docs: chose your tea engagement
This commit is contained in:
parent
8699d7d968
commit
1bfc425aab
|
|
@ -40,6 +40,8 @@ First know there is the full BMad Method Process and then there is a Quick Flow
|
||||||
- Implementation in minutes, not days
|
- Implementation in minutes, not days
|
||||||
- Has a specialized single agent that does all of this: **[Quick Flow Solo Dev Agent](./quick-flow-solo-dev.md)**
|
- Has a specialized single agent that does all of this: **[Quick Flow Solo Dev Agent](./quick-flow-solo-dev.md)**
|
||||||
|
|
||||||
|
- **Testing posture (optional)** - Choose TEA engagement: none, TEA-only (standalone), or integrated by track. See **[Test Architect Guide](./test-architecture.md)**.
|
||||||
|
|
||||||
## 🤖 Agents and Collaboration
|
## 🤖 Agents and Collaboration
|
||||||
|
|
||||||
Complete guide to BMM's AI agent team:
|
Complete guide to BMM's AI agent team:
|
||||||
|
|
|
||||||
|
|
@ -179,6 +179,16 @@ Once epics and stories are created:
|
||||||
|
|
||||||
**Why run this?** It ensures all your planning assets align properly before you start building.
|
**Why run this?** It ensures all your planning assets align properly before you start building.
|
||||||
|
|
||||||
|
#### Optional: Testing Posture (TEA)
|
||||||
|
|
||||||
|
Testing is not mandated by BMad. Decide how you want to engage TEA:
|
||||||
|
|
||||||
|
- **No TEA** - Use your existing team testing approach
|
||||||
|
- **TEA-only (Standalone)** - Use TEA workflows with your own requirements and environment
|
||||||
|
- **TEA-integrated** - Use TEA as part of the BMad Method or Enterprise flow
|
||||||
|
|
||||||
|
See the [Test Architect Guide](./test-architecture.md) for the five TEA engagement models and recommended sequences.
|
||||||
|
|
||||||
#### Context Management Tips
|
#### Context Management Tips
|
||||||
|
|
||||||
- **Use 200k+ context models** for best results (Claude Sonnet 4.5, GPT-4, etc.)
|
- **Use 200k+ context models** for best results (Claude Sonnet 4.5, GPT-4, etc.)
|
||||||
|
|
|
||||||
|
|
@ -6,6 +6,38 @@
|
||||||
- **Mission:** Deliver actionable quality strategies, automation coverage, and gate decisions that scale with project complexity and compliance demands.
|
- **Mission:** Deliver actionable quality strategies, automation coverage, and gate decisions that scale with project complexity and compliance demands.
|
||||||
- **Use When:** BMad Method or Enterprise track projects, integration risk is non-trivial, brownfield regression risk exists, or compliance/NFR evidence is required. (Quick Flow projects typically don't require TEA)
|
- **Use When:** BMad Method or Enterprise track projects, integration risk is non-trivial, brownfield regression risk exists, or compliance/NFR evidence is required. (Quick Flow projects typically don't require TEA)
|
||||||
|
|
||||||
|
## Choose Your TEA Engagement Model
|
||||||
|
|
||||||
|
BMad does not mandate TEA. There are five valid ways to use it (or skip it). Pick one intentionally.
|
||||||
|
|
||||||
|
1. **No TEA**
|
||||||
|
- Skip all TEA workflows. Use your existing team testing approach.
|
||||||
|
|
||||||
|
2. **TEA-only (Standalone)**
|
||||||
|
- Use TEA on a non-BMad project. Bring your own requirements, acceptance criteria, and environments.
|
||||||
|
- Typical sequence: `*test-design` (system or epic) -> `*atdd` and/or `*automate` -> optional `*test-review` -> `*trace` for coverage and gate decisions.
|
||||||
|
- Run `*framework` or `*ci` only if you want TEA to scaffold the harness or pipeline.
|
||||||
|
|
||||||
|
3. **Integrated: Greenfield Simple (BMad Method)**
|
||||||
|
- Phase 3: system-level `*test-design`, then `*framework` and `*ci`.
|
||||||
|
- Phase 4: per-epic `*test-design`, optional `*atdd`, then `*automate` and optional `*test-review`.
|
||||||
|
- Gate: `*trace` Phase 2.
|
||||||
|
|
||||||
|
4. **Integrated: Brownfield Enterprise**
|
||||||
|
- Phase 2: baseline `*trace`.
|
||||||
|
- Phase 3: system-level `*test-design`, then `*framework` and `*ci`.
|
||||||
|
- Phase 4: per-epic `*test-design` focused on regression and integration risks.
|
||||||
|
- Gate: `*nfr-assess` (if not done earlier) and `*trace` Phase 2.
|
||||||
|
- For brownfield BMad Method, follow the same flow with `*nfr-assess` optional.
|
||||||
|
|
||||||
|
5. **Integrated: Greenfield Enterprise**
|
||||||
|
- Phase 2: `*nfr-assess`.
|
||||||
|
- Phase 3: system-level `*test-design`, then `*framework` and `*ci`.
|
||||||
|
- Phase 4: per-epic `*test-design`, plus `*atdd`/`*automate`/`*test-review`.
|
||||||
|
- Gate: `*trace` Phase 2 and archive artifacts as needed.
|
||||||
|
|
||||||
|
If you are unsure, default to the integrated path for your track and adjust later.
|
||||||
|
|
||||||
## TEA Workflow Lifecycle
|
## TEA Workflow Lifecycle
|
||||||
|
|
||||||
TEA integrates into the BMad development lifecycle during Solutioning (Phase 3) and Implementation (Phase 4):
|
TEA integrates into the BMad development lifecycle during Solutioning (Phase 3) and Implementation (Phase 4):
|
||||||
|
|
|
||||||
Loading…
Reference in New Issue