--- title: "Workflows FAQ" description: Common questions about BMad Method workflows and phases --- Quick answers to common questions about BMad Method workflows and phases. ## Questions - [What's the difference between workflow-status and workflow-init?](#whats-the-difference-between-workflow-status-and-workflow-init) - [Can I skip Phase 1 (Analysis)?](#can-i-skip-phase-1-analysis) - [When is Phase 3 (Architecture) required?](#when-is-phase-3-architecture-required) - [What happens if I skip a recommended workflow?](#what-happens-if-i-skip-a-recommended-workflow) - [How do I know when Phase 3 is complete?](#how-do-i-know-when-phase-3-is-complete) - [Can I run workflows in parallel?](#can-i-run-workflows-in-parallel) ### What's the difference between workflow-status and workflow-init? - **workflow-status** — Checks existing status and tells you what's next (use when continuing work) - **workflow-init** — Creates new status file and sets up project (use when starting new project) If status file exists, use workflow-status. If not, use workflow-init. ### Can I skip Phase 1 (Analysis)? Yes! Phase 1 is optional for all levels, though recommended for complex projects. Skip if: - Requirements are clear - No research needed - Time-sensitive work - Small changes (Level 0-1) ### When is Phase 3 (Architecture) required? - **Level 0-1** — Never (skip entirely) - **Level 2** — Optional (only if system design needed) - **Level 3-4** — Required (comprehensive architecture mandatory) ### What happens if I skip a recommended workflow? Nothing breaks! Workflows are guidance, not enforcement. However, skipping recommended workflows (like architecture for Level 3) may cause: - Integration issues during implementation - Rework due to poor planning - Conflicting design decisions - Longer development time overall ### How do I know when Phase 3 is complete? For Level 3-4, run the implementation-readiness workflow. It validates PRD + Architecture + Epics + UX (optional) are aligned before implementation. Pass the gate check = ready for Phase 4. ### Can I run workflows in parallel? Most workflows must be sequential within a phase: - **Phase 1** — brainstorm → research → product-brief (optional order) - **Phase 2** — PRD must complete before moving forward - **Phase 3** — architecture → epics+stories → implementation-readiness (sequential) - **Phase 4** — Stories within an epic should generally be sequential, but stories in different epics can be parallel if you have capacity **Have a question not answered here?** Please [open an issue](https://github.com/bmad-code-org/BMAD-METHOD/issues) or ask in [Discord](https://discord.gg/gk8jAdXWmj) so we can add it!