Commit Graph

4 Commits

Author SHA1 Message Date
Brian Madison 6f7e9f0653 refactor: Major v6 epic creation improvements and documentation overhaul
## Key Changes

### 1. Epic Creation Workflow Enhancements
- Added user-value focused epic structure principles (NO technical layer breakdown)
- Implemented multi-mode detection: CONTINUE, REPLACE, or UPDATE existing epics
- Added comprehensive anti-pattern examples showing wrong vs right epic breakdown
- Epics now created AFTER architecture for technically-informed story breakdown
- Added checkpoint protocol for interactive workflow progression

### 2. Removed Deprecated Solutioning Gate Check
- Deleted entire solutioning-gate-check workflow (682 lines)
- Replaced by new implementation-readiness workflow
- Cleaner separation of concerns in solutioning phase

### 3. PRD Template Simplification
- Removed hardcoded "Implementation Planning", "References", and "Next Steps" sections
- PRD now focuses purely on requirements, not workflow orchestration
- Epics/stories created as separate step after architecture

### 4. Documentation Overhaul (15+ docs updated)
- Updated quick-start guide with v6 workflow sequence
- Clarified that epics are created AFTER architecture, not during PRD
- Updated solutioning docs to reflect implementation-readiness pattern
- Improved agents-guide, brownfield-guide, enterprise docs
- Enhanced glossary, FAQ, and workflow reference documentation

### 5. Workflow Path Adjustments
- All 4 paths updated (enterprise/method × brownfield/greenfield)
- Version bumps across BMGD, BMM, and CIS workflow YAMLs
- Minor instruction file updates for consistency

### Files Changed
- 65 files total: 468 insertions, 978 deletions (net reduction of 510 lines)
- 4 files deleted (entire solutioning-gate-check workflow)
- 1 new directory added (implementation-readiness placeholder)
2025-11-16 00:23:47 -06:00
Brian Madison 1728acfb0f The install directory is now configurable, with a few minute issues 2025-11-08 13:58:43 -06:00
Murat K Ozcan c20ead1acb
refactor: update TEA documentation to align with BMad 4-phase methodology (#870)
* refactor: update TEA documentation to align with BMad 4-phase methodology

* reafactor: address review comments

---------

Co-authored-by: Murat Ozcan <murat@mac.lan>
2025-11-05 13:37:51 -06:00
Brian Madison ba5f76c37d Doc cleanup and mermaid diagram drafts added 2025-11-04 15:02:19 -06:00