we'll know the research is actionable]
|
|
|
|
### Decision Support Criteria
|
|
- [How research will support the primary decision]
|
|
- [What level of confidence is required]
|
|
- [What format findings need to be in]
|
|
|
|
## Timeline & Resources
|
|
### Research Schedule
|
|
- **Week 1**: [Research planning and setup]
|
|
- **Week 2**: [Primary data collection]
|
|
- **Week 3**: [Secondary research and analysis]
|
|
- **Week 4**: [Synthesis and reporting]
|
|
|
|
### Resource Requirements
|
|
- **Personnel**: [Research team composition]
|
|
- **Tools**: [Research tools and platforms needed]
|
|
- **Budget**: [Estimated costs for external resources]
|
|
- **Access**: [Data, systems, or people access needed]
|
|
|
|
## Deliverables
|
|
### Primary Deliverables
|
|
- [Main research report with findings and recommendations]
|
|
- [Executive summary for stakeholders]
|
|
- [Data appendix with supporting evidence]
|
|
|
|
### Supporting Deliverables
|
|
- [Presentation materials for stakeholder review]
|
|
- [Raw data files and analysis workbooks]
|
|
- [Methodology documentation for future reference]
|
|
|
|
## Risk Assessment
|
|
### Research Risks
|
|
- **Risk**: [Potential research limitation]
|
|
- **Impact**: [How this could affect findings]
|
|
- **Mitigation**: [How to address or minimize]
|
|
|
|
### Timeline Risks
|
|
- **Risk**: [Potential delay factor]
|
|
- **Impact**: [Effect on project timeline]
|
|
- **Mitigation**: [Contingency plan]
|
|
|
|
## Stakeholder Engagement
|
|
### Key Stakeholders
|
|
- **Primary**: [Decision makers who will use research]
|
|
- **Secondary**: [Teams affected by research outcomes]
|
|
- **Subject Matter Experts**: [Internal/external experts to consult]
|
|
|
|
### Communication Plan
|
|
- **Kickoff**: [Initial stakeholder alignment meeting]
|
|
- **Check-ins**: [Regular progress updates]
|
|
- **Review**: [Findings validation sessions]
|
|
- **Final Presentation**: [Results communication]
|
|
|
|
---
|
|
**Template Version**: 1.0
|
|
**Last Updated**: [Date]
|
|
**Created By**: Business Analyst
|
|
```
|
|
|
|
### 1.2 Competitive Analysis Template
|
|
**Purpose**: Structure competitive intelligence gathering
|
|
**Usage**: Research Mode - Market analysis
|
|
|
|
```markdown
|
|
# Competitive Analysis: [Market/Product Category]
|
|
|
|
## Analysis Overview
|
|
### Objective
|
|
[What competitive intelligence is needed and why]
|
|
|
|
### Scope
|
|
- **Geographic**: [Markets included in analysis]
|
|
- **Time Period**: [Analysis timeframe]
|
|
- **Competitor Types**: [Direct, indirect, emerging competitors]
|
|
|
|
## Competitor Identification
|
|
### Direct Competitors
|
|
| Competitor | Market Share | Key Strengths | Key Weaknesses |
|
|
|------------|--------------|---------------|----------------|
|
|
| [Name] | [%] | [Strength 1, 2, 3] | [Weakness 1, 2, 3] |
|
|
| [Name] | [%] | [Strength 1, 2, 3] | [Weakness 1, 2, 3] |
|
|
|
|
### Indirect Competitors
|
|
| Competitor | Alternative Solution | Threat Level | Notes |
|
|
|------------|---------------------|--------------|-------|
|
|
| [Name] | [How they solve same problem] | [High/Med/Low] | [Key insights] |
|
|
|
|
### Emerging Competitors
|
|
| Competitor | Innovation/Disruption | Timeline | Potential Impact |
|
|
|------------|----------------------|----------|------------------|
|
|
| [Name] | [What makes them different] | [When threat emerges] | [Potential market impact] |
|
|
|
|
## Feature Comparison Matrix
|
|
| Feature/Capability | Our Product | Competitor A | Competitor B | Competitor C |
|
|
|-------------------|-------------|--------------|--------------|--------------|
|
|
| [Core Feature 1] | [Rating/Description] | [Rating/Description] | [Rating/Description] | [Rating/Description] |
|
|
| [Core Feature 2] | [Rating/Description] | [Rating/Description] | [Rating/Description] | [Rating/Description] |
|
|
| [Pricing] | [Our pricing] | [Their pricing] | [Their pricing] | [Their pricing] |
|
|
| [User Experience] | [Rating/Notes] | [Rating/Notes] | [Rating/Notes] | [Rating/Notes] |
|
|
|
|
## Market Positioning Analysis
|
|
### Positioning Map
|
|
[Description of how competitors position themselves - price vs. features, simplicity vs. power, etc.]
|
|
|
|
### Value Propositions
|
|
- **Our Value Prop**: [How we position ourselves]
|
|
- **Competitor A**: [Their key value proposition]
|
|
- **Competitor B**: [Their key value proposition]
|
|
- **Competitor C**: [Their key value proposition]
|
|
|
|
## Strategic Insights
|
|
### Market Gaps
|
|
- [Unmet customer need 1]
|
|
- [Unmet customer need 2]
|
|
- [Unmet customer need 3]
|
|
|
|
### Competitive Advantages
|
|
- [Our unique advantage 1]
|
|
- [Our unique advantage 2]
|
|
- [Our unique advantage 3]
|
|
|
|
### Competitive Threats
|
|
- [Threat 1 and mitigation strategy]
|
|
- [Threat 2 and mitigation strategy]
|
|
- [Threat 3 and mitigation strategy]
|
|
|
|
## Recommendations
|
|
### Strategic Recommendations
|
|
1. [Strategic recommendation based on analysis]
|
|
2. [Strategic recommendation based on analysis]
|
|
3. [Strategic recommendation based on analysis]
|
|
|
|
### Tactical Recommendations
|
|
1. [Immediate action based on competitive intelligence]
|
|
2. [Immediate action based on competitive intelligence]
|
|
3. [Immediate action based on competitive intelligence]
|
|
|
|
---
|
|
**Analysis Date**: [Date]
|
|
**Next Review**: [Date]
|
|
**Analyst**: [Name]
|
|
```
|
|
|
|
### 1.3 User Research Plan Template
|
|
**Purpose**: Structure user research studies
|
|
**Usage**: Research Mode - User insight gathering
|
|
|
|
```markdown
|
|
# User Research Plan: [Study Name]
|
|
|
|
## Research Overview
|
|
### Research Objectives
|
|
**Primary Question**: [Main question this research will answer]
|
|
|
|
**Secondary Questions**:
|
|
- [Supporting question 1]
|
|
- [Supporting question 2]
|
|
- [Supporting question 3]
|
|
|
|
### Success Criteria
|
|
- [How we'll know the research was successful]
|
|
- [What decisions this research will inform]
|
|
- [What confidence level we need in findings]
|
|
|
|
## Research Design
|
|
### Methodology
|
|
**Research Type**: [Exploratory, Descriptive, Causal]
|
|
**Approach**: [Qualitative, Quantitative, Mixed Methods]
|
|
**Methods**: [Interviews, Surveys, Observations, Usability Testing, etc.]
|
|
|
|
### Participant Criteria
|
|
**Target Participants**: [Who we need to research]
|
|
**Sample Size**: [Number of participants needed]
|
|
**Recruitment Criteria**:
|
|
- **Include**: [Characteristics participants must have]
|
|
- **Exclude**: [Characteristics that disqualify participants]
|
|
|
|
### Research Protocol
|
|
**Session Structure**:
|
|
1. **Introduction** (5 min): [Welcome and context setting]
|
|
2. **Background Questions** (10 min): [Understanding participant context]
|
|
3. **Main Research Activities** (30 min): [Core research tasks/questions]
|
|
4. **Wrap-up** (5 min): [Final questions and next steps]
|
|
|
|
**Key Questions/Tasks**:
|
|
- [Research question/task 1]
|
|
- [Research question/task 2]
|
|
- [Research question/task 3]
|
|
|
|
## Data Collection Plan
|
|
### Data Types
|
|
- **Behavioral Data**: [What actions/behaviors we'll observe]
|
|
- **Attitudinal Data**: [What opinions/feelings we'll capture]
|
|
- **Contextual Data**: [What environmental factors we'll note]
|
|
|
|
### Collection Methods
|
|
- **Recording**: [Audio, video, screen recording permissions and setup]
|
|
- **Note-taking**: [Who takes notes, what format]
|
|
- **Artifacts**: [Any materials participants will create]
|
|
|
|
## Analysis Plan
|
|
### Analysis Approach
|
|
**Method**: [Thematic analysis, statistical analysis, comparative analysis]
|
|
**Framework**: [Any specific analysis frameworks to use]
|
|
|
|
### Key Metrics/Indicators
|
|
- [Quantitative metric 1]
|
|
- [Quantitative metric 2]
|
|
- [Qualitative theme 1]
|
|
- [Qualitative theme 2]
|
|
|
|
## Timeline & Logistics
|
|
### Research Schedule
|
|
- **Planning**: [Dates for research design and setup]
|
|
- **Recruitment**: [Dates for participant recruitment]
|
|
- **Data Collection**: [Dates for research sessions]
|
|
- **Analysis**: [Dates for data analysis]
|
|
- **Reporting**: [Dates for findings documentation]
|
|
|
|
### Logistics
|
|
- **Location**: [Where research will be conducted]
|
|
- **Technology**: [Tools and platforms needed]
|
|
- **Materials**: [Any physical or digital materials needed]
|
|
- **Team Roles**: [Who does what during research]
|
|
|
|
## Ethical Considerations
|
|
### Participant Rights
|
|
- [Informed consent process]
|
|
- [Privacy and confidentiality protections]
|
|
- [Right to withdraw participation]
|
|
- [Data handling and storage procedures]
|
|
|
|
### Bias Mitigation
|
|
- [How we'll minimize researcher bias]
|
|
- [How we'll ensure representative sample]
|
|
- [How we'll validate findings]
|
|
|
|
## Deliverables
|
|
### Research Outputs
|
|
- **Research Report**: [Comprehensive findings and recommendations]
|
|
- **Executive Summary**: [Key insights for stakeholders]
|
|
- **Presentation**: [Findings presentation for team review]
|
|
- **Raw Data**: [Organized data files for future reference]
|
|
|
|
### Success Metrics
|
|
- [How we'll measure research quality]
|
|
- [How we'll measure research impact]
|
|
- [How we'll measure stakeholder satisfaction]
|
|
|
|
---
|
|
**Research Plan Version**: 1.0
|
|
**Created By**: [Analyst Name]
|
|
**Review Date**: [Date]
|
|
```
|
|
|
|
---
|
|
|
|
## 2. Analysis Templates
|
|
|
|
### 2.1 Root Cause Analysis Template
|
|
**Purpose**: Structure systematic problem analysis
|
|
**Usage**: Brainstorming Mode - Problem diagnosis
|
|
|
|
```markdown
|
|
# Root Cause Analysis: [Problem Statement]
|
|
|
|
## Problem Definition
|
|
### Problem Statement
|
|
[Clear, specific description of the problem]
|
|
|
|
### Problem Impact
|
|
- **Business Impact**: [How this affects business outcomes]
|
|
- **User Impact**: [How this affects users/customers]
|
|
- **Operational Impact**: [How this affects day-to-day operations]
|
|
|
|
### Problem Scope
|
|
- **When**: [When does this problem occur?]
|
|
- **Where**: [Where does this problem occur?]
|
|
- **Who**: [Who is affected by this problem?]
|
|
- **What**: [What specifically is happening?]
|
|
|
|
## Initial Hypothesis
|
|
### Suspected Causes
|
|
1. [Initial hypothesis about cause 1]
|
|
2. [Initial hypothesis about cause 2]
|
|
3. [Initial hypothesis about cause 3]
|
|
|
|
### Assumptions to Test
|
|
- [Assumption 1 that needs validation]
|
|
- [Assumption 2 that needs validation]
|
|
- [Assumption 3 that needs validation]
|
|
|
|
## 5 Whys Analysis
|
|
### Problem: [Restate the problem]
|
|
|
|
**Why 1**: [First why - immediate cause]
|
|
**Why 2**: [Second why - cause of the immediate cause]
|
|
**Why 3**: [Third why - deeper cause]
|
|
**Why 4**: [Fourth why - even deeper cause]
|
|
**Why 5**: [Fifth why - root cause]
|
|
|
|
### Root Cause Identified
|
|
[The fundamental cause identified through 5 Whys]
|
|
|
|
## Fishbone Analysis
|
|
### Categories of Potential Causes
|
|
|
|
**People**:
|
|
- [Potential people-related cause 1]
|
|
- [Potential people-related cause 2]
|
|
|
|
**Process**:
|
|
- [Potential process-related cause 1]
|
|
- [Potential process-related cause 2]
|
|
|
|
**Technology**:
|
|
- [Potential technology-related cause 1]
|
|
- [Potential technology-related cause 2]
|
|
|
|
**Environment**:
|
|
- [Potential environment-related cause 1]
|
|
- [Potential environment-related cause 2]
|
|
|
|
**Materials/Information**:
|
|
- [Potential materials/information-related cause 1]
|
|
- [Potential materials/information-related cause 2]
|
|
|
|
**Methods**:
|
|
- [Potential methods-related cause 1]
|
|
- [Potential methods-related cause 2]
|
|
|
|
## Evidence Collection
|
|
### Data Sources
|
|
| Potential Cause | Evidence Type | Data Source | Findings |
|
|
|----------------|---------------|-------------|----------|
|
|
| [Cause 1] | [Quantitative/Qualitative] | [Where to find evidence] | [What evidence shows] |
|
|
| [Cause 2] | [Quantitative/Qualitative] | [Where to find evidence] | [What evidence shows] |
|
|
|
|
### Validation Methods
|
|
- [How we'll test hypothesis 1]
|
|
- [How we'll test hypothesis 2]
|
|
- [How we'll test hypothesis 3]
|
|
|
|
## Root Cause Validation
|
|
### Primary Root Cause
|
|
**Cause**: [The validated root cause]
|
|
**Evidence**: [Evidence that supports this as the root cause]
|
|
**Confidence Level**: [High/Medium/Low and why]
|
|
|
|
### Contributing Factors
|
|
1. [Contributing factor 1 and its role]
|
|
2. [Contributing factor 2 and its role]
|
|
3. [Contributing factor 3 and its role]
|
|
|
|
## Solution Development
|
|
### Solution Options
|
|
| Solution | Addresses Root Cause | Implementation Effort | Expected Impact |
|
|
|----------|---------------------|----------------------|-----------------|
|
|
| [Solution 1] | [Yes/Partially/No] | [High/Medium/Low] | [Expected outcome] |
|
|
| [Solution 2] | [Yes/Partially/No] | [High/Medium/Low] | [Expected outcome] |
|
|
|
|
### Recommended Solution
|
|
**Solution**: [Recommended approach]
|
|
**Rationale**: [Why this solution is recommended]
|
|
**Implementation Plan**: [High-level implementation approach]
|
|
|
|
## Prevention Strategy
|
|
### Process Improvements
|
|
- [Process change to prevent recurrence]
|
|
- [Process change to prevent recurrence]
|
|
|
|
### Monitoring & Detection
|
|
- [How to detect this problem early in future]
|
|
- [What metrics to monitor]
|
|
- [What alerts to set up]
|
|
|
|
---
|
|
**Analysis Date**: [Date]
|
|
**Analyst**: [Name]
|
|
**Validation Status**: [Pending/In Progress/Complete]
|
|
```
|
|
|
|
### 2.2 SWOT Analysis Template
|
|
**Purpose**: Structure strategic situation analysis
|
|
**Usage**: Brainstorming Mode - Strategic assessment
|
|
|
|
```markdown
|
|
# SWOT Analysis: [Organization/Product/Initiative]
|
|
|
|
## Analysis Overview
|
|
### Objective
|
|
[What strategic decision this SWOT analysis will inform]
|
|
|
|
### Scope
|
|
[What specifically is being analyzed - company, product, market entry, etc.]
|
|
|
|
### Analysis Date
|
|
[When this analysis was conducted]
|
|
|
|
## Internal Factors
|
|
|
|
### Strengths
|
|
**What advantages do we have?**
|
|
**What do we do well?**
|
|
**What unique resources can we draw on?**
|
|
**What do others see as our strengths?**
|
|
|
|
1. **[Strength Category 1]**
|
|
- [Specific strength 1]
|
|
- [Specific strength 2]
|
|
- [Specific strength 3]
|
|
|
|
2. **[Strength Category 2]**
|
|
- [Specific strength 1]
|
|
- [Specific strength 2]
|
|
- [Specific strength 3]
|
|
|
|
3. **[Strength Category 3]**
|
|
- [Specific strength 1]
|
|
- [Specific strength 2]
|
|
- [Specific strength 3]
|
|
|
|
### Weaknesses
|
|
**What could we improve?**
|
|
**Where do we have fewer resources than others?**
|
|
**What are others likely to see as weaknesses?**
|
|
|
|
1. **[Weakness Category 1]**
|
|
- [Specific weakness 1]
|
|
- [Specific weakness 2]
|
|
- [Specific weakness 3]
|
|
|
|
2. **[Weakness Category 2]**
|
|
- [Specific weakness 1]
|
|
- [Specific weakness 2]
|
|
- [Specific weakness 3]
|
|
|
|
3. **[Weakness Category 3]**
|
|
- [Specific weakness 1]
|
|
- [Specific weakness 2]
|
|
- [Specific weakness 3]
|
|
|
|
## External Factors
|
|
|
|
### Opportunities
|
|
**What opportunities are open to us?**
|
|
**What trends could we take advantage of?**
|
|
**How can we turn our strengths into opportunities?**
|
|
|
|
1. **[Opportunity Category 1]**
|
|
- [Specific opportunity 1]
|
|
- [Specific opportunity 2]
|
|
- [Specific opportunity 3]
|
|
|
|
2. **[Opportunity Category 2]**
|
|
- [Specific opportunity 1]
|
|
- [Specific opportunity 2]
|
|
- [Specific opportunity 3]
|
|
|
|
3. **[Opportunity Category 3]**
|
|
- [Specific opportunity 1]
|
|
- [Specific opportunity 2]
|
|
- [Specific opportunity 3]
|
|
|
|
### Threats
|
|
**What threats could harm us?**
|
|
**What is our competition doing?**
|
|
**What threats do our weaknesses expose us to?**
|
|
|
|
1. **[Threat Category 1]**
|
|
- [Specific threat 1]
|
|
- [Specific threat 2]
|
|
- [Specific threat 3]
|
|
|
|
2. **[Threat Category 2]**
|
|
- [Specific threat 1]
|
|
- [Specific threat 2]
|
|
- [Specific threat 3]
|
|
|
|
3. **[Threat Category 3]**
|
|
- [Specific threat 1]
|
|
- [Specific threat 2]
|
|
- [Specific threat 3]
|
|
|
|
## Strategic Implications
|
|
|
|
### SO Strategies (Strength-Opportunity)
|
|
**How can we use our strengths to take advantage of opportunities?**
|
|
1. [Strategy leveraging strength to capture opportunity]
|
|
2. [Strategy leveraging strength to capture opportunity]
|
|
3. [Strategy leveraging strength to capture opportunity]
|
|
|
|
### WO Strategies (Weakness-Opportunity)
|
|
**How can we overcome weaknesses to take advantage of opportunities?**
|
|
1. [Strategy to address weakness while pursuing opportunity]
|
|
2. [Strategy to address weakness while pursuing opportunity]
|
|
3. [Strategy to address weakness while pursuing opportunity]
|
|
|
|
### ST Strategies (Strength-Threat)
|
|
**How can we use our strengths to avoid threats?**
|
|
1. [Strategy using strength to mitigate threat]
|
|
2. [Strategy using strength to mitigate threat]
|
|
3. [Strategy using strength to mitigate threat]
|
|
|
|
### WT Strategies (Weakness-Threat)
|
|
**How can we minimize weaknesses and avoid threats?**
|
|
1. [Defensive strategy to address weakness and threat]
|
|
2. [Defensive strategy to address weakness and threat]
|
|
3. [Defensive strategy to address weakness and threat]
|
|
|
|
## Priority Matrix
|
|
|
|
### High Impact, High Urgency
|
|
- [Critical item requiring immediate attention]
|
|
- [Critical item requiring immediate attention]
|
|
|
|
### High Impact, Low Urgency
|
|
- [Important item for strategic planning]
|
|
- [Important item for strategic planning]
|
|
|
|
### Low Impact, High Urgency
|
|
- [Quick win or tactical item]
|
|
- [Quick win or tactical item]
|
|
|
|
### Low Impact, Low Urgency
|
|
- [Item to monitor or consider later]
|
|
- [Item to monitor or consider later]
|
|
|
|
## Action Plan
|
|
|
|
### Immediate Actions (Next 30 days)
|
|
1. [Action to address highest priority item]
|
|
2. [Action to address highest priority item]
|
|
3. [Action to address highest priority item]
|
|
|
|
### Short-term Actions (Next 90 days)
|
|
1. [Action for short-term strategic positioning]
|
|
2. [Action for short-term strategic positioning]
|
|
3. [Action for short-term strategic positioning]
|
|
|
|
### Long-term Actions (Next 12 months)
|
|
1. [Action for long-term strategic advantage]
|
|
2. [Action for long-term strategic advantage]
|
|
3. [Action for long-term strategic advantage]
|
|
|
|
## Success Metrics
|
|
|
|
### Key Performance Indicators
|
|
- [Metric to track strength enhancement]
|
|
- [Metric to track weakness improvement]
|
|
- [Metric to track opportunity capture]
|
|
- [Metric to track threat mitigation]
|
|
|
|
### Review Schedule
|
|
- **Next Review**: [Date for next SWOT analysis]
|
|
- **Review Frequency**: [How often to update this analysis]
|
|
- **Review Triggers**: [Events that would trigger an earlier review]
|
|
|
|
---
|
|
**Analysis Team**: [Who participated in this analysis]
|
|
**Validation Date**: [When findings were validated]
|
|
**Next Update**: [When this analysis should be refreshed]
|
|
```
|
|
|
|
---
|
|
|
|
## 3. Brainstorming Templates
|
|
|
|
### 3.1 Ideation Session Template
|
|
**Purpose**: Structure creative brainstorming sessions
|
|
**Usage**: Brainstorming Mode - Idea generation
|
|
|
|
```markdown
|
|
# Ideation Session: [Session Topic]
|
|
|
|
## Session Overview
|
|
### Objective
|
|
[What we're trying to achieve through this brainstorming session]
|
|
|
|
### Challenge Statement
|
|
[Clear articulation of the problem or opportunity we're addressing]
|
|
|
|
### Success Criteria
|
|
[How we'll know the session was successful]
|
|
|
|
## Session Details
|
|
### Participants
|
|
- **Facilitator**: [Name and role]
|
|
- **Participants**:
|
|
- [Name, role, perspective they bring]
|
|
- [Name, role, perspective they bring]
|
|
- [Name, role, perspective they bring]
|
|
|
|
### Session Logistics
|
|
- **Date**: [Session date]
|
|
- **Duration**: [Session length]
|
|
- **Location**: [Physical or virtual location]
|
|
- **Materials**: [What materials/tools are needed]
|
|
|
|
## Pre-Session Preparation
|
|
### Background Information
|
|
[Key context participants should know before the session]
|
|
|
|
### Constraints & Parameters
|
|
- **Must Have**: [Non-negotiable requirements]
|
|
- **Should Have**: [Important but flexible requirements]
|
|
- **Could Have**: [Nice-to-have features]
|
|
- **Won't Have**: [Explicitly out of scope]
|
|
|
|
### Inspiration Sources
|
|
- [Relevant examples or case studies]
|
|
- [Industry best practices to consider]
|
|
- [Analogous solutions from other domains]
|
|
|
|
## Session Structure
|
|
|
|
### 1. Warm-up (10 minutes)
|
|
**Activity**: [Warm-up exercise to get creative thinking flowing]
|
|
**Purpose**: [Why this warm-up was chosen]
|
|
|
|
### 2. Problem Framing (15 minutes)
|
|
**Activity**: [How we'll ensure everyone understands the challenge]
|
|
**Key Questions**:
|
|
- [Question to clarify the problem]
|
|
- [Question to explore assumptions]
|
|
- [Question to identify constraints]
|
|
|
|
### 3. Divergent Thinking (30 minutes)
|
|
**Technique**: [Brainstorming method - classic brainstorming, brainwriting, SCAMPER, etc.]
|
|
**Rules**:
|
|
- Defer judgment
|
|
- Strive for quantity
|
|
- Build on ideas of others
|
|
- Stay focused on topic
|
|
- Encourage wild ideas
|
|
|
|
**Prompts**:
|
|
- "What if we..."
|
|
- "How might we..."
|
|
- "What would happen if..."
|
|
|
|
### 4. Idea Clustering (15 minutes)
|
|
**Activity**: [How we'll organize and group related ideas]
|
|
**Categories**: [Themes or categories for organizing ideas]
|
|
|
|
### 5. Convergent Thinking (20 minutes)
|
|
**Activity**: [How we'll evaluate and prioritize ideas]
|
|
**Criteria**:
|
|
- Feasibility (Can we do it?)
|
|
- Viability (Should we do it?)
|
|
- Desirability (Do users want it?)
|
|
|
|
### 6. Next Steps (10 minutes)
|
|
**Activity**: [How we'll plan follow-up actions]
|
|
|
|
## Ideation Techniques
|
|
|
|
### Primary Technique: [Chosen Method]
|
|
**Description**: [How this technique works]
|
|
**Why Chosen**: [Why this technique is appropriate for this challenge]
|
|
**Instructions**: [Step-by-step guide for participants]
|
|
|
|
### Backup Techniques
|
|
1. **[Alternative Technique 1]**: [When to use this instead]
|
|
2. **[Alternative Technique 2]**: [When to use this instead]
|
|
|
|
## Idea Capture Template
|
|
|
|
### Idea: [Idea Name/Title]
|
|
**Description**: [Brief description of the idea]
|
|
**How it Works**: [Explanation of how this idea would function]
|
|
**Benefits**: [What advantages this idea provides]
|
|
**Challenges**: [What obstacles might exist]
|
|
**Next Steps**: [What would need to happen to explore this further]
|
|
|
|
## Evaluation Criteria
|
|
|
|
### Feasibility Assessment
|
|
- **Technical Feasibility**: [Can we build/implement this?]
|
|
- **Resource Feasibility**: [Do we have the resources?]
|
|
- **Timeline Feasibility**: [Can we do this in the required timeframe?]
|
|
|
|
### Impact Assessment
|
|
- **User Impact**: [How much would this help users?]
|
|
- **Business Impact**: [How much would this help the business?]
|
|
- **Strategic Alignment**: [How well does this fit our strategy?]
|
|
|
|
### Risk Assessment
|
|
- **Implementation Risk**: [What could go wrong during implementation?]
|
|
- **Market Risk**: [What market factors could affect success?]
|
|
- **Competitive Risk**: [How might competitors respond?]
|
|
|
|
## Session Outcomes
|
|
|
|
### Ideas Generated
|
|
[Total number of ideas generated]
|
|
|
|
### Top Ideas (Post-Evaluation)
|
|
1. **[Idea Name]**
|
|
- **Score**: [Evaluation score]
|
|
- **Rationale**: [Why this idea scored highly]
|
|
- **Next Steps**: [Immediate actions for this idea]
|
|
|
|
2. **[Idea Name]**
|
|
- **Score**: [Evaluation score]
|
|
- **Rationale**: [Why this idea scored highly]
|
|
- **Next Steps**: [Immediate actions for this idea]
|
|
|
|
3. **[Idea Name]**
|
|
- **Score**: [Evaluation score]
|
|
- **Rationale**: [Why this idea scored highly]
|
|
- **Next Steps**: [Immediate actions for this idea]
|
|
|
|
### Insights & Themes
|
|
- [Key insight or pattern that emerged]
|
|
- [Key insight or pattern that emerged]
|
|
- [Key insight or pattern that emerged]
|
|
|
|
## Follow-up Actions
|
|
|
|
### Immediate Actions (Next 7 days)
|
|
1. [Action item with owner and deadline]
|
|
2. [Action item with owner and deadline]
|
|
3. [Action item with owner and deadline]
|
|
|
|
### Short-term Actions (Next 30 days)
|
|
1. [Action item with owner and deadline]
|
|
2. [Action item with owner and deadline]
|
|
3. [Action item with owner and deadline]
|
|
|
|
### Research & Validation Needed
|
|
- [What needs to be researched or validated]
|
|
- [What needs to be researched or validated]
|
|
- [What needs to be researched or validated]
|
|
|
|
---
|
|
**Session Facilitator**: [Name]
|
|
**Session Date**: [Date]
|
|
**Follow-up Review**: [Date for reviewing progress]
|
|
```
|
|
|
|
### 3.2 SCAMPER Analysis Template
|
|
**Purpose**: Structure systematic creative thinking
|
|
**Usage**: Brainstorming Mode - Idea development
|
|
|
|
```markdown
|
|
# SCAMPER Analysis: [Product/Service/Process]
|
|
|
|
## Analysis Overview
|
|
### Subject
|
|
[What we're applying SCAMPER analysis to]
|
|
|
|
### Objective
|
|
[What we hope to achieve through this creative analysis]
|
|
|
|
### Current State
|
|
[Brief description of the current product/service/process]
|
|
|
|
## SCAMPER Framework
|
|
|
|
### S - Substitute
|
|
**Question**: What can be substituted or swapped?
|
|
|
|
**Elements to Consider**:
|
|
- Materials or components
|
|
- People or roles
|
|
- Processes or methods
|
|
- Places or locations
|
|
- Time or sequence
|
|
|
|
**Ideas Generated**:
|
|
1. [Substitution idea 1]
|
|
- **What to substitute**: [Current element]
|
|
- **Substitute with**: [New element]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
2. [Substitution idea 2]
|
|
- **What to substitute**: [Current element]
|
|
- **Substitute with**: [New element]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
### C - Combine
|
|
**Question**: What can be combined or merged?
|
|
|
|
**Elements to Consider**:
|
|
- Features or functions
|
|
- Products or services
|
|
- Processes or steps
|
|
- Teams or departments
|
|
- Technologies or tools
|
|
|
|
**Ideas Generated**:
|
|
1. [Combination idea 1]
|
|
- **What to combine**: [Elements to merge]
|
|
- **How to combine**: [Method of combination]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
2. [Combination idea 2]
|
|
- **What to combine**: [Elements to merge]
|
|
- **How to combine**: [Method of combination]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
### A - Adapt
|
|
**Question**: What can be adapted from elsewhere?
|
|
|
|
**Elements to Consider**:
|
|
- Solutions from other industries
|
|
- Processes from other departments
|
|
- Technologies from other applications
|
|
- Strategies from competitors
|
|
- Methods from other contexts
|
|
|
|
**Ideas Generated**:
|
|
1. [Adaptation idea 1]
|
|
- **Source of adaptation**: [Where this idea comes from]
|
|
- **How to adapt**: [How to modify for our context]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
2. [Adaptation idea 2]
|
|
- **Source of adaptation**: [Where this idea comes from]
|
|
- **How to adapt**: [How to modify for our context]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
### M - Modify/Magnify
|
|
**Question**: What can be modified, magnified, or emphasized?
|
|
|
|
**Elements to Consider**:
|
|
- Size or scale
|
|
- Frequency or speed
|
|
- Strength or intensity
|
|
- Height or length
|
|
- Quantity or volume
|
|
|
|
**Ideas Generated**:
|
|
1. [Modification idea 1]
|
|
- **What to modify**: [Element to change]
|
|
- **How to modify**: [Type of modification]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
2. [Modification idea 2]
|
|
- **What to modify**: [Element to change]
|
|
- **How to modify**: [Type of modification]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
### P - Put to Other Uses
|
|
**Question**: What else can this be used for?
|
|
|
|
**Elements to Consider**:
|
|
- New markets or audiences
|
|
- Different applications
|
|
- Alternative purposes
|
|
- Secondary uses
|
|
- Unexpected contexts
|
|
|
|
**Ideas Generated**:
|
|
1. [Alternative use idea 1]
|
|
- **New use**: [Different application]
|
|
- **Target audience**: [Who would benefit]
|
|
- **Potential benefit**: [Expected value]
|
|
|
|
2. [Alternative use idea 2]
|
|
- **New use**: [Different application]
|
|
- **Target audience**: [Who would benefit]
|
|
- **Potential benefit**: [Expected value]
|
|
|
|
### E - Eliminate
|
|
**Question**: What can be eliminated or reduced?
|
|
|
|
**Elements to Consider**:
|
|
- Unnecessary features
|
|
- Redundant processes
|
|
- Excessive complexity
|
|
- Wasteful steps
|
|
- Outdated components
|
|
|
|
**Ideas Generated**:
|
|
1. [Elimination idea 1]
|
|
- **What to eliminate**: [Element to remove]
|
|
- **Why eliminate**: [Reason for removal]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
2. [Elimination idea 2]
|
|
- **What to eliminate**: [Element to remove]
|
|
- **Why eliminate**: [Reason for removal]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
### R - Reverse/Rearrange
|
|
**Question**: What can be reversed or rearranged?
|
|
|
|
**Elements to Consider**:
|
|
- Order or sequence
|
|
- Roles or responsibilities
|
|
- Cause and effect
|
|
- Positive and negative
|
|
- Inside and outside
|
|
|
|
**Ideas Generated**:
|
|
1. [Reversal/rearrangement idea 1]
|
|
- **What to reverse/rearrange**: [Element to change]
|
|
- **How to reverse/rearrange**: [Method of change]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
2. [Reversal/rearrangement idea 2]
|
|
- **What to reverse/rearrange**: [Element to change]
|
|
- **How to reverse/rearrange**: [Method of change]
|
|
- **Potential benefit**: [Expected improvement]
|
|
|
|
## Idea Evaluation
|
|
|
|
### Top Ideas Summary
|
|
| Idea | SCAMPER Category | Feasibility | Impact | Priority |
|
|
|------|------------------|-------------|--------|----------|
|
|
| [Idea 1] | [S/C/A/M/P/E/R] | [High/Med/Low] | [High/Med/Low] | [High/Med/Low] |
|
|
| [Idea 2] | [S/C/A/M/P/E/R] | [High/Med/Low] | [High/Med/Low] | [High/Med/Low] |
|
|
| [Idea 3] | [S/C/A/M/P/E/R] | [High/Med/Low] | [High/Med/Low] | [High/Med/Low] |
|
|
|
|
### Detailed Evaluation
|
|
|
|
#### Idea 1: [Idea Name]
|
|
**Description**: [Detailed description of the idea]
|
|
**SCAMPER Origin**: [Which SCAMPER prompt generated this]
|
|
**Feasibility Analysis**:
|
|
- **Technical**: [Can we implement this technically?]
|
|
- **Resource**: [Do we have the resources?]
|
|
- **Timeline**: [How long would this take?]
|
|
|
|
**Impact Analysis**:
|
|
- **User Benefit**: [How does this help users?]
|
|
- **Business Value**: [How does this help the business?]
|
|
- **Competitive Advantage**: [Does this differentiate us?]
|
|
|
|
**Implementation Considerations**:
|
|
- **Requirements**: [What would we need to implement this?]
|
|
- **Risks**: [What could go wrong?]
|
|
- **Dependencies**: [What else needs to happen first?]
|
|
|
|
## Next Steps
|
|
|
|
### Immediate Actions
|
|
1. [Action to further develop top idea]
|
|
2. [Action to validate assumptions]
|
|
3. [Action to assess feasibility]
|
|
|
|
### Research Needed
|
|
- [What needs to be researched before proceeding]
|
|
- [What validation is required]
|
|
- [What expert input is needed]
|
|
|
|
### Decision Points
|
|
- [Key decisions that need to be made]
|
|
- [Who needs to be involved in decisions]
|
|
- [Timeline for decision making]
|
|
|
|
---
|
|
**Analysis Date**: [Date]
|
|
**Analyst**: [Name]
|
|
**Review Date**: [When to review progress]
|
|
```
|
|
|
|
---
|
|
|
|
## 4. Documentation Templates
|
|
|
|
### 4.1 Project Brief Template
|
|
**Purpose**: Create comprehensive project documentation
|
|
**Usage**: Briefing Mode - Project initiation
|
|
|
|
```markdown
|
|
# Project Brief: [Project Name]
|
|
|
|
## Executive Summary
|
|
[2-3 paragraph overview covering the problem, solution approach, expected outcomes, and resource requirements]
|
|
|
|
## Project Overview
|
|
|
|
### Problem Statement
|
|
**Current Situation**: [What is happening now that needs to change?]
|
|
**Pain Points**: [What specific problems are we solving?]
|
|
**Impact of Inaction**: [What happens if we don't address this?]
|
|
|
|
### Project Objectives
|
|
**Primary Objective**: [Main goal this project will achieve]
|
|
|
|
**Secondary Objectives**:
|
|
- [Supporting objective 1]
|
|
- [Supporting objective 2]
|
|
- [Supporting objective 3]
|
|
|
|
**Success Criteria**: [How we'll know the project was successful]
|
|
|
|
### Solution Approach
|
|
**Proposed Solution**: [High-level description of what we plan to build/implement]
|
|
**Key Features**: [Main capabilities or components]
|
|
**Approach Rationale**: [Why this approach was chosen]
|
|
|
|
## Business Case
|
|
|
|
### Business Value
|
|
**Quantifiable Benefits**:
|
|
- [Measurable benefit 1 with estimated value]
|
|
- [Measurable benefit 2 with estimated value]
|
|
- [Measurable benefit 3 with estimated value]
|
|
|
|
**Qualitative Benefits**:
|
|
- [Intangible benefit 1]
|
|
- [Intangible benefit 2]
|
|
- [Intangible benefit 3]
|
|
|
|
### Cost-Benefit Analysis
|
|
**Investment Required**: [Total project cost estimate]
|
|
**Expected ROI**: [Return on investment calculation]
|
|
**Payback Period**: [How long to recoup investment]
|
|
|
|
### Risk Assessment
|
|
**High-Risk Items**:
|
|
- **Risk**: [Description of risk]
|
|
- **Probability**: [High/Medium/Low]
|
|
- **Impact**: [High/Medium/Low]
|
|
- **Mitigation**: [How to address this risk]
|
|
|
|
**Medium-Risk Items**:
|
|
- **Risk**: [Description of risk]
|
|
- **Probability**: [High/Medium/Low]
|
|
- **Impact**: [High/Medium/Low]
|
|
- **Mitigation**: [How to address this risk]
|
|
|
|
## Project Scope
|
|
|
|
### In Scope
|
|
**Functional Requirements**:
|
|
- [What the system/solution will do]
|
|
- [What the system/solution will do]
|
|
- [What the system/solution will do]
|
|
|
|
**Non-Functional Requirements**:
|
|
- [Performance requirements]
|
|
- [Security requirements]
|
|
- [Usability requirements]
|
|
|
|
**Deliverables**:
|
|
- [Deliverable 1 with description]
|
|
- [Deliverable 2 with description]
|
|
- [Deliverable 3 with description]
|
|
|
|
### Out of Scope
|
|
**Explicitly Excluded**:
|
|
- [What we will NOT include and why]
|
|
- [What we will NOT include and why]
|
|
- [What we will NOT include and why]
|
|
|
|
**Future Considerations**:
|
|
- [Items for potential future phases]
|
|
- [Items for potential future phases]
|
|
|
|
## Stakeholder Analysis
|
|
|
|
### Primary Stakeholders
|
|
| Stakeholder | Role | Interest | Influence | Engagement Strategy |
|
|
|-------------|------|----------|-----------|-------------------|
|
|
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
|
|
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
|
|
|
|
### Secondary Stakeholders
|
|
| Stakeholder | Role | Interest | Influence | Engagement Strategy |
|
|
|-------------|------|----------|-----------|-------------------|
|
|
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
|
|
| [Name/Group] | [Their role] | [What they care about] | [High/Med/Low] | [How to engage them] |
|
|
|
|
## User Analysis
|
|
|
|
### Primary Users
|
|
**User Group 1**: [User type]
|
|
- **Characteristics**: [Who they are]
|
|
- **Needs**: [What they need from this solution]
|
|
- **Pain Points**: [Current frustrations]
|
|
- **Success Criteria**: [How they'll measure success]
|
|
|
|
**User Group 2**: [User type]
|
|
- **Characteristics**: [Who they are]
|
|
- **Needs**: [What they need from this solution]
|
|
- **Pain Points**: [Current frustrations]
|
|
- **Success Criteria**: [How they'll measure success]
|
|
|
|
### User Journey Considerations
|
|
**Current State**: [How users currently accomplish their goals]
|
|
**Future State**: [How users will accomplish goals with new solution]
|
|
**Key Improvements**: [What will be better in the future state]
|
|
|
|
## Technical Considerations
|
|
|
|
### Technical Requirements
|
|
**Platform Requirements**: [What platforms/systems this needs to work with]
|
|
**Integration Requirements**: [What systems this needs to integrate with]
|
|
**Performance Requirements**: [Speed, capacity, availability requirements]
|
|
**Security Requirements**: [Security and compliance needs]
|
|
|
|
### Technical Constraints
|
|
**Technology Constraints**: [Limitations on technology choices]
|
|
**Resource Constraints**: [Limitations on technical resources]
|
|
**Timeline Constraints**: [Technical limitations due to timeline]
|
|
|
|
### Architecture Considerations
|
|
**High-Level Architecture**: [Basic architectural approach]
|
|
**Key Technical Decisions**: [Important technical choices to be made]
|
|
**Technical Risks**: [Technology-related risks and mitigation strategies]
|
|
|
|
## Project Timeline
|
|
|
|
### High-Level Phases
|
|
**Phase 1: [Phase Name]** ([Duration])
|
|
- [Key activities and deliverables]
|
|
- [Key milestones]
|
|
|
|
**Phase 2: [Phase Name]** ([Duration])
|
|
- [Key activities and deliverables]
|
|
- [Key milestones]
|
|
|
|
**Phase 3: [Phase Name]** ([Duration])
|
|
- [Key activities and deliverables]
|
|
- [Key milestones]
|
|
|
|
### Critical Milestones
|
|
| Milestone | Date | Description | Dependencies |
|
|
|-----------|------|-------------|--------------|
|
|
| [Milestone 1] | [Date] | [What will be completed] | [What needs to happen first] |
|
|
| [Milestone 2] | [Date] | [What will be completed] | [What needs to happen first] |
|
|
|
|
### Dependencies
|
|
**Internal Dependencies**:
|
|
- [Dependency on other internal projects/teams]
|
|
- [Dependency on other internal projects/teams]
|
|
|
|
**External Dependencies**:
|
|
- [Dependency on external vendors/partners]
|
|
- [Dependency on external vendors/partners]
|
|
|
|
## Resource Requirements
|
|
|
|
### Team Structure
|
|
**Project Manager**: [Name or TBD]
|
|
**Technical Lead**: [Name or TBD]
|
|
**Development Team**: [Size and skills needed]
|
|
**Design Team**: [Size and skills needed]
|
|
**Other Roles**: [Any other specialized roles needed]
|
|
|
|
### Budget Requirements
|
|
**Personnel Costs**: [Estimated cost for team]
|
|
**Technology Costs**: [Software, hardware, cloud costs]
|
|
**External Costs**: [Vendors, consultants, other external costs]
|
|
**Total Budget**: [Total estimated project cost]
|
|
|
|
### Infrastructure Requirements
|
|
**Development Environment**: [What's needed for development]
|
|
**Testing Environment**: [What's needed for testing]
|
|
**Production Environment**: [What's needed for deployment]
|
|
|
|
## Success Metrics
|
|
|
|
### Key Performance Indicators
|
|
**Business Metrics**:
|
|
- [Business KPI 1]: [Current baseline] [Target]
|
|
- [Business KPI 2]: [Current baseline] [Target]
|
|
- [Business KPI 3]: [Current baseline] [Target]
|
|
|
|
**User Metrics**:
|
|
- [User KPI 1]: [Current baseline] [Target]
|
|
- [User KPI 2]: [Current baseline] [Target]
|
|
- [User KPI 3]: [Current baseline] [Target]
|
|
|
|
**Technical Metrics**:
|
|
- [Technical KPI 1]: [Current baseline] [Target]
|
|
- [Technical KPI 2]: [Current baseline] [Target]
|
|
|
|
### Measurement Plan
|
|
**Data Collection**: [How metrics will be collected]
|
|
**Reporting Schedule**: [How often metrics will be reported]
|
|
**Review Process**: [How metrics will be reviewed and acted upon]
|
|
|
|
## Communication Plan
|
|
|
|
### Stakeholder Communication
|
|
**Executive Updates**: [Frequency and format for executive communication]
|
|
**Team Updates**: [Frequency and format for team communication]
|
|
**User Communication**: [How users will be kept informed]
|
|
|
|
### Reporting Structure
|
|
**Status Reports**: [What will be reported and when]
|
|
**Escalation Process**: [How issues will be escalated]
|
|
**Decision-Making Process**: [How project decisions will be made]
|
|
|
|
## Next Steps
|
|
|
|
### Immediate Actions (Next 2 weeks)
|
|
1. [Action item with owner and deadline]
|
|
2. [Action item with owner and deadline]
|
|
3. [Action item with owner and deadline]
|
|
|
|
### Project Initiation (Next 30 days)
|
|
1. [Action item with owner and deadline]
|
|
2. [Action item with owner and deadline]
|
|
3. [Action item with owner and deadline]
|
|
|
|
### Approval Requirements
|
|
**Required Approvals**: [Who needs to approve this project brief]
|
|
**Approval Timeline**: [When approvals are needed]
|
|
**Approval Criteria**: [What criteria will be used for approval]
|
|
|
|
---
|
|
**Document Version**: 1.0
|
|
**Created By**: [Business Analyst Name]
|
|
**Creation Date**: [Date]
|
|
**Last Updated**: [Date]
|
|
**Next Review**: [Date]
|
|
```
|
|
|
|
### 4.2 Requirements Specification Template
|
|
**Purpose**: Document detailed functional and non-functional requirements
|
|
**Usage**: Briefing Mode - Detailed requirements documentation
|
|
|
|
```markdown
|
|
# Requirements Specification: [Project Name]
|
|
|
|
## Document Information
|
|
**Document Version**: [Version number]
|
|
**Created By**: [Business Analyst name]
|
|
**Creation Date**: [Date]
|
|
**Last Updated**: [Date]
|
|
**Approved By**: [Approver name and date]
|
|
|
|
## Table of Contents
|
|
1. Introduction
|
|
2. Functional Requirements
|
|
3. Non-Functional Requirements
|
|
4. User Interface Requirements
|
|
5. Integration Requirements
|
|
6. Data Requirements
|
|
7. Security Requirements
|
|
8. Compliance Requirements
|
|
9. Assumptions and Dependencies
|
|
10. Acceptance Criteria
|
|
|
|
## 1. Introduction
|
|
|
|
### 1.1 Purpose
|
|
[Purpose of this requirements document]
|
|
|
|
### 1.2 Scope
|
|
[What is covered by these requirements]
|
|
|
|
### 1.3 Definitions and Acronyms
|
|
| Term | Definition |
|
|
|------|------------|
|
|
| [Term 1] | [Definition] |
|
|
| [Term 2] | [Definition] |
|
|
|
|
### 1.4 References
|
|
- [Reference document 1]
|
|
- [Reference document 2]
|
|
|
|
## 2. Functional Requirements
|
|
|
|
### 2.1 User Management
|
|
**REQ-001: User Registration**
|
|
- **Description**: [Detailed description of requirement]
|
|
- **Priority**: [High/Medium/Low]
|
|
- **Source**: [Who requested this requirement]
|
|
- **Acceptance Criteria**:
|
|
- [Specific criterion 1]
|
|
- [Specific criterion 2]
|
|
- [Specific criterion 3]
|
|
|
|
**REQ-002: User Authentication**
|
|
- **Description**: [Detailed description of requirement]
|
|
- **Priority**: [High/Medium/Low]
|
|
- **Source**: [Who requested this requirement]
|
|
- **Acceptance Criteria**:
|
|
- [Specific criterion 1]
|
|
- [Specific criterion 2]
|
|
- [Specific criterion 3]
|
|
|
|
### 2.2 Core Functionality
|
|
**REQ-003: [Core Function 1]**
|
|
- **Description**: [Detailed description of requirement]
|
|
- **Priority**: [High/Medium/Low]
|
|
- **Source**: [Who requested this requirement]
|
|
- **Business Rules**:
|
|
- [Business rule 1]
|
|
- [Business rule 2]
|
|
- **Acceptance Criteria**:
|
|
- [Specific criterion 1]
|
|
- [Specific criterion 2]
|
|
- [Specific criterion 3]
|
|
|
|
**REQ-004: [Core Function 2]**
|
|
- **Description**: [Detailed description of requirement]
|
|
- **Priority**: [High/Medium/Low]
|
|
- **Source**: [Who requested this requirement]
|
|
- **Business Rules**:
|
|
- [Business rule 1]
|
|
- [Business rule 2]
|
|
- **Acceptance Criteria**:
|
|
- [Specific criterion 1]
|
|
- [Specific criterion 2]
|
|
- [Specific criterion 3]
|
|
|
|
### 2.3 Reporting and Analytics
|
|
**REQ-005: [Reporting Requirement]**
|
|
- **Description**: [Detailed description of requirement]
|
|
- **Priority**: [High/Medium/Low]
|
|
- **Source**: [Who requested this requirement]
|
|
- **Data Sources**: [Where data comes from]
|
|
- **Acceptance Criteria**:
|
|
- [Specific criterion 1]
|
|
- [Specific criterion 2]
|
|
- [Specific criterion 3]
|
|
|
|
## 3. Non-Functional Requirements
|
|
|
|
### 3.1 Performance Requirements
|
|
**NFR-001: Response Time**
|
|
- **Requirement**: [Specific performance requirement]
|
|
- **Measurement**: [How this will be measured]
|
|
- **Acceptance Criteria**: [Specific performance targets]
|
|
|
|
**NFR-002: Throughput**
|
|
- **Requirement**: [Specific throughput requirement]
|
|
- **Measurement**: [How this will be measured]
|
|
- **Acceptance Criteria**: [Specific throughput targets]
|
|
|
|
### 3.2 Scalability Requirements
|
|
**NFR-003: User Capacity**
|
|
- **Requirement**: [Specific scalability requirement]
|
|
- **Measurement**: [How this will be measured]
|
|
- **Acceptance Criteria**: [Specific capacity targets]
|
|
|
|
### 3.3 Availability Requirements
|
|
**NFR-004: System Uptime**
|
|
- **Requirement**: [Specific availability requirement]
|
|
- **Measurement**: [How this will be measured]
|
|
- **Acceptance Criteria**: [Specific uptime targets]
|
|
|
|
### 3.4 Reliability Requirements
|
|
**NFR-005: Error Rate**
|
|
- **Requirement**: [Specific reliability requirement]
|
|
- **Measurement**: [How this will be measured]
|
|
- **Acceptance Criteria**: [Specific reliability targets]
|
|
|
|
## 4. User Interface Requirements
|
|
|
|
### 4.1 General UI Requirements
|
|
**UIR-001: Responsive Design**
|
|
- **Requirement**: [Specific UI requirement]
|
|
- **Platforms**: [Which platforms this applies to]
|
|
- **Acceptance Criteria**: [Specific UI criteria]
|
|
|
|
**UIR-002: Accessibility**
|
|
- **Requirement**: [Specific accessibility requirement]
|
|
- **Standards**: [Which accessibility standards to follow]
|
|
- **Acceptance Criteria**: [Specific accessibility criteria]
|
|
|
|
### 4.2 Specific Interface Requirements
|
|
**UIR-003: [Specific Interface]**
|
|
- **Requirement**: [Detailed interface requirement]
|
|
- **User Experience**: [Expected user experience]
|
|
- **Acceptance Criteria**: [Specific interface criteria]
|
|
|
|
## 5. Integration Requirements
|
|
|
|
### 5.1 System Integrations
|
|
**INT-001: [External System 1]**
|
|
- **Integration Type**: [API, File transfer, Database, etc.]
|
|
- **Data Exchange**: [What data is exchanged]
|
|
- **Frequency**: [How often integration occurs]
|
|
- **Error Handling**: [How errors are handled]
|
|
- **Acceptance Criteria**: [Integration success criteria]
|
|
|
|
**INT-002: [External System 2]**
|
|
- **Integration Type**: [API, File transfer, Database, etc.]
|
|
- **Data Exchange**: [What data is exchanged]
|
|
- **Frequency**: [How often integration occurs]
|
|
- **Error Handling**: [How errors are handled]
|
|
- **Acceptance Criteria**: [Integration success criteria]
|
|
|
|
### 5.2 Third-Party Services
|
|
**INT-003: [Third-Party Service]**
|
|
- **Service Provider**: [Name of service provider]
|
|
- **Service Type**: [Type of service]
|
|
- **Integration Method**: [How integration is implemented]
|
|
- **Acceptance Criteria**: [Service integration criteria]
|
|
|
|
## 6. Data Requirements
|
|
|
|
### 6.1 Data Storage Requirements
|
|
**DAT-001: Data Retention**
|
|
- **Requirement**: [Specific data retention requirement]
|
|
- **Data Types**: [What types of data this applies to]
|
|
- **Retention Period**: [How long data is retained]
|
|
- **Disposal Method**: [How data is disposed of]
|
|
|
|
**DAT-002: Data Backup**
|
|
- **Requirement**: [Specific backup requirement]
|
|
- **Backup Frequency**: [How often backups occur]
|
|
- **Recovery Time**: [How quickly data can be recovered]
|
|
- **Acceptance Criteria**: [Backup success criteria]
|
|
|
|
### 6.2 Data Quality Requirements
|
|
**DAT-003: Data Validation**
|
|
- **Requirement**: [Specific validation requirement]
|
|
- **Validation Rules**: [What validation rules apply]
|
|
- **Error Handling**: [How validation errors are handled]
|
|
- **Acceptance Criteria**: [Data quality criteria]
|
|
|
|
## 7. Security Requirements
|
|
|
|
### 7.1 Authentication and Authorization
|
|
**SEC-001: User Authentication**
|
|
- **Requirement**: [Specific authentication requirement]
|
|
- **Authentication Method**: [How users authenticate]
|
|
- **Password Policy**: [Password requirements]
|
|
- **Acceptance Criteria**: [Authentication criteria]
|
|
|
|
**SEC-002: Access Control**
|
|
- **Requirement**: [Specific authorization requirement]
|
|
- **Role-Based Access**: [How roles and permissions work]
|
|
- **Access Levels**: [Different levels of access]
|
|
- **Acceptance Criteria**: [Authorization criteria]
|
|
|
|
### 7.2 Data Protection
|
|
**SEC-003: Data Encryption**
|
|
- **Requirement**: [Specific encryption requirement]
|
|
- **Encryption Standards**: [Which encryption standards to use]
|
|
- **Key Management**: [How encryption keys are managed]
|
|
- **Acceptance Criteria**: [Encryption criteria]
|
|
|
|
**SEC-004: Data Privacy**
|
|
- **Requirement**: [Specific privacy requirement]
|
|
- **Personal Data Handling**: [How personal data is handled]
|
|
- **Consent Management**: [How user consent is managed]
|
|
- **Acceptance Criteria**: [Privacy criteria]
|
|
|
|
## 8. Compliance Requirements
|
|
|
|
### 8.1 Regulatory Compliance
|
|
**COM-001: [Regulation 1]**
|
|
- **Regulation**: [Name of regulation]
|
|
- **Requirements**: [Specific compliance requirements]
|
|
- **Implementation**: [How compliance is achieved]
|
|
- **Acceptance Criteria**: [Compliance criteria]
|
|
|
|
**COM-002: [Regulation 2]**
|
|
- **Regulation**: [Name of regulation]
|
|
- **Requirements**: [Specific compliance requirements]
|
|
- **Implementation**: [How compliance is achieved]
|
|
- **Acceptance Criteria**: [Compliance criteria]
|
|
|
|
### 8.2 Industry Standards
|
|
**COM-003: [Standard 1]**
|
|
- **Standard**: [Name of standard]
|
|
- **Requirements**: [Specific standard requirements]
|
|
- **Implementation**: [How standard is met]
|
|
- **Acceptance Criteria**: [Standard compliance criteria]
|
|
|
|
## 9. Assumptions and Dependencies
|
|
|
|
### 9.1 Assumptions
|
|
- [Assumption 1 about project context]
|
|
- [Assumption 2 about resources]
|
|
- [Assumption 3 about technology]
|
|
|
|
### 9.2 Dependencies
|
|
**Internal Dependencies**:
|
|
- [Dependency on other internal projects]
|
|
- [Dependency on internal resources]
|
|
|
|
**External Dependencies**:
|
|
- [Dependency on external vendors]
|
|
- [Dependency on external systems]
|
|
|
|
## 10. Acceptance Criteria
|
|
|
|
### 10.1 Functional Acceptance
|
|
**Criteria for functional requirements acceptance**:
|
|
- [All functional requirements are implemented as specified]
|
|
- [All business rules are correctly enforced]
|
|
- [All user workflows function as designed]
|
|
|
|
### 10.2 Non-Functional Acceptance
|
|
**Criteria for non-functional requirements acceptance**:
|
|
- [All performance targets are met]
|
|
- [All security requirements are implemented]
|
|
- [All compliance requirements are satisfied]
|
|
|
|
### 10.3 User Acceptance
|
|
**Criteria for user acceptance**:
|
|
- [Users can successfully complete all primary tasks]
|
|
- [User satisfaction meets target levels]
|
|
- [Training and documentation are adequate]
|
|
|
|
---
|
|
**Requirements Traceability**: [Reference to traceability matrix]
|
|
**Change Control**: [Process for managing requirement changes]
|
|
**Approval**: [Approval signatures and dates]
|
|
```
|
|
|
|
---
|
|
|
|
## 5. Communication Templates
|
|
|
|
### 5.1 Stakeholder Presentation Template
|
|
**Purpose**: Present analysis findings to stakeholders
|
|
**Usage**: All Modes - Results communication
|
|
|
|
```markdown
|
|
# Stakeholder Presentation: [Analysis Topic]
|
|
|
|
## Presentation Overview
|
|
### Objective
|
|
[What this presentation aims to achieve]
|
|
|
|
### Audience
|
|
[Who will be attending this presentation]
|
|
|
|
### Duration
|
|
[Expected presentation length]
|
|
|
|
### Desired Outcomes
|
|
[What decisions or actions should result from this presentation]
|
|
|
|
## Slide Structure
|
|
|
|
### Slide 1: Title Slide
|
|
**Title**: [Presentation title]
|
|
**Subtitle**: [Analysis focus or key question addressed]
|
|
**Presenter**: [Your name and role]
|
|
**Date**: [Presentation date]
|
|
**Audience**: [Stakeholder group]
|
|
|
|
### Slide 2: Agenda
|
|
**Presentation Flow**:
|
|
1. Executive Summary (5 minutes)
|
|
2. Analysis Overview (5 minutes)
|
|
3. Key Findings (15 minutes)
|
|
4. Recommendations (10 minutes)
|
|
5. Next Steps (5 minutes)
|
|
6. Q&A (10 minutes)
|
|
|
|
### Slide 3: Executive Summary
|
|
**Key Points**:
|
|
- [Most important finding or insight]
|
|
- [Primary recommendation]
|
|
- [Expected impact or outcome]
|
|
- [Required decision or action]
|
|
|
|
### Slide 4: Analysis Context
|
|
**Background**:
|
|
- [Why this analysis was conducted]
|
|
- [What questions we sought to answer]
|
|
- [What methods were used]
|
|
|
|
**Scope**:
|
|
- [What was included in the analysis]
|
|
- [What was excluded and why]
|
|
- [Time period covered]
|
|
|
|
### Slides 5-8: Key Findings
|
|
**Finding 1**: [Primary insight]
|
|
- **Evidence**: [Data or research supporting this finding]
|
|
- **Implication**: [What this means for the business/project]
|
|
- **Confidence Level**: [How certain we are about this finding]
|
|
|
|
**Finding 2**: [Secondary insight]
|
|
- **Evidence**: [Data or research supporting this finding]
|
|
- **Implication**: [What this means for the business/project]
|
|
- **Confidence Level**: [How certain we are about this finding]
|
|
|
|
**Finding 3**: [Additional insight]
|
|
- **Evidence**: [Data or research supporting this finding]
|
|
- **Implication**: [What this means for the business/project]
|
|
- **Confidence Level**: [How certain we are about this finding]
|
|
|
|
**Finding 4**: [Supporting insight]
|
|
- **Evidence**: [Data or research supporting this finding]
|
|
- **Implication**: [What this means for the business/project]
|
|
- **Confidence Level**: [How certain we are about this finding]
|
|
|
|
### Slides 9-11: Recommendations
|
|
**Recommendation 1**: [Primary recommendation]
|
|
- **Rationale**: [Why this recommendation is made]
|
|
- **Expected Impact**: [What outcomes this should produce]
|
|
- **Implementation Effort**: [High/Medium/Low effort required]
|
|
- **Timeline**: [When this should be implemented]
|
|
|
|
**Recommendation 2**: [Secondary recommendation]
|
|
- **Rationale**: [Why this recommendation is made]
|
|
- **Expected Impact**: [What outcomes this should produce]
|
|
- **Implementation Effort**: [High/Medium/Low effort required]
|
|
- **Timeline**: [When this should be implemented]
|
|
|
|
**Recommendation 3**: [Additional recommendation]
|
|
- **Rationale**: [Why this recommendation is made]
|
|
- **Expected Impact**: [What outcomes this should produce]
|
|
- **Implementation Effort**: [High/Medium/Low effort required]
|
|
- **Timeline**: [When this should be implemented]
|
|
|
|
### Slide 12: Implementation Roadmap
|
|
**Phase 1** (Immediate - Next 30 days):
|
|
- [Action item 1]
|
|
- [Action item 2]
|
|
|
|
**Phase 2** (Short-term - Next 90 days):
|
|
- [Action item 1]
|
|
- [Action item 2]
|
|
|
|
**Phase 3** (Long-term - Next 6-12 months):
|
|
- [Action item 1]
|
|
- [Action item 2]
|
|
|
|
### Slide 13: Resource Requirements
|
|
**Personnel**:
|
|
- [Team members or roles needed]
|
|
- [Estimated time commitment]
|
|
|
|
**Budget**:
|
|
- [Financial resources required]
|
|
- [Cost-benefit analysis summary]
|
|
|
|
**Technology/Tools**:
|
|
- [Systems or tools needed]
|
|
- [Infrastructure requirements]
|
|
|
|
### Slide 14: Success Metrics
|
|
**Key Performance Indicators**:
|
|
- [Metric 1]: [Current state] [Target state]
|
|
- [Metric 2]: [Current state] [Target state]
|
|
- [Metric 3]: [Current state] [Target state]
|
|
|
|
**Measurement Plan**:
|
|
- [How success will be measured]
|
|
- [When measurements will be taken]
|
|
- [Who is responsible for tracking]
|
|
|
|
### Slide 15: Risks and Mitigation
|
|
**High-Priority Risks**:
|
|
- **Risk**: [Description of risk]
|
|
- **Probability**: [High/Medium/Low]
|
|
- **Impact**: [High/Medium/Low]
|
|
- **Mitigation**: [How to address this risk]
|
|
|
|
**Medium-Priority Risks**:
|
|
- **Risk**: [Description of risk]
|
|
- **Probability**: [High/Medium/Low]
|
|
- **Impact**: [High/Medium/Low]
|
|
- **Mitigation**: [How to address this risk]
|
|
|
|
### Slide 16: Next Steps
|
|
**Immediate Actions** (Next 2 weeks):
|
|
1. [Action item with owner]
|
|
2. [Action item with owner]
|
|
3. [Action item with owner]
|
|
|
|
**Decision Points**:
|
|
- [Decision needed and by when]
|
|
- [Who needs to make the decision]
|
|
- [Information needed for decision]
|
|
|
|
**Follow-up**:
|
|
- [Next meeting or checkpoint]
|
|
- [Additional analysis needed]
|
|
- [Progress reporting plan]
|
|
|
|
### Slide 17: Questions & Discussion
|
|
**Discussion Topics**:
|
|
- [Key topic for stakeholder input]
|
|
- [Area where feedback is needed]
|
|
- [Decision that requires stakeholder alignment]
|
|
|
|
**Contact Information**:
|
|
- [Your contact information for follow-up]
|
|
- [Team member contacts if relevant]
|
|
|
|
## Presentation Notes
|
|
|
|
### Key Messages to Emphasize
|
|
1. [Most important point to communicate]
|
|
2. [Second most important point]
|
|
3. [Third most important point]
|
|
|
|
### Potential Questions and Responses
|
|
**Q**: [Likely question from stakeholders]
|
|
**A**: [Prepared response]
|
|
|
|
**Q**: [Another likely question]
|
|
**A**: [Prepared response]
|
|
|
|
**Q**: [Potential challenging question]
|
|
**A**: [Thoughtful response addressing concerns]
|
|
|
|
### Backup Slides
|
|
**Additional Detail on Finding 1**:
|
|
[More detailed analysis for deeper questions]
|
|
|
|
**Methodology Details**:
|
|
[Detailed explanation of analysis methods]
|
|
|
|
**Data Sources**:
|
|
[Complete list of information sources used]
|
|
|
|
## Follow-up Actions
|
|
|
|
### Post-Presentation Tasks
|
|
1. [Send presentation materials to attendees]
|
|
2. [Document decisions made during presentation]
|
|
3. [Schedule follow-up meetings as needed]
|
|
4. [Begin implementation of approved recommendations]
|
|
|
|
### Communication Plan
|
|
- [How decisions will be communicated to broader team]
|
|
- [Timeline for implementation updates]
|
|
- [Process for ongoing stakeholder engagement]
|
|
|
|
---
|
|
**Presentation Date**: [Date]
|
|
**Presenter**: [Name]
|
|
**Review Status**: [Draft/Final/Approved]
|
|
```
|
|
|
|
### 5.2 Research Summary Template
|
|
**Purpose**: Communicate research findings concisely
|
|
**Usage**: Research Mode - Findings communication
|
|
|
|
```markdown
|
|
# Research Summary: [Research Topic]
|
|
|
|
## Research Overview
|
|
### Research Question
|
|
[Primary question this research addressed]
|
|
|
|
### Methodology
|
|
[Brief description of research approach and methods used]
|
|
|
|
### Timeline
|
|
[When research was conducted]
|
|
|
|
### Scope
|
|
[What was included/excluded in the research]
|
|
|
|
## Executive Summary
|
|
[2-3 paragraph summary of key findings, implications, and recommendations]
|
|
|
|
## Key Findings
|
|
|
|
### Finding 1: [Primary Finding]
|
|
**Summary**: [Brief description of the finding]
|
|
**Evidence**: [Key data points or research evidence]
|
|
**Confidence Level**: [High/Medium/Low and why]
|
|
**Implications**: [What this means for the business/project]
|
|
|
|
### Finding 2: [Secondary Finding]
|
|
**Summary**: [Brief description of the finding]
|
|
**Evidence**: [Key data points or research evidence]
|
|
**Confidence Level**: [High/Medium/Low and why]
|
|
**Implications**: [What this means for the business/project]
|
|
|
|
### Finding 3: [Additional Finding]
|
|
**Summary**: [Brief description of the finding]
|
|
**Evidence**: [Key data points or research evidence]
|
|
**Confidence Level**: [High/Medium/Low and why]
|
|
**Implications**: [What this means for the business/project]
|
|
|
|
## Research Insights
|
|
|
|
### Patterns and Themes
|
|
- [Key pattern or theme identified]
|
|
- [Key pattern or theme identified]
|
|
- [Key pattern or theme identified]
|
|
|
|
### Unexpected Discoveries
|
|
- [Surprising finding that wasn't anticipated]
|
|
- [Surprising finding that wasn't anticipated]
|
|
|
|
### Validation of Assumptions
|
|
**Confirmed Assumptions**:
|
|
- [Assumption that was validated by research]
|
|
- [Assumption that was validated by research]
|
|
|
|
**Challenged Assumptions**:
|
|
- [Assumption that was contradicted by research]
|
|
- [Assumption that was contradicted by research]
|
|
|
|
## Recommendations
|
|
|
|
### Immediate Actions (Next 30 days)
|
|
1. **[Recommendation 1]**
|
|
- **Rationale**: [Why this is recommended]
|
|
- **Expected Impact**: [What outcome is expected]
|
|
- **Owner**: [Who should take this action]
|
|
|
|
2. **[Recommendation 2]**
|
|
- **Rationale**: [Why this is recommended]
|
|
- **Expected Impact**: [What outcome is expected]
|
|
- **Owner**: [Who should take this action]
|
|
|
|
### Strategic Actions (Next 3-6 months)
|
|
1. **[Strategic Recommendation 1]**
|
|
- **Rationale**: [Why this is recommended]
|
|
- **Expected Impact**: [What outcome is expected]
|
|
- **Resources Needed**: [What resources are required]
|
|
|
|
2. **[Strategic Recommendation 2]**
|
|
- **Rationale**: [Why this is recommended]
|
|
- **Expected Impact**: [What outcome is expected]
|
|
- **Resources Needed**: [What resources are required]
|
|
|
|
## Research Limitations
|
|
|
|
### Scope Limitations
|
|
- [What was not covered in this research]
|
|
- [Why certain areas were excluded]
|
|
|
|
### Methodological Limitations
|
|
- [Limitations of the research methods used]
|
|
- [How these limitations might affect findings]
|
|
|
|
### Data Limitations
|
|
- [Limitations in available data]
|
|
- [How data quality might affect conclusions]
|
|
|
|
## Future Research Needs
|
|
|
|
### Priority Research Areas
|
|
1. **[Research Area 1]**
|
|
- **Why Important**: [Why this research is needed]
|
|
- **Suggested Approach**: [How this research should be conducted]
|
|
- **Timeline**: [When this research should be done]
|
|
|
|
2. **[Research Area 2]**
|
|
- **Why Important**: [Why this research is needed]
|
|
- **Suggested Approach**: [How this research should be conducted]
|
|
- **Timeline**: [When this research should be done]
|
|
|
|
### Ongoing Monitoring
|
|
- [What should be monitored on an ongoing basis]
|
|
- [How monitoring should be conducted]
|
|
- [Who should be responsible for monitoring]
|
|
|
|
## Supporting Information
|
|
|
|
### Data Sources
|
|
**Primary Sources**:
|
|
- [Source 1 with brief description]
|
|
- [Source 2 with brief description]
|
|
|
|
**Secondary Sources**:
|
|
- [Source 1 with brief description]
|
|
- [Source 2 with brief description]
|
|
|
|
### Research Team
|
|
- **Lead Researcher**: [Name and role]
|
|
- **Supporting Researchers**: [Names and roles]
|
|
- **Subject Matter Experts**: [Names and expertise areas]
|
|
|
|
### Validation Process
|
|
- [How findings were validated]
|
|
- [Who reviewed the research]
|
|
- [What validation methods were used]
|
|
|
|
## Appendices
|
|
|
|
### Appendix A: Detailed Methodology
|
|
[Detailed description of research methods, sample sizes, data collection procedures]
|
|
|
|
### Appendix B: Raw Data Summary
|
|
[Summary of key data points, statistical analyses, survey results]
|
|
|
|
### Appendix C: Interview Insights
|
|
[Key quotes and insights from interviews or focus groups]
|
|
|
|
### Appendix D: Competitive Analysis Data
|
|
[Detailed competitive analysis findings, feature comparisons, market positioning data]
|
|
|
|
---
|
|
**Research Completed**: [Date]
|
|
**Report Author**: [Business Analyst Name]
|
|
**Next Review**: [Date for follow-up or update]
|
|
```
|
|
|
|
---
|
|
|
|
## 6. Quality Assurance Templates
|
|
|
|
### 6.1 Analysis Quality Checklist
|
|
**Purpose**: Ensure analysis meets quality standards
|
|
**Usage**: All Modes - Quality validation
|
|
|
|
```markdown
|
|
# Analysis Quality Checklist: [Analysis Name]
|
|
|
|
## Pre-Analysis Quality Checks
|
|
|
|
### Objective Clarity
|
|
- [ ] Analysis objectives are clearly defined and measurable
|
|
- [ ] Success criteria are established and agreed upon
|
|
- [ ] Scope is well-defined with clear inclusions and exclusions
|
|
- [ ] Stakeholder expectations are documented and aligned
|
|
|
|
### Methodology Selection
|
|
- [ ] Analysis methodology is appropriate for the objectives
|
|
- [ ] Methods are scientifically sound and validated
|
|
- [ ] Potential biases have been identified and addressed
|
|
- [ ] Sample sizes and selection criteria are appropriate
|
|
|
|
### Resource Preparation
|
|
- [ ] Required data sources have been identified and accessed
|
|
- [ ] Analysis tools and technologies are available and functional
|
|
- [ ] Team members have appropriate skills and training
|
|
- [ ] Timeline is realistic and achievable
|
|
|
|
## During Analysis Quality Checks
|
|
|
|
### Data Quality
|
|
- [ ] Data sources are credible and current
|
|
- [ ] Data completeness meets minimum requirements
|
|
- [ ] Data accuracy has been validated
|
|
- [ ] Data consistency across sources has been verified
|
|
- [ ] Missing data has been identified and addressed
|
|
|
|
### Analysis Rigor
|
|
- [ ] Analysis follows established methodology consistently
|
|
- [ ] Multiple perspectives and sources are considered
|
|
- [ ] Assumptions are documented and tested where possible
|
|
- [ ] Alternative explanations are explored
|
|
- [ ] Findings are cross-validated using multiple methods
|
|
|
|
### Documentation Standards
|
|
- [ ] Analysis steps are clearly documented
|
|
- [ ] Data sources and methods are properly cited
|
|
- [ ] Interim findings are recorded with supporting evidence
|
|
- [ ] Decision points and rationale are documented
|
|
- [ ] Version control is maintained for all documents
|
|
|
|
## Post-Analysis Quality Checks
|
|
|
|
### Findings Validation
|
|
- [ ] Findings are supported by sufficient evidence
|
|
- [ ] Conclusions logically follow from the analysis
|
|
- [ ] Confidence levels are appropriately assigned
|
|
- [ ] Limitations and caveats are clearly stated
|
|
- [ ] Findings have been peer-reviewed
|
|
|
|
### Recommendation Quality
|
|
- [ ] Recommendations directly address the analysis objectives
|
|
- [ ] Recommendations are specific and actionable
|
|
- [ ] Implementation feasibility has been considered
|
|
- [ ] Expected impacts are realistic and measurable
|
|
- [ ] Risks and mitigation strategies are identified
|
|
|
|
### Communication Effectiveness
|
|
- [ ] Key messages are clear and compelling
|
|
- [ ] Technical content is appropriate for the audience
|
|
- [ ] Visual aids enhance understanding
|
|
- [ ] Executive summary captures essential points
|
|
- [ ] Next steps are clearly defined
|
|
|
|
## Stakeholder Validation
|
|
|
|
### Internal Review
|
|
- [ ] Analysis has been reviewed by subject matter experts
|
|
- [ ] Methodology has been validated by peers
|
|
- [ ] Findings have been discussed with analysis team
|
|
- [ ] Recommendations have been assessed for feasibility
|
|
- [ ] Documentation meets organizational standards
|
|
|
|
### Stakeholder Feedback
|
|
- [ ] Key stakeholders have reviewed findings
|
|
- [ ] Stakeholder concerns have been addressed
|
|
- [ ] Recommendations align with stakeholder needs
|
|
- [ ] Implementation approach is acceptable to stakeholders
|
|
- [ ] Success metrics are agreed upon
|
|
|
|
### Final Validation
|
|
- [ ] All quality criteria have been met
|
|
- [ ] Outstanding issues have been resolved
|
|
- [ ] Final approval has been obtained
|
|
- [ ] Handoff documentation is complete
|
|
- [ ] Follow-up plan is established
|
|
|
|
## Quality Metrics
|
|
|
|
### Analysis Quality Score
|
|
**Methodology Rigor**: [Score 1-10] - [Comments]
|
|
**Data Quality**: [Score 1-10] - [Comments]
|
|
**Finding Validity**: [Score 1-10] - [Comments]
|
|
**Recommendation Actionability**: [Score 1-10] - [Comments]
|
|
**Communication Clarity**: [Score 1-10] - [Comments]
|
|
|
|
**Overall Quality Score**: [Average score] - [Overall assessment]
|
|
|
|
### Improvement Areas
|
|
- [Area for improvement 1]
|
|
- [Area for improvement 2]
|
|
- [Area for improvement 3]
|
|
|
|
### Lessons Learned
|
|
- [Key lesson learned 1]
|
|
- [Key lesson learned 2]
|
|
- [Key lesson learned 3]
|
|
|
|
---
|
|
**Quality Review Date**: [Date]
|
|
**Reviewed By**: [Name and role]
|
|
**Quality Status**: [Pass/Conditional Pass/Fail]
|
|
**Next Review**: [Date if applicable]
|
|
```
|
|
|
|
### 6.2 Deliverable Review Template
|
|
**Purpose**: Systematic review of analysis deliverables
|
|
**Usage**: All Modes - Final quality assurance
|
|
|
|
```markdown
|
|
# Deliverable Review: [Deliverable Name]
|
|
|
|
## Review Overview
|
|
### Deliverable Information
|
|
**Deliverable Type**: [Research Report/Project Brief/Analysis Summary/etc.]
|
|
**Created By**: [Business Analyst name]
|
|
**Creation Date**: [Date]
|
|
**Review Date**: [Date]
|
|
**Reviewer**: [Reviewer name and role]
|
|
|
|
### Review Scope
|
|
**Review Objectives**: [What this review aims to achieve]
|
|
**Review Criteria**: [Standards against which deliverable is evaluated]
|
|
**Review Method**: [How the review was conducted]
|
|
|
|
## Content Review
|
|
|
|
### Structure and Organization
|
|
- [ ] Document follows appropriate template structure
|
|
- [ ] Information is logically organized and flows well
|
|
- [ ] Sections are complete and address all required elements
|
|
- [ ] Table of contents is accurate and helpful
|
|
- [ ] Executive summary effectively captures key points
|
|
|
|
**Comments**: [Specific feedback on structure and organization]
|
|
|
|
### Content Quality
|
|
- [ ] Information is accurate and up-to-date
|
|
- [ ] Analysis is thorough and comprehensive
|
|
- [ ] Findings are well-supported by evidence
|
|
- [ ] Recommendations are specific and actionable
|
|
- [ ] Conclusions logically follow from analysis
|
|
|
|
**Comments**: [Specific feedback on content quality]
|
|
|
|
### Clarity and Communication
|
|
- [ ] Writing is clear and easy to understand
|
|
- [ ] Technical terms are defined appropriately
|
|
- [ ] Audience needs are addressed effectively
|
|
- [ ] Key messages are prominent and compelling
|
|
- [ ] Visual aids enhance understanding
|
|
|
|
**Comments**: [Specific feedback on clarity and communication]
|
|
|
|
## Technical Review
|
|
|
|
### Methodology Assessment
|
|
- [ ] Analysis methodology is appropriate and sound
|
|
- [ ] Data sources are credible and sufficient
|
|
- [ ] Analysis techniques are correctly applied
|
|
- [ ] Limitations and assumptions are clearly stated
|
|
- [ ] Bias mitigation strategies are employed
|
|
|
|
**Comments**: [Specific feedback on methodology]
|
|
|
|
### Data and Evidence Review
|
|
- [ ] Data quality meets acceptable standards
|
|
- [ ] Evidence supports conclusions drawn
|
|
- [ ] Sources are properly cited and referenced
|
|
- [ ] Quantitative analysis is mathematically correct
|
|
- [ ] Qualitative analysis follows established frameworks
|
|
|
|
**Comments**: [Specific feedback on data and evidence]
|
|
|
|
### Validation and Verification
|
|
- [ ] Findings have been cross-validated where possible
|
|
- [ ] Alternative explanations have been considered
|
|
- [ ] Peer review has been conducted
|
|
- [ ] Stakeholder input has been incorporated
|
|
- [ ] Quality assurance processes have been followed
|
|
|
|
**Comments**: [Specific feedback on validation]
|
|
|
|
## Stakeholder Alignment Review
|
|
|
|
### Requirements Compliance
|
|
- [ ] Deliverable meets all stated requirements
|
|
- [ ] Scope is appropriate and complete
|
|
- [ ] Timeline commitments have been met
|
|
- [ ] Resource constraints have been respected
|
|
- [ ] Success criteria are addressed
|
|
|
|
**Comments**: [Specific feedback on requirements compliance]
|
|
|
|
### Stakeholder Needs Assessment
|
|
- [ ] Primary stakeholder needs are addressed
|
|
- [ ] Secondary stakeholder concerns are considered
|
|
- [ ] Decision-making requirements are met
|
|
- [ ] Implementation considerations are included
|
|
- [ ] Follow-up needs are identified
|
|
|
|
**Comments**: [Specific feedback on stakeholder alignment]
|
|
|
|
### Business Value Assessment
|
|
- [ ] Business objectives are clearly supported
|
|
- [ ] Value proposition is compelling
|
|
- [ ] ROI considerations are addressed
|
|
- [ ] Risk assessment is comprehensive
|
|
- [ ] Strategic alignment is demonstrated
|
|
|
|
**Comments**: [Specific feedback on business value]
|
|
|
|
## Detailed Feedback
|
|
|
|
### Strengths
|
|
1. **[Strength 1]**: [Detailed description of what was done well]
|
|
2. **[Strength 2]**: [Detailed description of what was done well]
|
|
3. **[Strength 3]**: [Detailed description of what was done well]
|
|
|
|
### Areas for Improvement
|
|
1. **[Improvement Area 1]**:
|
|
- **Issue**: [Description of the issue]
|
|
- **Impact**: [How this affects deliverable quality]
|
|
- **Recommendation**: [Specific suggestion for improvement]
|
|
- **Priority**: [High/Medium/Low]
|
|
|
|
2. **[Improvement Area 2]**:
|
|
- **Issue**: [Description of the issue]
|
|
- **Impact**: [How this affects deliverable quality]
|
|
- **Recommendation**: [Specific suggestion for improvement]
|
|
- **Priority**: [High/Medium/Low]
|
|
|
|
3. **[Improvement Area 3]**:
|
|
- **Issue**: [Description of the issue]
|
|
- **Impact**: [How this affects deliverable quality]
|
|
- **Recommendation**: [Specific suggestion for improvement]
|
|
- **Priority**: [High/Medium/Low]
|
|
|
|
### Critical Issues
|
|
**Issue 1**: [Description of critical issue requiring immediate attention]
|
|
- **Impact**: [Serious consequences if not addressed]
|
|
- **Required Action**: [What must be done to resolve]
|
|
- **Timeline**: [When this must be completed]
|
|
|
|
## Review Recommendations
|
|
|
|
### Approval Status
|
|
- [ ] **Approved**: Deliverable meets all quality standards and requirements
|
|
- [ ] **Approved with Minor Revisions**: Deliverable is acceptable with small changes
|
|
- [ ] **Conditional Approval**: Deliverable requires specific improvements before final approval
|
|
- [ ] **Requires Major Revision**: Deliverable needs significant improvements before resubmission
|
|
- [ ] **Not Approved**: Deliverable does not meet minimum standards
|
|
|
|
### Required Actions
|
|
**High Priority Actions** (Must complete before approval):
|
|
1. [Action item with specific requirements]
|
|
2. [Action item with specific requirements]
|
|
|
|
**Medium Priority Actions** (Should complete for quality improvement):
|
|
1. [Action item with specific requirements]
|
|
2. [Action item with specific requirements]
|
|
|
|
**Low Priority Actions** (Could complete for enhancement):
|
|
1. [Action item with specific requirements]
|
|
2. [Action item with specific requirements]
|
|
|
|
### Follow-up Requirements
|
|
- **Revision Timeline**: [When revisions should be completed]
|
|
- **Re-review Process**: [How revised deliverable will be reviewed]
|
|
- **Final Approval Authority**: [Who provides final approval]
|
|
- **Distribution Plan**: [How approved deliverable will be shared]
|
|
|
|
## Quality Metrics
|
|
|
|
### Quantitative Assessment
|
|
| Quality Dimension | Score (1-10) | Weight | Weighted Score |
|
|
|------------------|--------------|---------|----------------|
|
|
| Content Accuracy | [Score] | 25% | [Weighted Score] |
|
|
| Methodology Rigor | [Score] | 20% | [Weighted Score] |
|
|
| Communication Clarity | [Score] | 20% | [Weighted Score] |
|
|
| Stakeholder Alignment | [Score] | 15% | [Weighted Score] |
|
|
| Actionability | [Score] | 10% | [Weighted Score] |
|
|
| Completeness | [Score] | 10% | [Weighted Score] |
|
|
| **Total Quality Score** | | **100%** | **[Total Score]** |
|
|
|
|
### Qualitative Assessment
|
|
**Overall Quality Rating**: [Excellent/Good/Satisfactory/Needs Improvement/Poor]
|
|
**Key Quality Indicators**:
|
|
- [Most significant quality strength]
|
|
- [Most important quality concern]
|
|
- [Overall quality trajectory]
|
|
|
|
## Lessons Learned
|
|
|
|
### Process Improvements
|
|
- [Improvement to analysis process]
|
|
- [Improvement to review process]
|
|
- [Improvement to communication process]
|
|
|
|
### Template Enhancements
|
|
- [Suggested template improvement]
|
|
- [Suggested template improvement]
|
|
|
|
### Best Practices Identified
|
|
- [Best practice to replicate]
|
|
- [Best practice to replicate]
|
|
|
|
---
|
|
**Review Completed By**: [Reviewer name and signature]
|
|
**Review Date**: [Date]
|
|
**Next Review**: [Date if applicable]
|
|
**Distribution**: [Who receives this review]
|
|
```
|
|
|
|
---
|
|
|
|
## Template Selection Matrix
|
|
|
|
### Quick Reference Guide
|
|
|
|
| Analysis Type | Primary Template | Supporting Templates | Quality Templates |
|
|
|---------------|------------------|---------------------|-------------------|
|
|
| **Market Research** | Research Brief | Competitive Analysis, Research Summary | Analysis Quality Checklist |
|
|
| **User Research** | User Research Plan | Research Summary, Stakeholder Presentation | Deliverable Review |
|
|
| **Problem Analysis** | Root Cause Analysis | SWOT Analysis, Project Brief | Analysis Quality Checklist |
|
|
| **Strategic Planning** | SWOT Analysis | Research Brief, Stakeholder Presentation | Deliverable Review |
|
|
| **Project Initiation** | Project Brief | Requirements Specification, Stakeholder Presentation | Analysis Quality Checklist |
|
|
| **Ideation Sessions** | Ideation Session | SCAMPER Analysis, Research Summary | Deliverable Review |
|
|
|
|
### Template Customization Guidelines
|
|
|
|
#### When to Customize Templates
|
|
- **Industry-Specific Requirements**: Adapt templates for specific industry regulations or standards
|
|
- **Organizational Standards**: Modify templates to match company documentation standards
|
|
- **Project Complexity**: Scale templates up or down based on project size and complexity
|
|
- **Stakeholder Preferences**: Adjust format and detail level for specific stakeholder groups
|
|
|
|
#### Customization Best Practices
|
|
1. **Maintain Core Structure**: Keep essential sections while adapting details
|
|
2. **Preserve Quality Standards**: Ensure customizations don't compromise quality requirements
|
|
3. **Document Changes**: Track template modifications for consistency and improvement
|
|
4. **Validate Effectiveness**: Test customized templates and gather feedback for refinement
|
|
|
|
#### Template Maintenance
|
|
- **Regular Review**: Update templates quarterly based on usage feedback
|
|
- **Version Control**: Maintain clear versioning for all template modifications
|
|
- **Training Updates**: Ensure team training reflects current template versions
|
|
- **Quality Monitoring**: Track template effectiveness through deliverable quality metrics
|
|
|
|
---
|
|
|
|
**Template Guide Version**: 1.0
|
|
**Last Updated**: [Date]
|
|
**Next Review**: [Date]
|
|
**Maintained By**: Business Analyst Team
|
|
```
|